Heat & Glo LifeStyle Soho24B 2137-900 User Manual

Model: Soho24B
Owner’s Manual
Installation and Operation
NOTICE
DO NOT DISCARD THIS MANUAL
• Important operating and maintenance instructions included.
WARNING: If the information in these instructions is not followed exactly, a fi re or explosion may result causing property damage, personal injury, or death.
DO NOT store or use gasoline or other fl am- mable vapors and liquids in the vicinity of this or any other appliance.
• What to do if you smell gas
- DO NOT try to light any appliance.
- DO NOT touch any electrical switch. DO
NOT use any phone in your building.
- Immediately call your gas supplier from a
neighbor’s phone. Follow the gas suppli­er’s instructions.
- If you cannot reach your gas supplier, call
the fi re department.
• Installation and service must be performed by a qualifi ed installer, service agency , or the gas supplier.
This appliance may be installed as an OEM installation in manufactured home (USA only) or mobile home and must be installed in accordance with the manufacturer’s instructions and the manufactured home construction and safety standard,
Title 24 CFR, Part 3280 or Standard for Installation in Mobile Homes, CAN/CSA Z240MH, in Canada.
This appliance is only for use with the type(s) of gas indicated on the rating plate.
• Read, understand and follow these instructions for safe installation and operation.
DO NOT
DISCARD
• Leave this manual with party responsible for use and operation.
WARNING
HOT SURFACES!
Glass and other surfaces are hot during operation AND cool down.
Hot glass will cause burns.
DO NOT touch glass until it is cooled
• NEVER allow children to touch glass
• Keep children away
• CAREFULLY SUPERVISE children in same room as replace.
• Alert children and adults to hazards of high temperatures.
High temperatures may ignite clothing or other fl ammable materials.
• Keep clothing, furniture, draperies and other fl ammable materials away.
This appliance has been supplied with an integral barrier to prevent direct contact with the fi xed glass panel. DO NOT operate the appliance with the barrier removed.
Contact your dealer or Hearth & Home Technologies if the barrier is not present or help is needed to properly install one.
In the Commonwealth of Massachusetts installation must be performed by a licensed plumber or gas fi tter.
See Table of Contents for location of additional Commonwealth of Massachusetts requirements.
Installation and service of this appliance should be performed by qualifi ed personnel. Hearth & Home Technologies suggests NFI certifi ed or factory trained professionals, or technicians supervised by an NFI certifi ed professional.
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12
1
Read this manual before installing or operating this appliance.
Please retain this owner’s manual for future reference.
Congratulations
Congratulations on selecting a Heat & Glo gas appliance —an elegant and clean alternative to wood burning appliances. The Heat & Glo gas appliance you have selected is designed to provide the utmost in safety, reliability, and effi ciency.
As the owner of a new appliance, you’ll want to read and carefully follow all of the instructions contained in this Owner’s Manual. Pay special attention to all Cautions and Warnings.
Homeowner Reference Information
This Owner’s Manual should be retained for future reference. We suggest that you keep it with your other important documents and product manuals.
The information contained in this Owner’s Manual, unless noted otherwise, applies to all models and gas control systems.
Your new Heat & Glo gas appliance will give you years of durable use and trouble-free enjoyment. Welcome to the Heat & Glo family of appliance products!
We recommend that you record the following
pertinent information about your appliance.
Model Name: ___________________________________________ Date purchased/installed: __________________ Serial Number: __________________________________________ Location on appliance: ____________________ Dealership purchased from: _______________________________ Dealer Phone: __________________________ Notes: _______________________________________________________________________________________ _____________________________________________________________________________________________
Listing Label Information/Location
Type of Gas
Gas and Electric Information
Not Not for for use use with with solid solid fuel.fuel. ((Ne Ne doit doit pas pas entre entre utilise utilise avec avec un un combustible combustible solide).solide).
