HIO HIOO1127 Installation & Assembly

10'x12' Dome Soft Top Gazebo with Netting
WARNING:
Fabric meets CPAI-84 specification for flame resistance. It is Not Fire Proof. The fabric will burn if left in continuous contact with any flame source. The application of any harsh chemicals to the fabric may render the flame-resistant properties ineffective.
Always read and follow the instructions before use. When assembling and using this product, basic safety precautions must always be fol­lowed to reduce risk of personal injury and damage to the product or surroundings.
Be sure to keep all children and pets away from assembly area. Some parts contain sharp edges. Wear protective gloves when handling these items. It is recommended that, for safety issues, at least 2 people as semble the gazebo. It may take to 90 minutes to assemble this gazebo.
It is important to schedule enough time to complete the assembly. You should not leave the unit unattended if it is not fully assembled, even if it is already anchored to the ground. You should begin the assembly no less than 6 feet from any permanent structures such as fences,a garage, a house, overhanging branches, electrical wires or laundry lines. You must assemble your unit on level ground or a platform.
The unit must be anchored to the ground with proper anchors. Failure to do so may risk it blowing away.
Check that all screws are tight before and during usage. Do not place any type of heat conductor or source under, or within 5 feet of the unit including, but not limited to, a barbeque or space heater.
The gazebo is designed to provide shade only. Do not use this gazebo in strong wind and rain. Wind and rain can damage the gazebo and could result in injury to you and others. It is recommended that the Canopy
and Sidewall be removed during strong winds and stormy conditions.
Check all available parts. Before assembling the gazebo, check to make sure you have all the parts listed in the Parts List.
PARTS LIST
A
B1
B2
C1
C2
D
E
F
G
H1
H2
H3
H4
Description
Post
Long Cross Beam
Long Cross Beam
Short Cross Beam
Short Cross Beam
Top Connector
U Shape Bracket
Top Connector
Post Base
Roof Tube
Roof Tube
Roof Tube
Roof Tube
Sketch QTY
4 pcs
2 pcs
2 pcs
2 pcs
2 pcs
1 pc
4 pcs
1 pc
4 pcs
4 pcs
4 pcs
2 pcs
2 pcs
J
K
M
N
AA
BB
CC
DD
EE
FF
Small Roof Cover
Big Roof Cover
Mosquito Netting
Finial
Bolt
Bolt
Bolt
Bolt
Anchor
Wrench
M6 x 15mm
M6 x 35mm
M6 x 55mm
M6 x 68mm
1 pc
1 pc
4 pcs
1 pc
20 pcs
4 pcs
4 pcs
4 pcs
8 pcs
2 pcs
STEP 1
Fig.1
C1
Fig.3
B1
C2
Fig.2
Fig.2
B2
Fig.3
A
C1
B2
Fig.2
B1
Fig.2
C2
A
A
A
Fig.1
Fig.3
Fig.2
CC
B1/C1
B2/C2
DD
A
E
A
AA
G
Fig.1: Using bolt (DD) to connect Post1(A) and Leg Base1(G). Repeat these steps for all Post (A). Fig.2: Insert Long Cross Beam (B1) to Long Cross Beam (B2), and fix it with Bolt (CC). Insert ShortCross Beam (C1) to Short Cross Beam (C2), and fix it with Bolt (CC). Repeat the above steps for B1 &B2, C1&C2. Fig.3: Using U Shape Bracket (E) to fix the top of the Post (A). Fix the each Cross Beam to each Post with 4pcs Bolt (AA) .Repeat the above step for all Post (A).
STEP 2
Fig.6
H3
H1
Fig.4 & Fig.5
H1
H2
H4
H1
H3
H2
Fig.6
H2
Fig.4
F
H3
H1
H1
H4
D
Fig.4: Insert Top Connector (F) to Top Connector (D), insert Roof Tube (H1) to Top Connector (D) long tube.Repeat the above steps for all H1.
Fig.5: Insert Roof Tube (H3) to Top Connector (D), Insert Roof Tube (H4) to Top Connector (D). Repeat the above steps for all Roof Tube(H3& H4).Pay attention to the angle for Roof Tube (H3 & H1)is small ,angle for Roof Tube(H4 & H1) is big.
Fig.6: Insert Roof Tube (H2) to Roof Tube (H1), Repeat the above steps for all H1 &H2.
Fig.5
H4
D
H3
Fig.6
H2
H1
STEP 3
H4
Fig.7
BB
H3
Fig.7
H2
Fig.7
H3
H2
C2
Fig.8
Fig.9
B2
AA
H4
B2
Fig.8
H4
Fig.9
H3
AA
E
C2
H2
Fig.7: Insert Roof Tube (H2) to U Shape Bracket (E), and fix it with Bolt (BB). Repeat the above steps for all H2.
Fig.8: Using bolt (AA) to connect Roof Tube (H3) and Short Cross Beam (C2), Repeat the above steps for C2. Fig.9: Using bolt (AA) to connect Roof Tube (H4) and Long Cross Beam( B2), Repeat the above steps for B2.
STEP 4
Fig.10
J
Fig.11
K
Fig.11
N
J
Fig.10
K
H2
Fig.10: Attach Small Roof Cover (J), insert Finial (N). Fig.11: Attach Big Roof Cover (K), insert Roof Tube (H2) to corner of the Big Roof Cover (K). Repeat the above steps for each corner.
STEP 5
Fig.12
M
Fig.13
Fig. 12
Velcro
M
Fig.13
G
EE
Fig.12: Attach the Mosquito Netting (M) Velcro to Cross beam (B1/B2/C1/C2). Fig.13: Insert 2pcs Anchor (EE) to each Post Base (G).
Any questions on assembly or parts, please contact: customerservice@e2e-corp.com
Made in china
Loading...