Hitachi RAK-18QPA, RAK-25QPA, RAK-35QPA, RAK-50QPA Installation Manual

SPLIT UNIT AIR CONDITIONER
INSTALLATION MANUAL
Indoor Unit
+ – Screwdriver Measuring Tape Knife
Saw ø 65mm Power Drill Hexagonal Wrench
Gas Leakage Detector Pipe Cutter Putty
Vinyl Tape Pliers ● Flare Tool
Carefully read through the procedures of proper
installation before starting installation work.
The sales agent should inform customers regarding
the correct operation of installation.
Tools Needed For Installation Work
SAFETY PRECAUTION
Read the safety precautions carefully before operating the unit.
The contents of this section are vital to ensure safety. Please pay special attention to the following sign.
WARNING ........ Incorrect methods of installation may cause death or serious injury.
CAUTION ......... Improper installation may result in serious consequence.
Be sure that the unit operates in proper condition after installation. Explain to customer the proper way of
operating the unit as described in the user’s guide.
!
!
WARNING
!
CAUTION
!
Please request your sales agent or quali ed technician to install your unit. Water leakage, short circuit or  re may occur if
you do the installation work yourself.
Please observe the instructions stated in the installation manual during the process of installation. Improper installation may
cause water leakage, electric shock and  re.
Make sure that the units are mounted at locations which are able to provide full support to the weight of the units. If not,
the units may collapse and impose danger.
Observe the rules and regulations of the electrical installation and the methods described in the installation manual when
dealing with the electrical work. Use power cables approved by the authorities of your country.
Be sure to use the speci ed wire for connecting the indoor and outdoor units. Please ensure that the connections are tight
after the conductors of the wire are inserted into the terminals. Improper insertion and loose contact may cause over-heating and  re.
Please use the speci ed components for installation work. Otherwise, the units may collapse or water leakage, electric shock
and  re may occur.
Be sure to use the speci ed piping set for R-410A. Otherwise, this may result in broken copper pipes or faults.
When installing or removing an air conditioner, only speci ed refrigerant (R410A) shall be allowed, do not allow air or moisture
to remain in the refrigeration cycle. Otherwise, pressure in the refrigeration cycle may become abnormally high so that a rupture may be caused.
Be sure to ventilate fully if a refrigerant gas leak while at work. If the refrigerant gas comes into contact with  re, a poisonous
gas may occur.
After completion of installation work, check to make sure that there is no refrigeration gas leakage. If the refrigerant gas
leaks into the room, coming into contact with  re in the fan-driven heater, space heater, etc., a poisonous gas may occur.
Unauthorized modi cations to the air conditioner may be dangerous. If a breakdown occurs please call a quali ed air
conditioner technician or electrician. Improper repairs may result in water leakage, electric shock and  re, etc.
FOR SERVICE PERSONNEL ONLY
The Choice of Mounting Site (Please note the following matters and obtain permission from customer before installation).
WARNING
!
The unit should be mounted at stable, non-vibratory location which can provide full support to the unit.
CAUTION
!
No nearby heat source and no obstruction near the air outlet is allowed.
The clearance distances from top, right and left are speci ed in  gure below.
The location must be convenient for water drainage and pipe connection with the Outdoor unit.
To avoid interference from noise please place the unit and its remote controller at least 1m from the radio, television and inverter type
 uorescent lamp.
To avoid any error in signal transmission from the remote controller, please put the controller far away from high-frequency machines and
high-power wireless systems.
The installation height of indoor unit must be 2.3m.
INDOOR UNIT
Figure showing the Installation of Indoor and Outdoor Unit
Installation of Mounting Plate, Wall Penetration and Installation of Protection Pipe
1
CAUTION
!
The draining of the water container inside the indoor unit can be done from the left.
Therefore the mounting plate must be  xed horizontally or slightly tilted towards the side of drain hose. Otherwise, condensed water may over ow the water container.
Direct Mounting On The Wall
Please use hidden beams in the wall to hold the mounting plate.
Wall Penetration and Installation of Protection Pipe
Drill a ø 65mm hole on
wall which is slightly tilted towards the outdoor side. Drill the wall at a small angle.
Cut the protection pipe
according to the wall thickness.
