Assembly & Installation Instructions A196
For Pendant 18-791 & 18-793 Page 1 of 5
CAUTION: FAILURE TO INSTALL THIS FIXTURE PROPERLY MAY RESULT IN SERIOUS PERSONAL
INJURY OR DEATH AND PROPERTY DAMAGE. We recommend installation by a licensed electrician.
This product must be installed in accordance with applicable installation code(s), by a person familiar with the
construction and operation of the product and the hazards involved.*
Caution: Do not exceed maximum wattage noted on fixture. Use only recommended bulbs with fixture.
Stem Assembly (Figures 1 & 2)
Component Parts
A 8-32 Screw (2)
B Top Assembly
C Bottom Assembly
D Fixture Pipe
E Fixture Coupling
1. Carefully unpack the fixture from the carton.
2. Remove two 8-32 screws (A) from top assembly (B) to separate from bottom assembly (C). Place bottom assembly
(C) and two 8-32 screws (A) to the side for later use.
3. Carefully thread fixture pipe (D), threaded end first, over fixture wires.
4. Apply a drop of the supplied thread locking compound to the internal threads of the fixture coupling (E) and screw
stem into fixture, being careful not to twist the wires.
Note: Application of the thread locking compound is necessary to prevent the stem from loosening during regular
maintenance and cleaning of the fixture. Be certain to apply the compound.
5. See instructions below to complete the installation.
(Figure 1)
(Figure 2)
Hand-Forged, Vermont-Made Lighting and Accessories
P.O. Box 827, 154 Route 30 South, Castleton, Vermont 05735
(continued)
22609
Assembly & Installation Instructions A196
For Pendant 18-791 & 18-793 Page 2 of 5
Prepare the Canopy
Component Parts
F Jam Nuts (2)
G Crossbar
H Threaded Nipple
I Canopy
J Canopy Ring
K Coupling
L Canopy Pipe
(Figure 3)
Caution: Be sure power is off at the main breaker box prior to installation.
1. Thread Jam Nuts (F) and Crossbar (G) onto threaded nipple (H) leave both
parts loose.
2. Using two machine screws (not provided), temporarily fasten the crossbar (G)
to the electric box.
replacing a fixture, retain the existing screws for use with the new fixture.
Note: A new electric box comes with screws. When
3. Adjust the length of Threaded Nipple (H) in crossbar (G) so that Canopy Ring
(J) will hold Canopy (F) against the ceiling with no threads showing for best
appearance. When the correct adjustment is established, tighten Jam Nuts (F)
against crossbar (G) to hold the adjustment.
4. Remove the crossbar and stem from the electrical box and proceed with the
assembly instructions.
Complete Assembly and Install
(Figures 4 & 5, next page)
(Figure 3)
Component Parts
D Fixture Pipe
F Jam Nut
G Crossbar
H Threaded Nipple
I Canopy
Caution: Be sure power is off at the main breaker box prior to installation.
J Canopy Ring
L Canopy Pipe
M Plastic Clutch Sleeve
N Clutch
O Set Screw
1. Thread crossbar (G) onto threaded nipple (H) until tight against jam nuts (F).
2. Unscrew the clutch (N) from the canopy pipe (L); slide it across the wires and onto the fixture pipe (D). Follow this
with the plastic clutch sleeve (M), oriented so the tapered end of the clutch sleeve nests in the clutch (Figure 4).
3. Thread wires from the fixture pipe (D) through the canopy pipe (L).
4. Slide the canopy pipe (L) as far as necessary to give you the total length of the fixture which you desire. Be careful
not to scratch the pipe surfaces and to pull excess wire up through the canopy pipe (L). There must be a minimum 11/2" of inner pipe inside the outer pipe. Screw clutch (N) onto canopy pipe and hand-tighten the clutch to
temporarily hold this adjustment. The clutch is not securely fastened at this point; do not depend on it to hold the
fixture.
oriented toward the clutch when assembled and securely tighten set screw (Figure 4).
Important: To ensure full connection strength, be sure the tapered end of the plastic clutch sleeve is
5. Using two machine screws (not provided), fasten the crossbar to the electric box.
Note: A new electric box comes with screws. When replacing a fixture, retain the existing screws for use with the
new fixture.
(continued)
Hand-Forged, Vermont-Made Lighting and Accessories
P.O. Box 827, 154 Route 30 South, Castleton, Vermont 05735
22609