![](/html/5e/5ebe/5ebe2e02e80bd1d6ccb5f10f1831a4702ecf4c6c942192b46a7dbad9679f25f7/bg1.png)
ASSEMBLY INSTRUCTION
ITEM# 5960-90851-BRN Fair Oaks 5/0 Upholstered Headboard
5960-90852-MULTI Fair Oaks 5/0 Footboard
5960-90867-BRN Fair Oaks 6/0-6/6 Upholstered Headboard
5960-90868-MULTI Fair Oaks 6/0-6/6 Footboard
5960-90853-BRN Fair Oaks 5/0-6/6 Rails
5960-90863-BRN Fair Oaks 6/0 Rails
Caution: Please make sure you have all parts indicated below prior to assembly.
This bed is heavy and can best be assembled with the help of two or more people.
![](/html/5e/5ebe/5ebe2e02e80bd1d6ccb5f10f1831a4702ecf4c6c942192b46a7dbad9679f25f7/bg2.png)
Please note the hardware bag to assemble side rails to HB&FB is in the box of side rails.
Assembly steps:
1. Insert 2 bolts (H) into holes of each side post on Headboard (A) and Footboard (B), attach the
ends of side rails (C) to bolts (H) on posts by using 2 curved washers (G) and 2 nuts (E), tighten
nuts (E) securely with spanner wrench (F). (See diagram 1)
Diagram 1
2. Take out center supports (L) from the rail box, attach center supports (L) to slats (D) by using 2
bolts (Q), 2 lock washers (V) and 2 flat washers (U). Secure bolts (Q) by using allen wrench (R).
(See diagram 2)
Diagram 2
3. Attach slats (D) to side rails (C), align pre-drilled holes on the slats to holes on the cleats of side
rails (C), using screws (K) to tighten both. (See diagram 3)
Diagram 3