Empty gap in the sleeve
of protection pipe should be completely sealed with putty to avoid dripping of rain water into the room.
Installation of the Indoor Unit
2
VERTICALLY DOWNWARD PIPING
Preparation
Connect connecting cord.
Pull out the pipe, connecting cord and drain hose.
Installation
The upper part of the Indoor unit is hanged on the mounting plate.
The projection at the lower part of the Indoor unit is hooked onto the mounting plate.
Please pull the lower part of the Indoor unit outwards to check if the unit is hooked onto the mounting plate. Improper installation may cause vibration and noise.
!
CAUTION
HORIZONTAL PIPING
Preparation
Change of Drain Hose and Installation Procedures.
Exchange the location of drain hose and drain cap during horizontal piping as shown in  gure below. Be sure to plug in the drain hose until the insulating material folds upon itself.
Please use pliers to pull out the drain cap.
(This is an easier way to remove the drain cap).
INSTALLATION OF REFRIGERATING PIPES AFTER CONNECTION
The refrigerating pipes should be adjusted to  t
into the hole on the wall and then ready for further connection.
The terminals of 2 connected pipes must be covered
with insulator used for terminal connection. Then the pipes are wrapped with insulation pipe.
Connect the connecting cord after removing electrical
cover. (Refer to “CONNECTION OF POWER CORD”)
After adjustment,  t the connecting cord and pipes
into the space available under the indoor unit. Use holder to hold them tight.
!
CAUTION
The rubber strap used for
 xing the insulator should not be tied with great force. Otherwise, this will damage heat insulation and causes water condensation.
Holder can be attached at the either of 2 places.
Please select the easier position.
THE CONNECTION OF REFRIGERATING PIPE DURING THE INSTALLATION OF INDOOR UNIT
Preparation To Install Refrigerating Pipes
!
CAUTION
Please  x in the plastic core
after  aring to avoid plastic chips entering the pipes.
CAUTION
!
You are free to choose the side (left or right) for the installation of drain hose. Please ensure the smooth  ow of condensed water of the Indoor unit during installation. (Carelessness may result in water leakage.)
!
CAUTION
Be sure that the drain hose is not loosely connected or bend.
Be sure that the wire is not in contact with any metal in the wall. Please use the protection pipe as wire passing through the hollow part of the wall so as to prevent the possibility of damaged by mouse. Unless it seals completely, any air with high humidity flows from outdoor and any dew may drop.
!
WARNING
The refrigerating pipes and connecting cord
transform and are attached.
The end of the refrigerating pipes are at locations
marked with “
” symbol.
Installation of Drain Hose
3
Installation
Hang the Indoor unit onto the mounting plate. Use the temporary stand at the back of the Indoor unit to push its lower part 15cm forwards.
Place the drain hose through the hole on the wall.
Wrap the refrigerating pipes with insulation pipe after connecting
refrigerating pipe.
Connect the connecting cord after removing electrical cover.
(Refer to “Connection of Power Cord”)
After adjustment, the connecting cord and refrigerating pipes
are placed into the space available under the Indoor unit.
The projection of Indoor unit must hook to the mounting plate.
INDOOR UNIT
<
IA942: A
>
!
CAUTION
Condensed water may leak out if not inserted properly.
Horizontal & Downward Piping – Making Openings
During horizontal or downward piping, use a knife to cut
openings as shown in  gure. Then smoothen the edges of openings with a  le.
Turn the piping while holding down the lower
portion of pipe-support by hand.
Heat insulation pipe
Connecting cord
Refrigerating pipe
Pull this to the front during the connection of refrigerating pipes to ease task.
Names of Indoor Components
Mounting Plate
QtyNo. Item
1
Screw for Remote Controller Holder
AAA Size Battery
Remote Controller Holder
(4.1x32)
Remote Controller
Air Purifying Filter
6
1
2
2
1
2
Screw for Mounting Plate
HOW TO REMOVE INDOOR UNIT
Push up the (PUSH) sections at the
bottom of the indoor unit and pull the bottom plate towards you. Then the claws are released from the stationary plate.
(The (PUSH) sections are indicated by
2 arrows in the right  gure)
Procedures of Installation and Precautions
Procedures to  x the mounting plate.
