positioning of the elements has been verified.
positioning of the elements has been verified.positioning of the elements has been verified.
positioning of the elements has been verified.
1. Position the archway between the struts and fix it by inserting: 1
1. Position the archway between the struts and fix it by inserting: 11. Position the archway between the struts and fix it by inserting: 1
1. Position the archway between the struts and fix it by inserting: 1 x M8 washer (3), 1
x M8 washer (3), 1x M8 washer (3), 1
x M8 washer (3), 1 x M8x260
x M8x260 x M8x260
x M8x260
TORX screw (2),
TORX screw (2),TORX screw (2),
TORX screw (2), 1111 x 025 mm. winged PE cap (1)
x 025 mm. winged PE cap (1)x 025 mm. winged PE cap (1)
x 025 mm. winged PE cap (1) into the upper part;
into the upper part;into the upper part;
into the upper part;
1 x PE nut protection cap (4
1 x PE nut protection cap (41 x PE nut protection cap (4
1 x PE nut protection cap (4), 1 x M8 washer (3),
), 1 x M8 washer (3),), 1 x M8 washer (3),
), 1 x M8 washer (3),
1 x M8x260 TORX screw (2), 1 x PE cap (5)
1 x M8x260 TORX screw (2), 1 x PE cap (5)1 x M8x260 TORX screw (2), 1 x PE cap (5)
1 x M8x260 TORX screw (2), 1 x PE cap (5) into the lower part.
into the lower part. into the lower part.
into the lower part.
2. Repeat the operation for the opposite
2. Repeat the operation for the opposite 2. Repeat the operation for the opposite
2. Repeat the operation for the opposite
side. Fix the other archways.
side. Fix the other archways.side. Fix the other archways.
side. Fix the other archways.