Approved Installation Methods
Primary Method: Floating.
Optional Method: Full Spread Glue.
WARNING: CALIFORNIA RESIDENTS
This product can emit formaldehyde of which is known to the State of California to cause cancer.
CAUTION: ASBESTOS IN EXISTING FLOOR
Home Legend product does not contain asbestos. Existing installed resilient flooring and asphaltic adhesive may contain asbestos fillers
or crystalline silica. Do not sand, dry sweep, dry scrape, drill, saw, bead-blast, or mechanically chip or pulverize existing resilient
flooring, backing, lining felt, asphaltic “cutback” adhesive or other adhesive. See “Recommended Work Practices for Removal of
Resilient Floor Coverings” (rfci.com) for detailed information and instructions on removing all resilient covering structures.
CAUTION: BAMBOO DUST
Sawing, sanding and machining this products can produce bamboo dust. It may induce respiratory, skin and eye irritation. Avoid
prolonged exposure to wood. Power tools should be equipped with a dust collector. If possible, perform bamboo dust generating
activities outdoors. If high dust levels are encountered, use an appropriate NIOSH-designated dust mask.
Installation Instructions
Solid Bamboo Click-lock Flooring
Visit homelegend.com for latest version of installation instructions.
Owner/Installer Responsibility
The owner is advised to be at home during the installation for consultation/direction. The owner and installer should discuss installation and
layout to maximize satisfaction. If this is not possible, consultation should be done prior to installation. Installers should be familiar with
installation guidelines from National Wood Flooring Association (woodfloors.org).
The owner/installer assumes all responsibility for product quality of completed installation.
PERFORM PRE-INSTALL INSPECTION. FOR CLAIMS PURPOSES, YOU ARE ALLOWED TO OPEN UP TO 4 BOXES FOR PRODUCT INSPECTION. DO NOT OPEN
ALL THE BOXES. OPENING ALL THE BOXES CONSTITUTES YOUR ACCEPTANCE OF THE PRODUCT. INSPECT ALL THE PLANKS IN THESE 4 BOXES CAREFULLY.
EXAMINE FLOORING FOR COLOR, FINISH AND QUALITY. IF YOU DISCOVER THAT PRODUCTS ARE DEFECTIVE, OR IF MATERIAL IS QUESTIONABLE, YOU
SHOULD CONTACT THE RETAILER. IF YOU ARE SATISFIED, PROCEED WITH INSTALLATION.
Prior to installation, rack up planks from several boxes to ensure uniform distribution of colors, shades and characters in the installed flooring.
Planks having similar widths should be placed together in the same row to minimize gaps between boards.
Bamboo floors are natural products containing natural variations. Variations in color, tone, grain, streaks, nodal marks and other characters
are found from plank to plank. Similar variations exist between samples, pictures and purchased flooring. They are normal and it does not
mean the product is defective.
Flooring to be installed in one large area should be purchased at the same time. Product purchased at a later time than the first purchase
may vary beyond your expectations.
Accessories, trims and moldings are manufactured to coordinate with the varied appearances of the floor planks. Any exact matches are
coincidental. Non-matching accessories are not defective products.
This product is manufactured according to strict quality standards. In the event that defects are discovered in the field, the industry
standards permit a defect tolerance not to exceed 5%. The defects may be of any type, whether manufactured or natural. Order an
additional 5% extra for cutting wastage and grading allowances (10% for diagonal installations).
During installation, inspect the planks continuously. Defects that can be seen from a standing position should be cut off or held out.
Installing defective planks implies acceptance.
Squeaking and clicking noises are the result of interactions among flooring, joists and subfloors when they move. Limiting the movements of
the flooring system usually eliminates most of these noises. Sometimes, it is impossible to eliminate them completely and minor squeaking
or clicking noises are to be accepted as normal flooring phenomenon. Minor scratches can generally be repaired with the use of putty, stain
or filler. It is an industry standard practice of flooring installation and it should be accepted as normal by the home owner.
If You Need More Information
To assure the warranty is not inadvertently voided, before proceeding with any activity that is not covered in this manual, please contact our
Technical Support Department.
Doc. ID: 127 Rev: 2 Effective: 2/24/2014 Page | 1
Acclimation and In-service Conditions
Note: Wood moisture content measuring devices will not give an accurate reading of bamboo moisture content. Contact the meter
manufacturer on how to convert the reading from wood moisture content to bamboo moisture content.