1. Drill holes on wall. 2. Push plug into the holes. 3. Fix the mounting plate on (As shown below) (As shown below) wall with 4.1 x 32 screw (As shown in  gure below)
Procedures to  x the holder of remote control.
1. Drill holes on wall. 2. Push plug into the holes. (As shown below) (As shown below)
A circuit breaker or fuse (16A time delay) must be installed. Without a circuit breaker or fuse the danger of electric shock
exists.
A main switch with a contact gap of more than 3mm has to be installed in the power supply line to the outdoor unit.
Do not install the unit near a location where there is  ammable gas. The outdoor unit may
catch  re if  ammable gas leaks around it.
Please ensure smooth  ow of water when installing the drain hose.
Piping shall be suitable supported with a maximum spacing of 1m between the supports.
Level
Mounting plate
Hole for pipe
Line
Weight
Mark
Screw for Mounting Plate
Please use more than 4 screws.
Plug
Screw
Remote Control Holder
20mm
ø4.4mm
ø4.8mm
Wall
Wall
32mm
Wall
Mounting plate
Screw
Plug
4.1 x 32 Screw
above 50mm
Ceiling
1
2
3
5
Indoor
Outdoor
WALL
Sleeve of protection pipe
Protection pipe
Seal with putty
Seal with putty
2 ~ 5mm
Connecting cords, pipe and drain hose must be laid together with Vinyl tape.
Mounting plate
Drain Hose
Protection Pipe
Refrigerating Pipe
Connecting Cord
Lift the body of the unit upwards and then force it downwards.
Mounting plate
Projection
[Push] mark positions
Drain cap
Please insert until here
Drain hose
Please insert until here
Drain cap
Drain hose
Openings
Pull up the pipe after bending downward
Pipe support
Drain hose
Connecting cord
Pipe
Insulation pipe (must be wrapped with vinyl tape at every 120mm).
Holder
Pipe
Rubber strap tied with great force
Please bend at a small radius to form an arc
below 5mm
Projection
Hook
about 15cm
Protection pipe
Drain hose
Connecting cord
Holder
Connected section
Bending upwards
Condensed water pond
Ditch
Condensed water pond
RAK-18QPA RAK-25QPA RAK-35QPA RAK-50QPA
Be sure to completely seal any gap with putty.
The connection of insulated drain hose.
Please use insulated drain hose for the indoor piping (commercial product).
The difference in height between the indoor and outdoor
unit should be kept max 20m.
The connecting pipe, no matter big or small, should
all be insulated with insulation pipe and then wrapped with vinyl tape. (The insulator will deteriorate if it is not wrapped with tape).
The indoor piping should be insulated with the enclosed insulation pipe. (If the insulator is insufficient, please use commercial products).
Direction of Piping
There are 6 directions allowed, namely, horizontally perpendicular to the unit, vertically down from right, horizontally out from right and horizontally out to left. Don’t form the piping downward at the left of the unit.
Horizontally perpendicular to the unit
Connection
Removal Of Air From The Pipe And Gas Leakage Inspection
FINAL STAGE OF INSTALLATION
Insulation And Maintenance Of Pipe Connection
1
The connected terminals should be completely sealed with
heat insulator and then tied up with rubber strap.
Please tie the pipe and power line together with vinyl tape
as shown in the  gure showing the installation of Indoor and Outdoor units. Then  x their position with holders.
To enchance the heat insulation and to prevent water
condensation, please cover the outdoor part of the drain hose and pipe with insulation pipe.
Completely seal any gap with putty.
Installation Of Remote Controller
2
Power Source And Operation Test
3
The remote controller can be placed in its holder which is
 xed on wall or beam.
To operate the remote controller at its holder, please ensure
that the unit can receive signal transmitted from the controller at the place where the holder is to be  xed. The unit will beep when signal is received from the remote controller. The signal transmission is weaken by the  uorescent light. Therefore, during the installation of the remote control holder, please switch on the light, even during day time, to determine the mounting location of the holder.
Power Source
CAUTION
!
Please use a new socket. Accident may occur due to the
use of old socket because of poor contact.
Please plug in and then remove the plug for 2 – 3 times.
This is to ensure that the plug is completely plugged into the socket.
Keep additional length for the power cord and do not
render the plug under external force as this may cause poor contact.