Type Type of of Gas Gas (Sorte (Sorte De De Gaz)Gaz)::
NNAATURALTURAL GASGAS
Minimum Minimum Permissible Permissible Gas Gas Supply Supply for for Purposes Purposes of of Input Input Adjustment.Adjustment. Approved Approved Minimum Minimum (De (De Gaz) Gaz) AcceptableAcceptable 0.00.0 in in w.c.w.c. (Po. (Po. Col. Col. d’eau)d’eau) Maximum Maximum Pressure Pressure (Pression)(Pression) 0.00.0 in in w.c.w.c. (Po. (Po. Col. Col. d’eau)d’eau) Maximum Maximum Manifold Manifold Pressure Pressure (Pression)(Pression) 0.00.0 in in w.c.w.c. (Po. (Po. Col. Col. d’eau)d’eau) Minimum Minimum Manifold Manifold Pressure Pressure (Pression)(Pression) 0.00.0 in in w.c.w.c. (Po. (Po. Col. Col. d’eau)d’eau) Total Total Electrical Electrical Requirements: Requirements: 000Vac, 000Vac, 00Hz., 00Hz., less less than than 00 00 AmperesAmperes
ALTITUDE:ALTITUDE: 0-0000 0-0000 FT.FT. 0000-0000FT.0000-0000FT. MAX. MAX. INPUT INPUT BTUH:BTUH: 00,00000,000 00,00000,000 MIN. MIN. INPUT INPUT BTUH:BTUH: 00,00000,000 00,00000,000 ORIFICE ORIFICE SIZE:SIZE: #XXXXX#XXXXX #XXXXX#XXXXX
The model information regarding your specifi c appliance can be found on the rating plate usually located in the control area of the appliance.
Heat & Glo, a brand of Hearth & Home Technologies, Inc. 7571 215th Street West, Lakeville, MN 55044
This This appliance appliance must must be be installed installed in in accordance accordance with with local local codes, codes, if if any; any; i f if not, not, follow follow ANSI ANSI Z223.1Z223.1 in in the the USA USA or or CAN/CGA CAN/CGA B149 B149 installation installation codes. codes. (Installer (Installer l’appareil l’appareil selon selon les les codes codes ou ou reglementsreglements
locaux locaux ou, ou, en en l’absence l’absence de de tels tels reglements, reglements, selon selon les les codes codes d’installation d’installation CAN/CGA-B149.)CAN/CGA-B149.)
ANSI ANSI Z21XX-XXXX Z21XX-XXXX · · CSA CSA 2.XX-MXX 2.XX-MXX · · UL307BUL307B
IN IN CANADACANADA
Model:Model:
(Modele):(Modele):
SerialSerial
(Serie):(Serie):
XXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXX
MADE MADE IN IN USAUSA
Model Number
Serial Number
2
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12
Table of Contents
1 Listing and Code Approvals
A. Appliance Certifi cation . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
B. Glass Specifi cations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
C. BTU Specifi cations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
D. High Altitude Installations . . . . . . . . . . . . . . . . . . . . . . . . . . 4
E. Non-Combustible Materials Specifi cation. . . . . . . . . . . . . . 4
F. Combustible Materials Specifi cation . . . . . . . . . . . . . . . . . 4
G. Electrical Codes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
H. Requirements for the Commonwealth of Massachusetts . . 5
2 Getting Started
A. Design and Installation Considerations . . . . . . . . . . . . . . . 6
B. Tools and Supplies Needed . . . . . . . . . . . . . . . . . . . . . . . . 6
C. Inspect Appliance and Components . . . . . . . . . . . . . . . . . . 6
3 Framing and Clearances
A. Selecting Appliance Location . . . . . . . . . . . . . . . . . . . . . . . 7
B. Mantel Projections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
C. Constructing the Appliance Chase . . . . . . . . . . . . . . . . . . . 8
D. Clearances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
4 Termination Locations
A. Vent Termination Minimum Clearances . . . . . . . . . . . . . . . 9
5 Vent Information and Diagrams
A. Vent Table Key . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11
B. Use of Elbows . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11
C. Measuring Standards . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11
D. Vent Diagrams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
6 Vent Clearances and Framing
A. Pipe Clearances to Combustibles . . . . . . . . . . . . . . . . . . 16
B. Wall Penetration Framing . . . . . . . . . . . . . . . . . . . . . . . . . 16
C. Vertical Penetration Framing . . . . . . . . . . . . . . . . . . . . . . 17
D. Install Attic Insulation Shield . . . . . . . . . . . . . . . . . . . . . . . 18
7 Appliance Preparation
A. Top Vent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
B. Installation of Non-combustible Facing Material . . . . . . . 20
