
Assembly & Installation Instructions   A229 
For Ondrian Adjustable Pendant 13-6310    Page 1 of 3  
CAUTION: FAILURE TO INSTALL THIS FIXTURE PROPERLY MAY RESULT IN SERIOUS PERSONAL 
INJURY OR DEATH AND PROPERTY DAMAGE. We recommend installation by a licensed electrician. 
This product must be installed in accordance with applicable installation code(s), by a person familiar with the 
construction and operation of the product and the hazards involved.* 
Caution: Do not exceed maximum wattage noted on fixture. Use only recommended bulbs with fixture. 
Stem Assembly (Figure 1) 
Component Parts 
A Fixture Pipe 
B Fixture Coupling 
1. Carefully unpack the fixture from the carton. 
2. Carefully thread fixture pipe (A), threaded end first, over fixture wires. 
3. Apply a drop of the supplied thread locking compound to the internal threads 
of fixture coupling (B) and screw stem into fixture, being careful not to twist 
or pinch the wires. 
Note: Application of the thread locking compound is necessary to prevent 
the stem from loosening during regular maintenance and cleaning of the 
fixture. Be certain to apply the compound.
4. See instructions below to complete the installation. 
(Figure 1) 
Prepare the Canopy
Component Parts 
C Jam Nut (2) 
D Crossbar 
E Threaded Nipple 
F Canopy 
G Canopy Ring 
H Coupling 
I Canopy Pipe 
 (Figure 2) 
Caution: Be sure power is off at the main breaker box prior to installation. 
1. Thread Jam Nut (C) and Crossbar (D) onto threaded nipple (E) leave both parts 
loose. 
2. Using two machine screws (not provided), temporarily fasten the crossbar (D) 
to the electric box. 
Note: A new electric box comes with screws. When replacing a fixture, retain 
the existing screws for use with the new fixture.
3. Adjust the length of Threaded Nipple (E) in crossbar (D) so that Canopy Ring 
(G) will hold Canopy (F) against the ceiling with no threads showing for best 
appearance. When the correct adjustment is established, tighten Jam Nut (C) 
against crossbar (D) to hold the adjustment. 
4. Remove the crossbar and stem from the electrical box and proceed with the 
assembly instructions. 
 Hand-Forged, Vermont-Made Lighting and Accessories 
  P.O. Box 827, 154 Route 30 South, Castleton, Vermont 05735
(Figure 2) 
(continued) 
  24157 

Assembly & Installation Instructions   A229 
For Ondrian Adjustable Pendant 13-6310    Page 2 of 3  
Complete Assembly and Install
Component Parts 
A Fixture Pipe 
C Jam Nut 
D Crossbar 
E Threaded Nipple 
F Canopy 
Caution: Be sure power is off at the main breaker box prior 
to installation. 
1. Thread crossbar (D) onto threaded nipple (E) until tight 
against jam nut (C). 
2. Unscrew the clutch (K) from the canopy pipe (I); slide it 
across the wires and onto the fixture pipe (A). Follow this 
with the plastic clutch sleeve (J), oriented so the tapered 
end of the clutch sleeve nests in the clutch (Figure 3). 
3. Thread wires from the fixture pipe (A) through the canopy 
pipe (I). 
4. Slide the canopy pipe (I) as far as necessary to give you the total length 
of the fixture which you desire. Be careful not to scratch the pipe 
surfaces and to pull excess wire up through the canopy pipe (I). There 
must be a minimum 1-1/2" of inner pipe inside the outer pipe. Screw 
clutch (K) onto canopy pipe and hand-tighten the clutch to temporarily 
hold this adjustment. The clutch is not securely fastened at this point; 
do not depend on it to hold the fixture. 
Important: To ensure full connection strength, be sure the tapered end 
of the plastic clutch sleeve is oriented toward the clutch when 
assembled and securely tighten set screw (Figure 4).
5. Using two machine screws (not provided), fasten the crossbar to the 
electric box. 
Note: A new electric box comes with screws. When replacing a fixture, 
retain the existing screws for use with the new fixture.
6. Using suitable wire connectors (not provided), connect fixture wires to 
supply wires (white to white or ribbed side of the fixture cord, black to 
black or smooth side, and bare copper to bare copper or green supply). 
Push wires back into outlet box. 
Caution: Make sure wire connectors are twisted on securely, and no 
bare wire is exposed.
7. Slide fixture canopy (F) against ceiling, and secure with canopy 
ring (G). 
8. Refer instructions below and install glass. 
 (Figures 3 & 4) 
G Canopy Ring 
I Canopy Pipe 
J  Plastic Clutch Sleeve 
K Clutch 
L Set Screw 
(Figure 3) 
(Figure 4) 
(continued) 
 Hand-Forged, Vermont-Made Lighting and Accessories 
  P.O. Box 827, 154 Route 30 South, Castleton, Vermont 05735
  24157 

Assembly & Installation Instructions   A229 
For Ondrian Adjustable Pendant 13-6310    Page 3 of 3  
To Install Glass with G9 Option
Component Parts 
M Socket (4) 
N Bulb (Included)(4) 
O Glass (4) 
P Spacer (4) 
Q Retaining Ring (4) 
R Socket Tool 
1. Remove retaining rings (Q) and spacers (P) from sockets (M). Parts are shipped 
installed on sockets. Save for later use. 
2. Install light bulbs (N). Be careful not to touch bulb with bare hands; oil from the 
hands will dramatically reduce bulb life. 
3. Slip glass (O) over socket (M). 
4. Slip spacer (P) over socket (M) so it rests on glass (O). 
5. Thread retaining ring (Q) onto socket (M) using provided socket tool (S). Be careful 
not to over tighten. 
6. Repeat steps 3 thru 5 for all arms. 
7. Restore electricity at main breaker. 
If you need further assistance, or find that you are missing any parts, please contact the dealer from which you purchased 
this product. We hope you enjoy your fixture! 
* Hubbardton Forge will not be liable for injury or damage caused by improper installation, lamping or use of this fixture.
 (Figure 5) 
(Figure 5) 
 Hand-Forged, Vermont-Made Lighting and Accessories 
  P.O. Box 827, 154 Route 30 South, Castleton, Vermont 05735
  24157