![](/html/c2/c2a3/c2a39bd2f07db739896de06277f4db4bdf747c35ac14fed66c645965d5b49d22/bg1.png)
736-8890 With Any Additional Questions
TP, GRP, and T Motor Voltage Change
This procedure will provide you with step by step instructions
to convert the operating voltage of dual voltage 3 phase.
You Need:
5 mm Allen Wrench
Wire Cutters
Wire Strippers
Terminal Crimp Tool
Qty 6-Crimpable Wire Nuts 14 to 16 Gage
2. With pump in stable, upright position,
remove the four 5mm cap screws as
indicated.
1. Remove pump from service. Disconnect
power supply. Clean and decontaminate
pump prior to working on it. See the
pump Installation, Operation, and
Maintenance Manual for detailed
instructions.
88FN2045A
3. With the cap screws removed, lift the
stator housing off of the pump.
Please Be Prepared To Provide Pump Serial Number During Call
1 of 5
![](/html/c2/c2a3/c2a39bd2f07db739896de06277f4db4bdf747c35ac14fed66c645965d5b49d22/bg2.png)
736-8890 With Any Additional Questions
4. Sometimes the housing will be difficult to
remove. Twist the housing ΒΌ turn (90
degrees), exposing the bottom of the
cable entry horn. Using a soft faced
hammer, gently tap the cable entry horn
to free the stator housing.
6. With motor disassembled, turn stator
housing upside down, and support it so it
is free standing. Stator windings and
cable leads must be visible and easy to
reach. Your unit should now look like
this. Gently remove all wires from around
the stator windings. Take care not to
damage the winding insulation. Do not
use sharp tools!!
5. With stator housing removed, locate the
upper bearing spacer and the bearing
support washer. The upper bearing
spacer may still be inside of the housing.
Clean Place those items aside until
reassembly.
88FN2045A
Please Be Prepared To Provide Pump Serial Number During Call
2 of 5