Do not  x the power cord with U-shape nail.
Operation Test
Please ensure that the air conditioner is in normal operating
condition during the operation test.
Explain to your customer the proper operation procedures
as described in the user’s manual.
<
IA942: A
>
3
Procedures of using Vacuum Pump for Air Removal
As shown in right  gure, remove the cap of valve core. Then, connect the charge hose. Remove the cap of valve head. Connect the vacuum pump adapter to the vacuum pump and connect the charge hose to the adapter.
Fully tighten the “Hi” knob of the manifold valve and completely unscrew the “Lo” knob. Run the vacuum pump for about 10~15 minutes, then completely tighten the “Lo” knob and switch off the vacuum pump.
Remove the charge hose and tighten the cap of valve core. Check the cap’s periphery if there is any gas leakage.
Completely unscrew the spindle of the service valve (at 2 places) in anti-clockwise direction to allow the  ow of refrigerant (using Hexagonal Wrench key).
Re-cap the service valve and tighten using wrench. Check the cap’s periphery if there is any gas leakage. The task is then completed.
Preparation of Pipe
1
Use a pipe cutter to cut the copper pipe.
Pipe Connection
2
INSTALLATION OF REFRIGERATING PIPES AND AIR REMOVAL
AIR REMOVAL
Checking for the electric source and the voltage range
Before installation, the power source must be checked and necessary
wiring work must be completed. To make the wiring capacity proper, use the wire gauges list below for the lead-in from a pole transformer and for the wiring from a switch board of fuse box to the main switch and outdoor unit in consideration of the locked rotor current.
THIS APPLIANCE MUST BE
EARTHED.
Procedures of Wiring
In case that power is supplied from Indoor Unit
CONNECTION OF POWER CORD
WARNING
!
Recommend to use
R410A  aring tool.
CAUTION
!
In case of removing  are nut of an Indoor unit,  rst remove a nut of small diameter side, or a seal cap of big diameter side will  y out. Prevent water from entering into the piping when working.
Wiring Of The Indoor Unit
For wire connection of the Indoor unit, you need to remove front panel and electrical cover.
Method to remove front panel
Refer to “FINAL STAGE OF INSTALLATION – How to Remove The Front Cover”.
Power supply shall be connected at the rated voltage, otherwise the unit will be broken or could not reach the speci ed capacity.
Jagged edge will cause leakage.
Point the side to be trimmed downwards during trimming
to prevent copper chips from entering the pipe.
Before  aring, please put on the  are nut.
CAUTION
!
1
2
3
4
5
Gas Leakage Inspection
Please use gas leakage detector to check if leakage occurs at the connection of Flare nut as shown on the right.
If gas leakage occurs, further tighten the connection to stop leakage. (Be sure to use R410A detector)
GRN + YEL
Strip wires
30mm
10mm
10mm
0mm
The naked part of the wire core should be 10 mm and  x it to
the terminal tightly. Then try to pull the individual wire to check if the contact is tight. Improper insertion may burn the terminal.
Be sure to use only power cables approved from the authorities
in your country. For example in Germany: Cable type: NYM 3x1.5mm
2
.
Please refer to the installation manual for wire connection to
the terminals of the units. The cabling must meet the standards of electrical installation.
There is a AC voltage of 230V between the L and N terminals.
Therefore, before servicing, be sure to remove the plug from the AC outlet or switch off the main switch.
WARNING
!
IMPORTANT
Cable length
up to
16m
up to 15m up to 25m
Wire cross-section
1.5mm
2
2.5mm
2
4.0mm
2
Indoor Unit
Outer Diameter mm (inch)
6.35 (1/4")
9.52 (3/8")
12.70 (1/2")
15.88 (5/8")
1.0~1.5
1.0~1.5
1.0~1.5
1.0~1.5
Clutch type
A (mm)
1.5~2.0
1.5~2.0
1.5~2.5
1.5~2.5
Wing nut type
Thickness
(mm)
0.8
0.8
0.8
1.0
0.0
~ 0.5
0.0
~ 0.5
0.0
~ 0.5
0.0
~ 0.5
Flare tool for R410A
Clutch type
Conventional  are tool
Trimming tool
Copper pipe
Die
Die
Copper pipe
Outer
dia.of pipe
6.35 (1/4")
9.52 (3/8")
12.70 (1/2")
15.88 (5/8")
6.35 (1/4")
9.52 (3/8")
12.7 (1/2")
Valve
head cap
Torque N·m
(kgf
·
cm)
14.0 – 18.0 (140 – 180)
33.0 – 42.0 (330 – 420)
50.0 – 62.0 (500 – 620)
63.0 – 77.0 (630 – 770)
19.6 – 24.5 (200 ~ 250)
19.6 – 24.5 (200 ~ 250)
29.4 – 34.3 (300 – 350)
12.3 – 15.7 (125 ~ 160)
Small dia. side
Large dia. side
Valve core cap
Small dia. side
Large dia. side
When the meter reaches - 101KPa (-76cmHg) during pumping, fully tighten the shuttle.
