3Installation instructions
1Introduction......................................................................... 5
1.1About this manual ............................................................................ 5
1.1.1Explanation of signs .................................................................................. 6
1.2Staff qualification ............................................................................. 7
1.3Use of the unit................................................................................... 7
1.4Warranty............................................................................................ 7
2Safety information.............................................................. 8
3Description of the unit ..................................................... 10
3.1Overview of the unit ....................................................................... 10
3.2Equipment and connection data................................................... 10
4Transporting the unit ....................................................... 15
4.1Transporting the unit to the installation site ............................... 15
4.2Unpacking the unit ......................................................................... 15
5Setting up the unit............................................................ 17
5.1Minimum clearances ...................................................................... 17
5.2Lifting the unit off the pallet .......................................................... 18
5.3Placing the unit on the equipment legs........................................ 19
5.4Aligning the unit ............................................................................. 19
6Connecting the unit.......................................................... 20
6.1Opening and closing the housing................................................. 20
6.1.1Removing and attaching side wall........................................................... 20
6.2Making the power connection....................................................... 21
6.2.1Matching the unit to the connection voltage ............................................ 23
6.2.2Connecting the power connection cable ................................................. 25
6.2.3Connecting the power optimisation system............................................. 26
6.2.4Connecting to the potential equalisation circuit ....................................... 27
6.3Connecting the kitchen management system ............................. 27
6.4Making the basic control setting................................................... 29
6.4.1Changing the basic control setting .......................................................... 29
6.5Making the water connection ........................................................ 30
6.5.1Connecting the tap water connection line ............................................... 30
6.5.2Connecting softened tap water to both connections ............................... 31
6.6Making the wastewater connection .............................................. 32
6.6.1Connecting the wastewater line to a permanent connection................... 32
6.7Making the exhaust air connection .............................................. 33
6.7.1Connecting the exhaust air line ............................................................... 34
7Checking operation.......................................................... 35
7.1Checking the controls.................................................................... 35
7.2Checking the monitoring of the cooking zone door ................... 35