HomePlace Backyard Cottage Assembly Manual

Backyard Cottage
Assembly Manual
Shown with optional porch & railing and cus­tomer supplied shingles
Kit ships as shown
HomePlace Structures
Phone: 717.354.3777
Hours: 9-5 Monday-Friday EST
© HomePlace Structures
Rev 7/17/06
Backyard Cottage Assembly
Manual
Thank you for purchasing this Backyard Cottage kit. The craftsmanship and detail in this playhouse are unmatched. We are proud to bring you this unit made by our Amish friends and neighbors.
This manual is designed to simplify the assembly process, however we strongly recommend having an experienced carpenter involved in the project. Please read through the entire manual before start- ing!!
It took 2 workers 4 hours to assemble this playhouse, using the tools shown in the pictures. However, it will probably take you a little longer since it will be a new project for you. While air tools were used to assemble much of the unit in this manual, the unit can also be assembled with screws or hand nails.
Take a deep breath and get at it, the satisfaction and enjoyment of this playhouse is only a few hours away. Have Fun!!!!!
Remember, it is very important that you have a level site for your playhouse, and that the play­house floor is perfectly level prior to assembling the playhouse.
Note: The playhouse depicted in this manual may show options not included in your unit.
TOOLS NEEDED:
Tape Measure
2 small paint brushes
4' straight edge
Hammer
Tin Scissors
Utility Knife with hook blade
Two Stepladders and 1 plank
Screw gun
Level
Recommended Fasteners:
Galvanized 1-1/2” Nails or Screws Galvanized 2-1/2” Nails or Screws
5/8” Roof Nails (for shingles)
1-12” Galvanized Trim Nails
Note: Air powered tools and fasteners can be used for most applications. Proper nails and staples must
be used.
© HomePlace Structures
Unpack Playhouse
Step 1: Kit should look like this when arriving at your property. Inspect package for damage. Please call 717.354.3777 to report any damages.
Step 2: Cut shrink wrap and unwrap kit.
Step 3: Cut off packaging bands and remove one section at a time by backing out screws used for packaging. Carry sections to site where unit will be built.
Note: Use caution when unpacking kit, keep sections from falling after screws are removed. Do not throw away bottom of skid, this is the large floor section.
© HomePlace Structures
page 3
Wall & Floor Assembly
Step 4: Assemble floor sections by aligning marks on floor, and mak­ing sure floor edges are precisely flush. Fasten sections together using heavy duty 3” screws spaced 12” apart.
Step 7: Set back wall panel as shown, aligning ends of wall flush with ends of floor.
Note: Make sure wall panel is plumb up and down.
Step 5:Set floor on leveled site. If needed, level site with a bed of crushed stone or gravel. It is very impor-
tant for site to be level.
Step 8: Fasten wall to floor as shown using 2-1/2” nails or screws. Fasteners should be spaced approximately 12” apart.
Step 7: Set first side wall repeating previous steps.
Note: Side walls are interchangeable, make sure to place side door panel where desired.
© HomePlace Structures
Step 8: Fasten side wall into back wall using 2-1/2” fasteners as shown.
Note: Make sure wall panel is plumb up and down.
page 4
Step 9: Push walls tightly together, nail corners and along bottom of siding around perimeter of build­ing, using, 1¾" galvanized nails as shown.
Note: Keep nails within 1-1/2” of edges of corners so nail heads are covered by corner trim
Roof Assembly
Step 10: Install gable end rafters (end rafters have only one rafter gusset) keeping rafter gusset towards inside of playhouse. Align edge of rafter flush with edge of top wall plate and fasten using 2­1/2” fasteners.
Step 11: Align inside of rafter flush with marks, keep point even with the outside edge of 2x6 top plate. Using 3" nails, toenail rafter into the top of side wall. After nailing front side, repeat on back wall.
Step 12: Caulk end gables as shown using clear silicone caulk and install end gable siding sections as shown. Note: Align siding grooves .
Step 13: Install large OSB roof section and fasten to rafters along bottom as shown.
Step 14:Fasten edge of OSB to end rafter as shown.
Step 15: Space rafters 2’ apart and fasten OSB to rafters using 2” fasteners spaced 12” apart.
Optional door kick removal: It is recommended to remove door kick from side and front doors (this should be completed after roof is set).
Step 16: Install ripped OSB section and fasten to rafters repeating previous steps.
Repeat steps 13-16 on back roof section.
Step 17: Paint playhouse and trim desired colors, with paint purchased sep­arately.
Step 18: Remove screw from door as shown.
© HomePlace Structures
page 6
Loading...
+ 11 hidden pages