• Obtaining Documentation and Submitting a Service Request, page 16
About this Guide
This guide describes how to install the Cisco Edge 300 series switch on a wall or desktop and describes
the LEDs and ports.
For configuration information, see the Cisco Edge 300 series switch documentation on Cisco.com. For
system requirements, important notes, limitations, open and resolved bugs, and documentation updates,
see the release notes on Cisco.com.
Americas Headquarters:
Cisco Systems, Inc., 170 West Tasman Drive, San Jose, CA 95134-1706 USA
Box Contents
1
2
3
4
5
678
9
10
11
9
Box Contents
1Cisco Edge 300 series switch7Four M3.5 x 16-mm Phillips head tapping
1
screws
2Power adapter8Four plastic drywall anchors
3Power cord9Cable tie
4Power cord retainer
5Wall-mount bracket
6Four M3.0 x 6-mm Phillips pan head screws
1. These parts are included in the wall-mount kit (ACC-E300-WALL).
2. These parts are included in the desktop kit (ACC-E300-DESK).
NoteVerify that you have received these items. If any item is missing or damaged, contact your Cisco
1, 2
1
10 Desktop bracket
11 Two M3.0 x 6-mm Phillips pan head screws
1
1, 2
2
1
2
representative or reseller.
Cisco Edge 300 Series Switch Installation Guide
2
OL-24909-01
Overview
255418
1
Table 1Cisco Edge 300 Series Models
ModelDescription
CS-E300-AP-K9Cisco Edge 300 series switch with WiFi and Bluetooth
CS-E300-K9Cisco Edge 300 series switch
HS-E300-AP-K9HSJC/Cisco Edge 300 series switch with WiFi and Bluetooth
HS-E300-K9HSJC/Cisco Edge 300 series switch
Figure 1Cisco Edge 300 Series Switch — Front
234
1
HDMI
GE
POWER
Overview
213 457
6
255417
1USB ports5Gigabit Ethernet (uplink) port
2HDMI port6Ethernet (downlink) ports
3Audio out port7Power
4Audio in port
Figure 2Cisco Edge 300 Series Switch — Left
1USB port
Figure 3Cisco Edge 300 Series Switch — Rear
RESET
OL-24909-01
12
1Power button2Reset button
255419
Cisco Edge 300 Series Switch Installation Guide
3
Overview
Port Descriptions
USB
There are four USB 2.0 Type-A ports. Each USB port can provide up to 5 W of power to a connected
device.
You can connect a wired USB keyboard and mouse, a wireless USB receiver for a keyboard and mouse,
a USB camera, or a USB thumb drive.
HDMI
The HDMI port supports high-definition video output at 720p or 1080p.
Audio In
You can connect a microphone that uses a 3.5 mm connector.
Audio Out
You can connect headphones or external speakers that use a 3.5 mm connector.
Gigabit Ethernet
The Gigabit Ethernet uplink port provides a 10/100/1000 Mb/s connection to a Catalyst 2000 or
Catalyst 3000 series switch.
Ethernet
The Fast Ethernet ports provide 10/100 Mb/s connections to computers or other devices.
Wireless Features
WiFi
Supports 802.11b/g/n wireless clients.
Bluetooth
Supports Human Interaction Design Protocol (HIDP) for remote control or input devices.
Cisco Edge 300 Series Switch Installation Guide
4
OL-24909-01
LEDs
1
234
5
Overview
Figure 4Cisco Edge 300 Series Switch LEDs
213 45
R
1
234
R
5
1Ethernet downlink4Bluetooth
2Gigabit Ethernet uplink5Power
3WiFi
1. Only CS-E300-AP-K9 and HS-E300-AP-K9.
Ta b l e 2L E D s
1
LEDColorMeaning
Ethernet
downlink
OffNo link.
GreenLink present, no activity. Port is operating at 100 Mb/s.
Blinking greenActivity. Port is sending or receiving data at 100 Mb/s.
AmberLink present, no activity. Port is operating at 10 Mb/s.
Blinking amber Activity. Port is sending or receiving data at 10 Mb/s.