C. Securing and Leveling the Appliance . . . . . . . . . . . . . . . . 21
8 Installing Vent Pipe
A. Assemble Vent Sections. . . . . . . . . . . . . . . . . . . . . . . . . . 22
B. Assemble Slip Sections . . . . . . . . . . . . . . . . . . . . . . . . . . 23
C. Secure the Vent Sections . . . . . . . . . . . . . . . . . . . . . . . . . 23
D. Disassemble Vent Sections . . . . . . . . . . . . . . . . . . . . . . . 24
E. Install Decorative Ceiling Components . . . . . . . . . . . . . . 24
F. Install Metal Roof Flashing . . . . . . . . . . . . . . . . . . . . . . . . 25
G. Assemble and Install Storm Collar . . . . . . . . . . . . . . . . . . 25
H. Install Vertical Termination Cap . . . . . . . . . . . . . . . . . . . . 26
I. Install Decorative Wall Components . . . . . . . . . . . . . . . . 26
J. Heat Shield Requirements for Horizontal Termination . . . 26
K. Install Horizontal Termination Cap . . . . . . . . . . . . . . . . . . 27
9 Gas Information
A. Fuel Conversions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
B. Gas Pressures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
C. Gas Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
10 Electrical Information
A. Recommendation for Wire . . . . . . . . . . . . . . . . . . . . . . . . 30
B. Connecting to the Appliance. . . . . . . . . . . . . . . . . . . . . . . 30
C. IntelliFire Ignition System Wiring . . . . . . . . . . . . . . . . . . . 30
D. Junction Box Installation. . . . . . . . . . . . . . . . . . . . . . . . . . 31
11 Finishing
A. Facing Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
B. Mantel Projections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
C. Installation of Non-Combustible Facing Materials . . . . . . 33
12 Appliance Setup
A. Remove Shipping Materials . . . . . . . . . . . . . . . . . . . . . . . 34
B. Clean the Appliance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
C. Accessories . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
D. Positioning Stones . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
E. Glass Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
F. Air Shutter Setting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
G. Refl ective Panel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
13 Operating Instructions
A. Before Lighting Appliance. . . . . . . . . . . . . . . . . . . . . . . . . 38
B. Lighting Instructions (IPI) . . . . . . . . . . . . . . . . . . . . . . . . . 39
C. After Appliance is Lit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40
D. Frequently Asked Questions . . . . . . . . . . . . . . . . . . . . . . 40
14 Troubleshooting
A. IntelliFire Ignition System . . . . . . . . . . . . . . . . . . . . . . . . . 41
15 Maintaining and Servicing Appliance
A. Maintenance Tasks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
16 Reference Materials
A. Appliance Dimension Diagram . . . . . . . . . . . . . . . . . . . . . 45
B. Vent Components Diagrams . . . . . . . . . . . . . . . . . . . . . . 46
C. Service Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50
D. Limited Lifetime Warranty . . . . . . . . . . . . . . . . . . . . . . . . . 53
E. Contact Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55
 
= Contains updated information.
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12
3
1
1
Listing and Code Approvals
A. Appliance Certifi cation
MODELS: Soho24B LABORATORY: Underwriters Laboratories, Inc. (UL) TYPE: Direct Vent Gas Appliance Heater STANDARD: ANSI Z21.88a-2007 • CSA2.33a-2007
This product is listed to ANSI standards for “Vented Gas Appliance Heaters” and applicable sections of “Gas Burning Heating Appliances for Manufactured Homes and Recreational Vehicles”, and “Gas Fired Appliances for Use at High Altitudes”.
NOT INTENDED FOR USE AS A PRIMAR Y HEAT SOURCE.
This appliance is tested and approved as either supplemen­tal room heat or as a decorative appliance. It should not be factored as primary heat in residential heating calculations.
B. Glass Specifi cations
Hearth & Home Technologies appliances manufactured with tempered glass may be installed in hazardous locations such as bathtub enclosures as defi ned by the Consumer Product Safety Commission (CPSC). The tempered glass has been tested and certifi ed to the requirements of ANSI Z97.1 and
CPSC 16 CFR 1202 (Safety Glazing Certi cation Council SGCC# 1595 and 1597. Architectural Testing, Inc. Reports 02-31919.01 and 02-31917.01).