Closed R410A
Valve
Charge hose
Vacuum pump adapter
When pumping starts, slightly loosen the  are nut to check of air sucked in. Then tighten the  are nut.
Lo Hi
Vacuum pump
Manifold valve
Meter showing pressure
Valve
Cap of valve head
Cap of valve head
The body of service valve
Hexagonal Wrench Key
Cap of valve core
[For all optional part, please refer catalog for part number]
As for connecting to H-Link, a separately purchased RAC Adapter is required.
To install the wiring the electrical box cover must be opened.
Connect the connector of RAC adapter to CN7.
Assemble back the cover of electrical box.
Please refer to the respective user manual of RAC Adapter
for further details.
Please be careful not to damage lead wires by edge of
plate when connecting the optional parts.
[For all optional part, please refer catalog for part number]
Connection to the electrical box:
Remove the cover of electrical box.
Connect the connector of wired remote controller to CN9.
Assemble back the cover of electrical box.
Please refer to the respective user manual of wired remote
controller for further details.
Please be careful not to damage lead wires by edge of
plate when connecting the optional parts.
WIRED REMOTE CONTROLLER
H-LINK
How To Connect The Optional Parts
(RAC Adapter, Wired Remote Control)
CN7
RAC Adapter cord
CN9
Wired remote controller cord
Wired remote controller
RAC Adapter
Connect the earth cord
After remove the screw and cover, and put the connecting cords and  x the cover with screw.
The remote controller must be slide in the remote controller holder, in the direction as shown in the  gure, until it hooks at the lower end of the remote controller holder.
Screw (2 pieces)
Remote Controller Holder
Remote Controller
How to remove the Front Cover
1 Remove the front panel.
Pull up the front panel
by holding it at both lower sides with both hands.
When the front panel full
open, pull the inner part of the right arm outward and pull the panel forward while closing it gradually.
2 Remove the pre- lters.
Push upward to release the claws and pull out the Pre-
 lter.
3 After removing two caps and two screws, rotate the
horizontal louver towards you a bit. Then, pull the center of the front cover to release the claws.
4 Pull the side faces (lower sections) of the front cover
towards you as shown in the  gure and remove the cover.
How to attach the Front Cover
1 Check to ensure that the drain pan is securely attached.
2 To install the front cover onto the unit, push two points
from the center to lock the two claws in the direction as shown in the image below. Then, hook the four claws at upper side of the front cover securely.
3 Tighten the two screws, then attach the two caps.
4 Install the pre- lters.
5 Slide the shafts on the left then on the right arms of the
front panel along the step on the front cover. Please insert the shafts into the holes untill they stop. After checking the shafts are securely inserted, close the front panel.
Claw
View A
View A
Hole
Shaft
Front panel
Pre- lter
Horizontal louver
Cap
Screw
Claw
After insertion
Before insertion
Claws
Screw
Cap
Front cover
Method to remove the low cover
Pull the cover at
1
and 2 in the directions as
shown by arrows to remove the cover.
SWITCH SETTING TO SELECT 1.8kW OR 1.2kW CAPACITY
!
CAUTION
Before setting the switch, make sure to turn OFF power supply and then set the position of the switch otherwise will cause damage to the Main PCB.
1.2kW
1.8kW
SWITCH POSITION
CAPACITY SELECTION
NOTE: FACTORY default setting is at 1.8kW capacity.
This setting is applicable for RAK-18QPA only.
Loading...