Gigabit
Ethernet
OffNo link.
GreenLink up.
Blinking greenActivity.
255420
1
OL-24909-01
Cisco Edge 300 Series Switch Installation Guide
5
Installing the Switch
Table 2LEDs (continued)
LEDColorMeaning
WiFiOffWiFi is disabled.
GreenWiFi is enabled and functioning.
Blinking greenWiFi is transmitting data.
BluetoothOffBluetooth is disabled.
GreenBluetooth is enabled and functioning.
PowerOffThere is no power or the self test has failed.
GreenSystem is operating normally.
Blinking greenSystem software is being upgraded.
Blinking amber System software download has failed.
Installing the Switch
You can install the switch on a wall by using the wall-mount bracket or install the switch on a desk or
table by using the desktop bracket. You can also install the switch in a ventilated cabinet using the
wall-mount or desktop bracket.
Equipment That You Need
• Phillips screwdriver
• Scratch awl or other sharp pointed object (wall-mount)
• Electric drill with a 6-mm drill bit (wall-mount)
Before You Begin
Before installing the switch, verify that these guidelines are met:
• Front clearance so that the LEDs can be seen.
• AC power cord reaches from the AC power outlet to the rear-panel connector.
• Cabling is away from sources of electrical noise, such as radios, power lines, and fluorescent
lighting. Make sure that the cabling is safely away from other devices that might damage the cables.
• Airflow around the switch is unrestricted.
• Temperature around the unit does not exceed 104°F (40°C).
• Humidity around the switch does not exceed 85 percent.
• Altitude at the installation site is below 10,000 feet.
• For Ethernet ports, cables from the switch to connected devices are not longer than 328 feet
(100 meters).
Cisco Edge 300 Series Switch Installation Guide
6
OL-24909-01
Warning Statements
Statement 1005
Installing the Switch
Warning
Warning
Warning
This product relies on the building’s installation for short-circuit (overcurrent) protection. Ensure that
the protective device is rated not greater than:
20A
Statement 1005
Statement 1071
IMPORTANT SAFETY INSTRUCTIONS
This warning symbol means danger. You are in a situation that could cause bodily injury. Before you
work on any equipment, be aware of the hazards involved with electrical circuitry and be familiar
with standard practices for preventing accidents. Use the statement number provided at the end of
each warning to locate its translation in the translated safety warnings that accompanied this
device.
SAVE THESE INSTRUCTIONS
Statement 1019
The plug-socket combination must be accessible at all times, because it serves as the main
disconnecting device.
Statement 1071
Statement 1019
Warning
Warning
Warning
Statement 1030
Only trained and qualified personnel should be allowed to install, replace, or service this equipment.
Statement 1030
Statement 1040
Ultimate disposal of this product should be handled according to all national laws and regulations.
Statement 1040
Statement 1044
For connections outside the building where the equipment is installed, the following ports must be
connected through an approved network termination unit with integral circuit protection:
10/100/1000 Ethernet
Statement 1044
OL-24909-01
Cisco Edge 300 Series Switch Installation Guide
7
Installing the Switch
Statement 1047
Warning
Warning
Warning
CautionBe aware of the size and weight of the switch when mounting. Ensure that the mounting location has a
To prevent the system from overheating, do not operate it in an area that exceeds the maximum
recommended ambient temperature of:
104°F (40°C)
Statement 1074
Installation of the equipment must comply with local and national electrical codes.
Statement 1076
To prevent airflow restriction, allow clearance around the ventilation openings to be at least:
3 inches (7.6 cm)
Statement 1047
Statement 1076
stable flat surface and can safely support the weight of the switch.
Installing the Switch on a Wall
Statement 378
Statement 1074
Warning
Read the wall-mounting instructions carefully before beginning installation. Failure to use the
correct hardware or to follow the correct procedures could result in a hazardous situation to people
and damage to the system.
Statement 378
You can mount the switch horizontally or vertically on a wall.
NoteThe wall-mount bracket has four slots (in two pairs) on its bottom panel (see Figure 5).