Acclimation is the process of adjusting (conditioning) the moisture content of bamboo flooring to the environment in which it is expected to
perform. The bamboo flooring is fully acclimated when its moisture content and dimensions (width and length) are stable. For example,
the averaged dimensions and moisture content remain constant for 3 consecutive days. Bamboo flooring must acclimate for as long as
necessary to reach fully acclimated stage. Acclimation time varies depending on geographical area, interior climate control and time of the
year. Minimum acclimation time is 72 hours. In open box, open plastic wrap.
Elevate cartons from the floor by placing them on 2”X 2” lumber or equivalence. Place spacers (3/4” to 1” sticks) between each layer or
cross stack the layers for maximum exposure to ambient conditions. Acclimation temperature range is 60°F-80°F and relative humidity (RH)
of 35%-55%. Conditions in which the floor was acclimated should be maintained continuously thereafter. Document as much acclimation
information as possible below.
Date: ______________
Relative Humidity (%):______
Temperature (°F): _____
Subfloor Type:______________________
Subfloor Avg. Moisture Content (%):_______
Acclimation Period: ___________
Pre-acclimation Flooring Avg. Moisture
Content (%): _______
Pre-acclimation Flooring Width: __________
Pre-acclimation Flooring Length: _________
Post-acclimation Flooring Avg. Moisture
Content (%): _______
Post-acclimation Flooring Width: _________
Post-acclimation Flooring Length: _________
Job Site Condition
Prior to installation, the installer must ensure that at the time of installation, the job site conditions including subfloor/substrate, ambient
temperature and relative humidity, and all impacting variables will not negatively affect floor. Home Legend will decline responsibility for
damages associated with improper installation or poor site conditions.
Storage and Conditions
Do not store flooring in uncontrolled environmental conditions. For example, garages and exterior patios are not acceptable areas to store
flooring. Handle and unload bamboo flooring with care and store within the environmentally controlled site in which it is expected to
perform. Flooring stored on concrete slab should be elevated at least four inches to allow air circulation under cartons.
Existing Home
Existing home should have a consistent room temperature of 60°F-80°F and relative humidity (RH) of 35%-55%. Continual deviation from
these conditions will affect the dimensions of flooring, especially bamboo. During heating season, humidity may be much lower than the
acceptable range. During the heating season, a humidifier is recommended to prevent excess shrinkage in bamboo flooring to low humidity
levels. During the non-heating season, humidity levels can be maintained by using an air conditioner, dehumidifier, or by turning on your
heating system periodically.
New Construction or Remodel
All work involving water, such as pouring basement concrete floors, drywall and plasterwork, plumbing, etc. must be completed well in
advance of the floor delivery. Ensure that the building is enclosed. Where building codes allow, permanent heating and/or air conditioning
systems should be operating at least five days preceding installation to promote proper acclimation and should be maintained during and
after installation. If it is not possible for the permanent heating and/or air conditioning system to be operating before, during and after
installation, a temporary heating and/or dehumidification system that simulate normal living (occupied) conditions can enable the installation
to proceed until the permanent heating and/or air conditioning system is fully operational.
Your job site should have a consistent temperature of 60°F-80°F and relative humidity (RH) of 35%-55% which should be maintained
continuously thereafter.
Basements and Crawl Spaces
Concrete slab or ground must be dry. The ground in the crawl spaces must be completely covered using 6 mil black polyethylene. Crawl
space clearance between the earth and underside of joists should be no less than 18 inches and the perimeter vent area should be equal to
1.5% of the total square footage of the crawl space or as mandated by code.
Concrete Subfloor Requirements
It must have minimum rated strength of 3000 psi.
It must be level to within 1/8 inch in a 6 foot span or 3/16 inch in a 10 foot span; no bumps or low spots; high spots can be removed by
grinding; depressions can be filled with patching compound formulated for use in floor installation.
It must be clean; no construction debris, soil, mud and any other objects on or adhering to the floor; if necessary, scrape and sweep away
before the installation; no protrusions of nails, debris, metals should remain.
New concrete slab must cure for at least 60 days. It must have a minimum 10 mil polyethylene sheet between the ground and the concrete.
It must meet concrete moisture requirement below.
It must be free from moisture related conditions which can damage the installed flooring.
Light Weight Concrete
Doc. ID: 127 Rev: 2 Effective: 2/24/2014 Page | 2
It is concrete which rated strength is less than 3000 psi.
Perform a quick check by drawing a nail across the top; if it leaves indentation, it is probably light concrete.
