Hubbardton Forge 18793 User Manual

Page 1
Assembly & Installation Instructions A196
For Pendant 18-791 & 18-793 Page 1 of 5
CAUTION: FAILURE TO INSTALL THIS FIXTURE PROPERLY MAY RESULT IN SERIOUS PERSONAL INJURY OR DEATH AND PROPERTY DAMAGE. We recommend installation by a licensed electrician.
This product must be installed in accordance with applicable installation code(s), by a person familiar with the construction and operation of the product and the hazards involved.*
Caution: Do not exceed maximum wattage noted on fixture. Use only recommended bulbs with fixture.
Stem Assembly (Figures 1 & 2)
Component Parts
A 8-32 Screw (2) B Top Assembly C Bottom Assembly D Fixture Pipe E Fixture Coupling
1. Carefully unpack the fixture from the carton.
2. Remove two 8-32 screws (A) from top assembly (B) to separate from bottom assembly (C). Place bottom assembly
(C) and two 8-32 screws (A) to the side for later use.
3. Carefully thread fixture pipe (D), threaded end first, over fixture wires.
4. Apply a drop of the supplied thread locking compound to the internal threads of the fixture coupling (E) and screw
stem into fixture, being careful not to twist the wires.
Note: Application of the thread locking compound is necessary to prevent the stem from loosening during regular maintenance and cleaning of the fixture. Be certain to apply the compound.
5. See instructions below to complete the installation.
(Figure 1)
(Figure 2)
Hand-Forged, Vermont-Made Lighting and Accessories P.O. Box 827, 154 Route 30 South, Castleton, Vermont 05735
(continued)
22609
Page 2
Assembly & Installation Instructions A196
For Pendant 18-791 & 18-793 Page 2 of 5
Prepare the Canopy
Component Parts
F Jam Nuts (2) G Crossbar H Threaded Nipple I Canopy J Canopy Ring K Coupling L Canopy Pipe
(Figure 3)
Caution: Be sure power is off at the main breaker box prior to installation.
1. Thread Jam Nuts (F) and Crossbar (G) onto threaded nipple (H) leave both
parts loose.
2. Using two machine screws (not provided), temporarily fasten the crossbar (G)
to the electric box.
replacing a fixture, retain the existing screws for use with the new fixture.
Note: A new electric box comes with screws. When
3. Adjust the length of Threaded Nipple (H) in crossbar (G) so that Canopy Ring
(J) will hold Canopy (F) against the ceiling with no threads showing for best appearance. When the correct adjustment is established, tighten Jam Nuts (F) against crossbar (G) to hold the adjustment.
4. Remove the crossbar and stem from the electrical box and proceed with the
assembly instructions.
Complete Assembly and Install
(Figures 4 & 5, next page)
(Figure 3)
Component Parts
D Fixture Pipe F Jam Nut G Crossbar H Threaded Nipple I Canopy
Caution: Be sure power is off at the main breaker box prior to installation.
J Canopy Ring L Canopy Pipe M Plastic Clutch Sleeve N Clutch O Set Screw
1. Thread crossbar (G) onto threaded nipple (H) until tight against jam nuts (F).
2. Unscrew the clutch (N) from the canopy pipe (L); slide it across the wires and onto the fixture pipe (D). Follow this
with the plastic clutch sleeve (M), oriented so the tapered end of the clutch sleeve nests in the clutch (Figure 4).
3. Thread wires from the fixture pipe (D) through the canopy pipe (L).
4. Slide the canopy pipe (L) as far as necessary to give you the total length of the fixture which you desire. Be careful
not to scratch the pipe surfaces and to pull excess wire up through the canopy pipe (L). There must be a minimum 1­1/2" of inner pipe inside the outer pipe. Screw clutch (N) onto canopy pipe and hand-tighten the clutch to temporarily hold this adjustment. The clutch is not securely fastened at this point; do not depend on it to hold the fixture.
oriented toward the clutch when assembled and securely tighten set screw (Figure 4).
Important: To ensure full connection strength, be sure the tapered end of the plastic clutch sleeve is
5. Using two machine screws (not provided), fasten the crossbar to the electric box.
Note: A new electric box comes with screws. When replacing a fixture, retain the existing screws for use with the new fixture.
(continued)
Hand-Forged, Vermont-Made Lighting and Accessories P.O. Box 827, 154 Route 30 South, Castleton, Vermont 05735
22609
Page 3
Assembly & Installation Instructions A196
(Fig
For Pendant 18-791 & 18-793 Page 3 of 5
6. Using suitable wire connectors (not provided), connect fixture wires to supply wires (white to white or ribbed side
of the fixture cord, black to black or smooth side, and bare copper to bare copper or green supply). Push wires back into outlet box.
Caution: Make sure wire connectors are twisted on securely, and no bare wire is exposed.
7. Slide fixture canopy (I) against ceiling, and secure with canopy ring (J).
8. Refer to instructions following to install glass.
Hand-Forged, Vermont-Made Lighting and Accessories P.O. Box 827, 154 Route 30 South, Castleton, Vermont 05735
ure 4)
(Figure 5)
(continued)
22609
Page 4
Assembly & Installation Instructions A196
For Pendant 18-791 & 18-793 Page 4 of 5
To Assemble Glass or Screen Option
Component Parts
C Bottom Assembly P Tube Assembly Q 6-32 Screws (4) R Screen S Glass Tube T Retainer U Flat Head Screws (3)
1. Remove tube assembly (P) from bottom assembly (C) by removing four 6-32
screws (Q) and separating tube assembly (P) from retainer (T). Set all parts to the side for later use (Figure 6).
2. Remove flat head screws (U) from tube assembly (P) and set aside for later use.
3. Thread screws (U) through either screen (R) or glass tube (S) depending on
option purchased and into tube assembly (P).
4. Tighten the three screws (U) equally into tube assembly so that screen or glass
is centered.
(Figures 6 & 7)
(Figure 6)
(Figure 7)
(continued)
Hand-Forged, Vermont-Made Lighting and Accessories P.O. Box 827, 154 Route 30 South, Castleton, Vermont 05735
22609
Page 5
Assembly & Installation Instructions A196
For Pendant 18-791 & 18-793 Page 5 of 5
To Assemble Bottom
Component Parts
A Bottom Assembly P Tube Assembly Q 6-32 Screws (4) T Retainer
1. Slip 6-32 screw (Q) through retainer (T) and bottom assembly (C). Thread screws (Q)
into tube assembly (P) and tighten with supplied Allen wrench.
To Install Glass or Screen Option & Bulb
Component Parts
A 8-32 Screw (2) B Top Assembly
C Bottom Assembly
1. Install light bulb (not included).
2. Install 8-32 screw (A) through top assembly (B) and thread into bottom assembly
(C). To replace bulb the two 8-32 (A) screws are removed to separate bottom assembly from top assembly.
3. Restore electricity at main breaker.
(Figure 8)
(Figure 9)
(Figure 8)
If you need further assistance, or find that you are missing any parts, please contact the dealer from which you purchased this product. We hope you enjoy your fixture!
* Hubbardton Forge will not be liable for injury or damage caused by improper installation, lamping or use of this fixture.
Hand-Forged, Vermont-Made Lighting and Accessories P.O. Box 827, 154 Route 30 South, Castleton, Vermont 05735
(Figure 9)
22609
Loading...