Installation Instructions B292
CAUTION: FAILURE TO INSTALL THIS FIXTURE PROPERLY MAY RESULT IN SERIO US PERSONAL
Airis Sconce 206455 Page 1 of 3
INJURY OR DEATH AND PROPERTY DAMAGE. We rec o mm e nd installation by a licensed electrician.
This product must be installed in accordance with applicable installation code(s), by a person familiar with the
construction and operation of the product and the hazards involved.*
Caution: Do not exceed maximum wattage noted on fixture. Use only recommended bulbs with fixture.
To Install Fixture (Figures 1 & 2)
Component Parts
A Crossbar
B 8-32 x 1” Screw
C Fixture
D 8-32 x 3/8” Screw (2)
E Mounting Bracket
Caution: Be sure power is off at the main breaker box prior to installation.
1. Carefully unpack the fixture from the carton.
2. Using two machine screws (not provided) attach crossbar (A) to the electric
box.
Note: A new electric box comes with screws. When replacing a fixture,
retain the screws for use with the new fixture
3. From center hole of crossbar measure down 18-9/16" and mark location for
first hole for wall mounting bracket (E). Be sure hole location is vertical to
center hole of crossbar (A).
4. Hold mounting bracket (E) so hole matches location marked previously
and mark bottom hole location.
5. Attach mounting bracket (E) using #10 x 1" screws (F).
6. Loosen screws (D) so they do not protrude through edge of mounting bracket (E)
at this time.
Note: Screws are shipped installed in bracket.
7. Install screw (H ) in tab on bottom of fixture (C). Screw should only be installed a
couple of turns at this time (Figure 2).
8. Using suitable wire connectors (not provided), connect the fixture wires to the
supply wires, (white to white, white to black, bare copper or green to bare copper
or green).
Caution: Make sure wire connectors are twisted on securely and no bare wires
are exposed.
9. Carefully tuck all wires behind the fixture (G), align bottom of fixture with
mounting bracket (E), place fix tur e fir mly against the w all a nd fasten with 8-32 x
1" screw (B).
10. Tighten screw (D) on both sides of mounting bracket (E) until snug against
fixture.
11. Install light bulb (not provided).
12. See installation instructions following for option purchased.
F #10 x 1” Screws (2)
G Fixture Back
H Screw
.
(continued)
Hand-Forged, Vermont-Made Lighting and Accessories
154 Route 30 South, Castleton, Vermont 05735
28297
Installation Instructions B292
Airis Sconce 206455 Page 2 of 3
To Install Glass or Mesh Tube Option (Figure 3)
Component Parts
C Fixture
H Screw
I Top Ring
J Glass or Mesh Tube
K Retaining Ring (round one is used for glass/mesh tube)
L Set Screw
1. Slip top ring (I) over top of glass/mesh tube (J).
2. Raise both pieces so the top ring (I) engages with the upper area of
the fixture (C).
3. Slip retaining ring (K) onto bottom of glass/mesh tube (J) and insert
tab through the window area of the fixture (C).
4. Tighten screw (H) to raise retaining ring (K) until it is tight against
bottom of glass/mesh tube (J). It may be necessary to adjust the set
screw (L) while tightening the brass screw (H) to level. Be careful
not to over tighten.
To Install Aluminum Plate Option (Figure 4)
Component Parts
C Fixture
H Screw
I Top Ring
N Aluminum Plate
O Retainer (flat one is used for plate)
P Set Screw
1. Install aluminum plate (N) into slot of retainer (O).
2. Make sure aluminum plate (N) is centered with retainer and
tighten set screw (P) from back.
3. Slip aluminum plate (N) inside top ring (I) so it rests as far to the
back as it can.
4. Raise both pieces so the top ring (I) engages with the upper area
of the fixture (C).
5. Insert retainer (O) through the window area of the fixture (C).
6. Tighten screw (H) to raise retainer (O) until top ring (I) is tight.
Be careful not to over tighten.
(continued)
Hand-Forged, Vermont-Made Lighting and Accessories
154 Route 30 South, Castleton, Vermont 05735
28297