Cisco Edge 300 Series Switch Installation Guide
8
OL-24909-01
Figure 5Bracket Slot Distances for Wall-Mounting
1
Installing the Switch
255421
2
14.17 inches (106 mm)26.02 inches (153 mm)
OL-24909-01
Cisco Edge 300 Series Switch Installation Guide
9
Installing the Switch
330223
1
Step 1Use the four M3.0 x 6-mm Phillips pan head screws to attach the wall-mount bracket to the bottom of
the switch (see Figure 6).
Figure 6Attaching the Wall-Mount Bracket
10
1M3.0 x 6mm Phillips pan head screws
Step 2
Step 3Slide the power cord retainer along the power cord, and snap it into the chassis (see Figure 7).
Cisco Edge 300 Series Switch Installation Guide
Connect all the cables that are necessary for your installation.
OL-24909-01
255427
Figure 7Installing the Power Cord Retainer
POWER
Installing the Switch
255426
Use the supplied cable tie and built-in cable clip to secure the cables to the bracket (see Figure 8).
Figure 8Routing the Cables — Wall-Mount
Step 4
Determine where you want to mount the switch and its orientation. Make sure that the wall is smooth,
flat, dry, and sturdy. Make sure that the location is within reach of an electrical outlet.
Step 5Mark the locations on the wall for the mounting screws. Make sure that the holes are the proper distance
apart, depending on the switch orientation.
OL-24909-01
Cisco Edge 300 Series Switch Installation Guide
11
Installing the Switch
255424
1
NoteIf you are mounting the switch on a wooden wall (not drywall), you can screw the tapping screws
directly into the wall.
Step 6Drill four 0.25-inch (6-mm) holes that are at least 1 inch (25 mm) deep.
Step 7Insert the plastic drywall anchors into the holes.
Step 8Insert a tapping screw into each anchor, and leave 0.06 inches (1.5 mm) of the screw head exposed.
Step 9Place the bracket slots over the tapping screws, and slide the bracket down until the screws fit snugly
into the slots.
Install the Switch on a Desk or Table
Step 1Use the two M3.0 x 6-mm Phillips pan head screws to attach the desktop bracket to the bottom of the
switch (see Figure 9).
Figure 9Attaching the Desktop Bracket
12
1M3.0 x 6mm Phillips pan head screws
Step 2
Cisco Edge 300 Series Switch Installation Guide
Connect all the cables that are necessary for your installation.
OL-24909-01
Installing the Switch
255428
Step 3Slide the power cord retainer along the power cord, and snap it into the chassis (see Figure 7).
Figure 10Installing the Power Cord Retainer
POWER
Step 4
255426
Use the supplied cable tie to secure the cables to the bracket (see Figure 11).
Figure 11Routing the Cables — Desktop
OL-24909-01
Step 5
Place the switch on a desk or table.
Cisco Edge 300 Series Switch Installation Guide
13
Installing the Switch
255799
1
2
3
4
5
Installing the Switch in a Cabinet
You can install the switch in a ventilated cabinet. To ensure adequate ventilation, make sure that the
cabinet meets the following specifications:
• Minimum dimensions (H x W x D): 19.69 x 19.69 x 15.75 inches (50 x 50 x 40 cm)
• Ventilation openings:
–
The front panel must have one ventilation opening measuring at least 11.81 x 5.91 inches
(30 x 15 cm). The ratio of the ventilation openings should be greater than 30%.
–
Each side panel must have two ventilation openings (one along the top, and one along the
bottom) measuring at least 12.60 x 3.54 inches (32 x 9 cm). The ratio of the ventilation openings
should be greater than 30%.
• Switch placement:
–
For wall-mount placement, install the switch at the rear of the cabinet.
–
For desktop placement, place the switch at the center of the cabinet.
Figure 12Cabinet Dimensions
111.81 x 5.91 inches (30 x 15 cm)419.69 inches (50 cm)
212.60 x 3.54 inches (32 x 9 cm)519.69 inches (50 cm)
315.75 inches (40 cm)
14
Cisco Edge 300 Series Switch Installation Guide
OL-24909-01
Powering on the Switch
Connect the power cord to an electrical outlet. Press the Power button to power on the switch.