For glue-down application, the concrete must possess shear strength greater than the glue. If concrete rated psi is unknown, contact the
adhesive manufacturer for guidance.
Concrete Moisture
All concrete subfloors should be tested for moisture content and the results documented. Visual checks are not reliable. Perform tests at
locations around exterior doorways, near walls containing plumbing, near foundation walls and in the center of the room. Minimum sample
size is 3 samples per 1000 square feet of area and one test for every additional 1000 square feet thereafter.
Its moisture content should meet one of the following criteria below:
• 4.5% when tested using Tramex Concrete Moisture Encounter
• Less than 3 pounds per 1000 square feet per 24 hours when using Calcium Chloride test (ASTM F 1869)
• 75% when using Relative Humidity Testing (ASTM F-2170).
Please note: Concrete moisture content may be acceptable the time of the test. These tests do not guarantee a perpetual “dry” concrete
slab. The concrete slab moisture content can vary at other times of the year. We are not responsible for moisture related damage to
installed flooring.
Wood Subfloor Requirements
It must be clean; no presence of construction debris, soil, mud and any other objects on or adhering to the floor; no protrusions of nails,
debris, metals should remain. If necessary, scrape and sweep the subfloor before the installation.
It must be structurally sound and stable; no movements or squeaks; no loose panels or loose nails; no signs of ply de-lamination or other
damages. Repair all shortcomings before installation.
It must be flat; no visible bumps or low spots; the subfloor should be flat to within 1/8 inch in 6 feet span or 3/16 inch in 10 feet.
Test for moisture using reliable moisture meter. Perform tests at locations around exterior doorways, near foundation walls, near walls
containing plumbing lines and in the center of the room. Measure 20 locations per 1000 square feet.
Moisture content of subfloor should be less than 12%.
Moisture content difference between subfloor and acclimated flooring should be 2% or less.
Plywood or Oriented Strand Board (OSB) Specifications
On truss/joist spacing of 16” (406mm) O/C or less, the industry standard for single-panel subflooring is minimum 5/8” (19/32”, 15.1 mm) CD
Exposure 1 plywood subfloor panels (CD Exposure 1) or 23/32” OSB Exposure 1 subfloor panels, 4’ x 8' sheets. Expansion gap between panels
should be 1/8” (3 mm). If panels are not tongued and grooved and there is not sufficient spacing or is inadequate, cut in the required spacing
with a circular saw. Do not cut in expansion space on tongue and groove panels.
Particle Board or Fiber Board
Only for floating installation.
Existing Floors
Installation over existing floor requires the installer to consider potential issues related to moisture damage, adhesive failure and fastener
failure. Contact the adhesive and fastener manufacturers respectively for their specific instructions, recommendations and requirements.
Acceptable floor coverings include: solid hardwood, linoleum, terrazzo, ceramic tile and other “moisture sealing floors.”
Unacceptable floor coverings include: carpet, needle punch felt, edge glued linoleum and other “moisture absorbing flooring.”
Radiant Heated Subfloor
This product cannot be installed on radiant heated subfloor.
Moisture Barrier and Moisture Retarder
Concrete Subfloor. For floating installation, use 6 mil polyethylene film or other means with equivalent permeability. Overlap the edge
seams and tape it together. Extend moisture barrier up to the wall about 1 inch high. When installed on above grade concrete and the
moisture content meets standards for concrete moisture, a moisture barrier is not required. For direct glue installation, use a moisture
barrier if moisture level exceeds requirement (see Concrete Moisture section).
Wood Subfloor: Use asphalt-saturated kraft paper or #15 or #30 felt that meets ASTM Standard D4869 or UU-B-790, Grade D.
Overlap along the edge seams 2”- 4” wide. This retards moisture movement from below. Extend the moisture retarder to about 1” from the
walls. Secure to the subfloor as necessary.
Sound Control Underlayment
Check with sound control manufacturer for application guidelines. Generally the less compressive underlayment is preferred.
Expansion Gap
Required gap width is 3/4”. It is required around the perimeter of the floor and between floor and all vertical obstructions. Do not place
permanently mounted structures such as kitchen counter/cabinet on the installed floor.
Transition Molding
Floating installation, transition T-molding is required in the following cases: floor spanning greater than 35 feet in length or width; wall
openings-with or without door.
Note: Floor areas interrupted by wall sections extending out of the wall; floor areas which are not rectangular may experience buckling or
gapping if there is excessive floor expansion or shrinkage.
Doc. ID: 127 Rev: 2 Effective: 2/24/2014 Page | 3