Hills Heritage Hoist 6-Line, Heritage Hoist 7-Line Product Manual

TM
Heritage
Rotary Hoist
Product Manual
Heritage Hoist 6-Line Heritage Hoist 7-Line
2
Congratulations
Congratulations on the purchase of your Hills Heritage Hoist, which will bring you many years
It is important that you read this Product Manual thoroughly before installation and use. In this way you will benefit from all the design features and enjoy safe use of the product.
Thank you for choosing Hills.
Warning
• Do not allow children or pets to swing on the Hoist or items of laundry.
• Do not use for any purpose other than to hang and dry washing.
• Do not use your Hoist if parts are worn or damaged.
• Patents and registered designs apply to this product.
433 181
447 201
203
Hoist Pack contents
ID Part name Qty.
796 Main Standard 1
795 Secondary Standard 1
793 Arm 4
794 Tube stay 4
789 Rod stay 4
788 Galvanised clothesline wire coil 1
Accessory pack 1
Accessory Pack contents
ID Part name Qty.
791 Top cap – upper 1
792 Top cap – lower 1
787 Arm stay bracket 4
752 Arm end cap 4
181 Screw RHMT M5 x 35mm 4
201 Screw RHMT M6 x 16mm 4
203 Screw RHMT M6 x 45mm 4
204 Screw RHMT M6 x 60mm 1
434 Nyloc nut M5 4
447 Nyloc nut M6 4
409 Square nut M6 5
409 204
Please retain this Product Manual. Record the following information for future reference.
Product Number (printed on label): FD
Date of purchase:
Name and location of store:
Made in China
Select a Suitable Location
Minimum recommended clearance on all sides of the Hoist is 1m (3'-3") (Fig. 1).
Install the Main Standard
1. Dig a 200mm (8") by 800mm (32") hole ( Fig. 2).
2. Dig the hole deeper than 800mm
if you would like the clothesline to sit lower in the ground.
3. Fill with 150mm coarse gravel
4. Insert main standard 796 into the hole.
5.
Concrete into position.
Concrete should be damp enough to hold together when squeezed in your hand.
Settle the concrete by pushing a thin stick into the mix several times.
Ensure the main standard is vertical.
5. Wait 48 hours for concrete to set.
Fig. 2
Wind brake
Check the Hoist is vertical
Main Standard
796
Installation
3
1.6m
Fig. 1
1m (3'-3")
Heritage 6-Line
4.0m (13'3")
Heritage 7-Line
4.5m (14'9")
1m (3'-3")
Ground level
Indents
200mm (8")
800mm (32")
650mm (26") concrete150mm
(6") gravel
4
Assembly
Secondary Standard Assembly
IMPORTANT:
1. Remove the wind brake and plastic ring
ring from the top of the Main Standard assembly by loosening the securing screw.
2. Insert secondary standard 795 into top of
main standard.
3. Rotate secondary standard 795 until worm
hook slides through the slot in stabiliser plug (Fig 3).
4. Drop the wind brake and plastic ring on the
top of the secondary standard. Slide them back down to their original position and screw into place.
Fig. 3
Arm and Stay Assembly
1. Fit top cap lower assembly 792 to secondary
standard assembly 795 and fasten securely with screw 204 and nut 409 (Fig. 5).
2. Locate arm stay bracket 787 onto the arm 793 and align the mount holes.
Ensure the bracket is assembled as per Fig 6 (with staples up).
3. Squeeze the arm stay bracket 787 together and fasten securely with screws 181 and nuts
434 (Fig. 6).
4. Fit tube stays 794 to arm stay brackets 787
and fasten securely with screws 201 and nuts 447 (Fig. 6).
5. Place the arms into the cross and assemble the tube stay into the top cap assembly 791 and 792 with the screw 203.
Note: Do not fit the nut yet.
6. Repeat step 5 for the other three arms.
For Model 4 fit nuts 409 to screws 203 now. For Model 5 refer to step 7.
7. For Model 5, hook the inner rod stays 789 into the innermost staples on the arms. Position other end underneath the top cap lower assembly Fit nuts 409 and tighten.
8. Fit end caps 752 to the end of each arm.
792 and onto screw 203.
Note: Main Standard tube shown in dotted line for illustration purposes.
Loading...
+ 8 hidden pages