See Table 2 on page 5 for a description of the LED colors and their meanings.
Restoring the Factory Settings
CautionResetting the switch deletes the existing configuration.
Step 1Press and hold the Reset button for more than 5 seconds.
Step 2Press and hold the Power button until the switch shuts down.
Step 3Press the Power button to restart the switch.
Powering on the Switch
Technical Specifications
Table 3Cisco Edge 300 Series Switch Environmental and Physical Specifications
Environmental Ranges
Operating temperature23 to 104°F (–5 to 40°C)
Storage temperature–13 to 158°F (–25 to 70°C)
Relative humidityOperating and nonoperating: 10 to 90% (noncondensing)
Operating altitudeUp to 10,000 ft (3000 m)
Storage altitudeUp to 15,000 ft (4570 m)
Physical Specifications
Weight (without bracket)2.43 lb (1.1 kg)
Dimensions (H x W x D)8.27 x 11.42 x 1.22 in. (21 x 29 x 3.1 cm)
Table 4Regulatory Standards Compliance for the Cisco Edge 300 Series Switch
Specification Description
SafetyIEC 60950-1
EMCChina EMC Certifications
BluetoothBQB
WIFI802.11b/g/n Mark
WirelessSRRC
GB4943
CCC (China compulsory certification)
OL-24909-01
Cisco Edge 300 Series Switch Installation Guide
15
Obtaining Documentation and Submitting a Service Request
Obtaining Documentation and Submitting a Service Request
For information on obtaining documentation, submitting a service request, and gathering additional
information, see the monthly What’s New in Cisco Product Documentation, which also lists all new and
revised Cisco technical documentation, at:
Subscribe to the What’s New in Cisco Product Documentation as a Really Simple Syndication (RSS) feed
and set content to be delivered directly to your desktop using a reader application. The RSS feeds are a free
service and Cisco currently supports RSS Version 2.0.
For More Information
These documents provide complete information about the switch and are available from this
Cisco.com site:
• Cisco Edge 300 Series Switch Software Configuration Guide
• Release Notes for the Cisco Edge 300 Series Switch
NoteBefore installing, configuring, or upgrading the switch, refer to the release notes for the
latest information.
Cisco and the Cisco Logo are trademarks of Cisco Systems, Inc. and/or its affiliates in the U.S. and other countries. A listing of Cisco's trademarks
can be found at www.cisco.com/go/trademarks. Third party trademarks mentioned are the property of their respective owners. The use of the word
partner does not imply a partnership relationship between Cisco and any other company. (1005R)
Any Internet Protocol (IP) addresses used in this document are not intended to be actual addresses. Any examples, command display output, and
figures included in the document are shown for illustrative purposes only. Any use of actual IP addresses in illustrative content is unintentional and
coincidental.
This equipment has been tested and found to comply with the limits for a Class A
digital device, pursuant to part 15 of the FCC Rules. These limits are designed to
pro-vide reasonable protection against harmful interference when the equipment is
operated in a commercial environment. This equip-ment generates, uses, and can
radiate radio frequency energy and, if not installed and used in accordance with the
instruction manual, may cause harmful interference to radio communications.
Operation of this equipment in a residential area is likely to cause harmful
interference in which case the user will be required to correct the inter-ference at his
own expense.
FCC Radiation Exposure Statement
This equipment complies with FCC RF radiation exposure limits set forth for an
uncontrolled environment. This transmitter must not be co-located or operating in
conjunction with any other antenna or transmitter. This equipment complies with Part
15 of the FCC Rules.Operation is subject to the following two conditions:
(1) This device may not cause harmful interference, and
(2) This device must accept any interference received, including interference that may
cause undesired operation.
Caution!
The manufacturer is not responsible for any radio or TV interference caused by
unauthorized modifications to this equipment. Such modifications could void the user
authority to operate the equipment.
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.