RETIRED: Retired products sold prior to the November 1, 2015 separation of Hewlett-Packard Company into Hewlett Packard Enterprise Company and HP Inc. may
have older product names and model numbers that differ from current models.
QuickSpecs
HP Modular Cooling System G2
HP Modular Cooling System G2
HP Modular Cooling System G2HP Modular Cooling System G2
Overview
DA - 12919 Worldwide — Version 7 — June 20, 2011
Page 1
RETIRED: Retired products sold prior to the November 1, 2015 separation of Hewlett-Packard Company into Hewlett Packard Enterprise Company and HP Inc. may
have older product names and model numbers that differ from current models.
QuickSpecs
HP Modular Cooling System G2
HP Modular Cooling System G2
HP Modular Cooling System G2HP Modular Cooling System G2
Overview
At a Glance
At a Glance
At a GlanceAt a Glance
Supports cooling two HP 42U racks at a time at 17.5kW per side or 35kW in a single rack
35kW of cooling capacity, up from 30kW
Six hot swappable high airflow fans
High air flow heat exchanger with bi-directional air distribution
CTO capability of up to 2000 Lbs dynamic load for both the standard MCS G2 rack as well as the MCS G2 Expansion rack
Expand MCS G2 to support a second rack with MCS G2 Expansion rack
Automatic door opening system for both racks ships standard with every MCS G2. The automatic door opening mechanism is
not CTO capable and therefore ships in the accessories box and is to be installed onsite
42U rack height (2 meters) and 1.5 racks wide to maintain datacenter tiling configuration.
Environmental Monitor with SNMP integration to Systems Insight Manager (SIM)
Power Input Redundancy for dual power source
Condensate Evacuation system to prevent condensation from entering air stream
Site Preparation Guide available at:
http://h20000.www2.hp.com/bizsupport/TechSupport/DocumentIndex.jsp?contentType=SupportManual&lang=en
&cc=us&docIndexId=64179&taskId=101&prodTypeId=3447589&prodSeriesId=3657806
DA - 12919 Worldwide — Version 7 — June 20, 2011
Page 2
RETIRED: Retired products sold prior to the November 1, 2015 separation of Hewlett-Packard Company into Hewlett Packard Enterprise Company and HP Inc. may
have older product names and model numbers that differ from current models.
QuickSpecs
HP Modular Cooling System G2
HP Modular Cooling System G2
HP Modular Cooling System G2HP Modular Cooling System G2
Models
Site Preparation
Site Preparation
Site PreparationSite Preparation
HP Modular Cooling System G2 Hook up Kit
HP MCS G2 Site Preparation Service
NOTE:
NOTE:
NOTE: NOTE:
http://h20219.www2.hp.com/services/cache/11077-0-0-225-121.aspx.
NOTE:
NOTE:
NOTE:NOTE:
preparation purposes. The kit contains set of 1.0 inch diameter, Couplings and Parallel-to-Tapered adapter
included to address regional differences.
Modular Cooling System G2 (MCS G2)
Modular Cooling System G2 (MCS G2)
Modular Cooling System G2 (MCS G2)Modular Cooling System G2 (MCS G2)
HP Modular Cooling System G2 Rack
HP 10642 G2 Rack Rear Extension Kit
NOTE:
NOTE:
NOTE: NOTE:
Monitored PDU
HP Modular Cooling System G2 10642 G2 Expansion Rack
HP Install Modular Cooling System Service
NOTE:
NOTE:
NOTE:NOTE:
CTO.
NOTE:
NOTE:
NOTE: NOTE:
CTO.
NOTE:
NOTE:
NOTE: NOTE:
unit attached.
NOTE:
NOTE:
NOTE: NOTE:
Use Per Event Support and Consulting Service
The Modular Cooling System Water Hook-up kit can be ordered ahead of the MCS G2 for site
The Rack Rear Extension kit is required when racking the HP c7000 Enclosure in conjunction with an HP
Install MCS G2 per the product user installation manual. All MCS G2 units ship with shock pallet for
Install MCS G2 per the product user installation manual. All MCS G2 units ship with shock pallet for
The purchase of HP Modular Cooling System G2 (P/N AF025A) includes 10642 G2 rack and cooling
A loaded MCS G2 rack should only be moved by professional movers.
AF089A
N/A
AF025A
AF036A
AF026A
UE005E
DA - 12919 Worldwide — Version 7 — June 20, 2011
Page 3
RETIRED: Retired products sold prior to the November 1, 2015 separation of Hewlett-Packard Company into Hewlett Packard Enterprise Company and HP Inc. may
have older product names and model numbers that differ from current models.
QuickSpecs
Standard Features
Product Description
Product Description
Product DescriptionProduct Description
HP Modular Cooling System G2 rack is designed for high density server and blade deployments. It recirculates and cools the hot server exhaust air through the heat exchanger residing in the MCS G2 unit.
The air is then expelled in front of the enclosed rack at a much lower temperature providing sufficient
cool air for a load of 35kW of servers or blades, or two racks at 17.5kW each.
The MCS G2 unit contains six fans and a heat exchanger deployed along the full height of the rack to
ensure that all the equipment installed receives sufficient chilled air. All fans are swappable while the unit
is online, providing great servicing flexibility. Redundant power is ensured through a failover power switch
that can be connected to two power sources. The environmental monitor controls the air temperature to
the servers and adjusts automatically to meet the pre-established air temperature goal. The
environmental monitor interacts with HP SIM (Systems Insight Manager) via SNMP traps.
The Water Hookup kit is made available as a separate kit to prepare the water hookup ahead of the
arrival of the MCS G2.
A Site Preparation Guide is available for download at:
http://h20000.www2.hp.com/bizsupport/TechSupport/DocumentIndex.jsp?contentType=
SupportManual&lang=en&cc=us&docIndexId=64179&taskId=101&prodTypeId=3447589&prod
SeriesId=3657806
HP Modular Cooling System G2
HP Modular Cooling System G2
HP Modular Cooling System G2HP Modular Cooling System G2
.
This guide provides details on how to prepare the datacenter for the successful deployment of the MCS
G2. It may be advisable to contact HP Professional Services for a Site Datacenter Thermal Quick
Assessment Service, reference HB691A1 and HB691AE. Visit
additional information.
The MCS G2 unit mounted next to a HP 10000 G2 Series rack is designed to occupy 1.5 tiles in the
datacenter maintaining tile count for cable routing and access to the plenum.
The MCS G2 and the MCS G2 Expansion Rack are CTO capable with a dynamic load capacity of 2000
Lbs each. For HP CTO services go to:
http://h18004.www1.hp.com/products/servers/platforms/rackandpower.html
NOTE:
NOTE: A loaded MCS G2 unit should only be moved by professional movers.
NOTE:NOTE:
NOTE:
NOTE:
We support 3000lbs of static IT Equipment on leveling feet.
NOTE:NOTE:
Caution: Static loading limits cannot be achieved if the rack is
1.
Not on its leveling feet and
2.
Rolled or pushed from its position.
Not responsible for floor damages where the rack resides. Your floor weight capacity may not support
the full static load capacity. Check with your floor provider before loading.
http://www.hp.com/hps/support