Installation
Refer to the following pages for important information regarding the
installation of MCS/G and BCS Combis. It is recommended that
installation be accomplished by a certified and properly trained technician.
Site, leveling
Minimum clearance sides and back:
2 in. (50 mm)
Service clearance, left side:
20 in. (500 mm)
Clearance for door opening:
1
Model 6 & 10:20
Model 1020:29
Model 20:28
Model 40:30
⁄2 in. (521 mm)
1
⁄2 in. (749 mm)
3
⁄4 in. (730 mm)
3
⁄4 in. (781 mm)
fig. 1
fig. 2
1) Check for any transport damages. Should there be any signs of transport
damage immediately inform your dealer/freight forwarder.
Model 6 & 10:351⁄2 in. (902 mm)
Model 1020:495⁄8 in. (1262 mm)
Model 20:397⁄8 in. (1012 mm)
Model 40:521⁄2 in. (1332 mm)
■ Floor at installation site must be level.
■ Cold water line should be in place. (page 40)
■ 2 in. (50 mm) drain connection installed.
■ Max. drain height for floor units: 4 in. (100mm)
■ Electrical power supply/protective measures installed and sized correctly.
(page 38-39)
3) Remove all cartons, packing materials, documents etc. from the interior cabinet.
4) Remove grid shelves/mobile rack from cabinet.
5) Take unit off the pallet.
■ Moving unit without pallet: Models 6, 10, 1020 (fig. 1)
37
■ Moving unit without pallet: Models 20, 40 (fig. 2)
INSTALLATION
continued
Unit weights:
MCS/BCS 6270 lbs. (123 kg)MCG 6335 lbs. (152 kg)
MCS/BCS 10334 lbs. (152kg)MCG 10384 lbs. (174 kg)
MCS/BCS 1020484 lbs. (220 kg)MCG 1020584 lbs. (265 kg)
MCS/BCS 20686 lbs. (312 kg)MCG 20798 lbs. (362 kg
MCS/BCS 40972 lbs. (442 kg)MCG 40888 lbs. (403 kg)
Fig. 3
Fig. 4
Fig. 5
6) Installation models 6, 10, 1020
■ Place floor stand at the installation place and level by adjusting legs (fig. 3).
■ Minimum clearance required to neighboring equipment or walls (page 36)
■ Place the unit on top of the stand. The unit’s legs must be centered on
the locating pins of the stand (fig. 4).
■ Unit must be level (fig. 5).
7) Installation models 20, 40
■ The unit must be secured against shifting on the floor by means of floor
fixtures (fig. 6). If floor fixtures are glued to the floor (use polyurethane
glue or similar), remove all grease from the floor first.
■ Place the unit at its final location and level by adjusting legs (fig. 5).
■ Minimum clearance required to neighboring equipment or walls (page 36)
■ The area of floor under the unit where Mobile Oven Racks will roll in
must be level or door will not seal (fig. 7).
Electrical
8) Electrical connection
Fig. 6
Fig. 7
■ Connect the unit only according to the information given on the data plate.
■ Observe all regulations of your local Electrical Code.
■ The appliance may only be connected by a licensed electrician.
■ Each appliance requires an independent fused power supply line.
■ Connection via GFI circuit breaker is advisable.
■ On-site installation: provide accessible all-pole disconnection device with
minimum of
1
⁄8 in. (3 mm) contact gap (not required for 120v gas units.)
■ Connect appliance to ground.
■ Special voltages on request. Circuit diagram is located behind the operator
panel.
Connected load for electric units:
ModelKW
208v 3Phase240v 3 Phase208v 1 Phase240v 1 Phase
MCS/BCS-61028244842
MCS/BCS-10195345.8
MCS/BCS-102031.587.575.9
MCS/BCS-2038105.691.5
MCS/BCS-4063175.1151.8
Amps
38
INSTALLATION
12
11
10
9
8
7
6
5
4
3
2
1
fig. 8
N
L
L
L
3
2
1
Electrical requirements of gas units:
ModelVoltagePhaseCycle/HzKW
MCG-61201601
MCG-101201601
MCG-1020208/2401601.5
MCG-20208/2401601.6
MCG-40208/2401603.5
Choose conductor size according above tables and your local regulations.
IMPORTANT
fig. 9
Cable
Inlet
Gas units are voltage specific. Supply voltage must match voltage rated on data plate.
■ Gas units are supplied with grounded power cord and plug.
■ Electric units are NOT supplied with power cord.
To connect power supply for electric units, models 6, 10:
■ Open the operator panel. (fig. 8)
(Electric)(Gas)
■ Insert power cord through cable inlet under left side of unit to desired
length and secure the cable connection tight. (fig. 9)
■ The circuit diagram is located behind the control panel.
To connect power supply for electric units, models 1020, 20, 40:
■ Access power connection terminals by removing left side panel.
■ Insert power supply cable through cable inlet under left side of unit to desired
length and secure the cable connection tight. (fig. 9)
■ Connect supply wires as follows:
Gray terminals:L1, L2, L3, phase sequence
does not need to be observed
Blue terminal:Neutral (if applicable)
Yellow/Green terminal:Ground
240 Volt
208 Volt
Common
39
IMPORTANT/MCS Only
Henny Penny Combi Ovens are shipped set up for 240 volts, but can be changed
to operate on 208 volt by proceeding with the following steps:
1. Disconnect unit from power supply source.
2. Open service door (fig. 8) by loosening fastener at top of the unit over the
control panel using a 5 mm Allen wrench. A rubber grommet must first be
removed to access the bolt.
3. Remove jumper between pins 8 and 9 of connector shown at left. The jumper is
removed for 208 volt supply, it stays in place between pins 8 and 9 for 240 volt.
4. Move transformer primary lead from the 240 volt terminal to the 208 volt
terminal.
5. Secure all panels and covers.
NOTE: BCS electric units are voltage specific. Only MCS electric units
are convertible.