Assembly & Installation Instructions A128
For Presidio Tryne Chandelier 19-443600 Page 1 of 3 _
CAUTION: FAILURE TO INSTALL THIS FIXTURE PROPERLY MAY RESULT IN SERIOUS PERSONAL
INJURY OR DEATH AND PROPERTY DAMAGE. We recommend installation by a licensed electrician.
This product must be installed in accordance with applicable installation code(s), by a person familiar with the
construction and operation of the product and the hazards involved.*
Caution: Do not exceed maximum wattage noted on fixture. Use only recommended bulbs with fixture.
To Attach Fixture Pipes (Figure 1)
Component Parts
A Pipe Assembly
B Canopy Cover
C Fixture Coupling
1. Carefully unpack the fixture from the carton.
2. Carefully slip pipe assembly (A) over fixture wires.
3. Slip canopy cover (B) over pipe assembly (A).
4. Apply a drop of the supplied thread locking compound to the
internal threads of the fixture coupling (B) and screw pipe
assembly (A) into fixture, being careful not to twist the wires.
Note: Application of the thread locking compound is necessary to
prevent the stem from loosening during regular maintenance
and cleaning of the fixture. Be certain to apply the compound.
5. See instructions below to complete the installation.
(Figure 1)
Install the Canopy
Component Parts
B Canopy Cover
D Hanger Plate
E Crossbar
Caution: Be sure power is off at the main breaker box prior to installation.
Caution: This fixture must be supported independently of an outlet box.
See Figure 2 for steps 1 thru 4
(Figures 2 & 3)
F Lag Screw (4)
G Canopy
H 1/4-20 Hex Nut (5)
I Threaded Rod (3)
J Threaded Stud (2)
K Knurl Ball (2)
1. Using at least two lag screws (G) attach cross bar (E) to a structural member in the ceiling, centering the crossbar
over the outlet box. We've supplied lag screws with your fixture; however, different materials and/or construction
methods may require different fasteners. If in doubt, contact a qualified electrician. Do not
attach crossbar directly
to outlet box.
(continued)
Hand-Forged, Vermont-Made Lighting and Accessories
P.O. Box 827, 154 Route 30 South, Castleton, Vermont 05735
20378
Assembly & Installation Instructions A128
For Presidio Tryne Chandelier 19-443600 Page 2 of 3 _
2. Place canopy (G) over hanger plate (D) and gently lower it so that it rests against canopy cover (B) and body of
fixture.
3. Push hanger plate (D) at top of fixture up into electrical box, past the crossbar. Turn the hanger plate and drop the
threaded studs in the hanger plate into the larger inner holes in the crossbar. Make sure no wires are pinched.
4. Using suitable wire connectors (not provided), connect fixture wires to supply wires (white or ribbed side of
fixture cord to white supply, black or smooth side of fixture cord to black supply, and bare copper to bare copper
or green supply). Push wires back into outlet box. Caution: Make sure wire connectors are twisted on securely, and
no bare wire is exposed.
5. Insert three support rods (I) down through outer holes in canopy (G)
See Figure 4 for steps 6 thru 8
6. Slide canopy (G) up over the threaded studs in hanger plate (D) and against ceiling. Secure using two 1/4-20
nuts (H).
7. Start threaded studs (J) into threaded holes in crossbar.
8. Slide canopy cover (B) up over the threaded studs (J) and against the canopy. Secure with the two knurled
balls (K).
ure
(Figure 3).
ure
(Figure 4)
(continued)
Hand-Forged, Vermont-Made Lighting and Accessories
P.O. Box 827, 154 Route 30 South, Castleton, Vermont 05735
20378