This statement is in compliance with CPSC 16 CFR Section
1201.5 “Certi cation and labeling requirements” which refers
to 15 U.S. Code (USC) 2063 stating “…Such certifi cate shall accompany the product or shall otherwise be furnished to any distributor or retailer to whom the product is delivered.”
Some local building codes require the use of tempered glass with permanent marking in such locations. Glass meeting this requirement is available from the factory . Please contact your dealer or distributor to order.
Note: This installation must conform with local codes. In the absence of loc al codes you must co mply with the Natio nal Fuel Gas Code, ANSI Z223.1-latest edition in the U.S.A. and the CAN/CGA B149 Installation Codes in Canada.
C. BTU Specifi cations
U.S. (0-2000 ft.) or Canada (2000-4500 ft.)
Models
Soho24 (NG)
Soho24LP
Maximum
Input BTU/h
US
14,000 N/A 50
CAN
12,600 N/A 51
US
13,000 N/A 59
CAN
11,700 N/A 60
Input BTU/h
Minimum
Orifi ce
Size
(DMS)
D. High Altitude Installations
U.L. Listed gas appliances are tested and approved without requiring changes for elevations from 0 to 2000 feet in the U.S.A. and Canada.
When installing this appliance at an elevation above 2000 feet, it may be necessary to decrease the input rating by changing the existing burner orifi ce to a smaller size. Input rate should be reduced by 4% for each 1000 feet above a 2000 foot elevation in the U.S.A., or 10% for elevations between 2000 and 4500 feet in Canada. If the heating value of the gas has been reduced, these rules do not apply. To identify the proper orifi ce size, check with the local gas utility .
If installing this appliance at an elevation above 4500 feet (in Canada), check with local authorities.
WARNING
Do NOT use this appliance if any part has been under water. Immediately call a qualifi ed service technician to inspect the appliance and to replace any part of the control system and any gas control which has been under water.
E. Non-Combustible Materials Specifi cation
Material which will not ignite and burn. Such materials are those consisting entirely of steel, iron, brick, tile, concrete, slate, glass or plasters, or any combination thereof.
Materials that are reported as passing ASTM E 136,
Standard Test Method for Behavior of Materials in a Vertical Tube Furnace at 750ºC, shall be considered
non-combustible materials.
F. Combustible Materials Specifi cation
Materials made of or surfaced with wood, compressed paper, plant fi bers, plastics, or other material that can ignite and burn, whether fl ame proofed or not, or whether plastered or unplastered shall be considered combustible materials.
G. Electrical Codes
NOTICE: This appliance must be electrically wired and grounded in accordance with local codes or, in the absence of local codes, with National Electric Code ANSI/NFPA
70-latest edition or the Canadian Electric Code CSA C22.1.
• A 110-120 VAC circuit for this product must be protected with ground-fault circuit-interrupter protection, in compliance with the applicable electrical codes, when it is installed in locations such as in bathrooms or near sinks.
4
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12
Note: The following requirements reference various Massachuset ts and national codes not contain ed in this document.
H. Requirements for the Commonwealth of
Massachusetts
For all side wall horizontally vented gas fueled equipment installed in every dwelling, building or structure used in whole or in part for residential purposes, including those owned or operated by the Commonwealth and where the side wall exhaust vent termination is less than seven (7) feet above fi nished grade in the area of the venting, including but not limited to decks and porches, the following requirements shall be satisfi ed:
Installation of Carbon Monoxide Detectors
At the time of installation of the side wall horizontal vented gas fueled equipment, the installing plumber or gas fi tter shall observe that a hard wired carbon monoxide detector with an alarm and battery back-up is installed on the fl oor level where the gas equipment is to be installed. In addition, the installing plumber or gas fi tter shall observe that a battery operated or hard wired carbon monoxide detector with an alarm is installed on each additional level of the dwelling, building or structure served by the side wall horizontal vented gas fueled equipment. It shall be the responsibility of the property owner to secure the services of qualifi ed licensed professionals for the installation of hard wired carbon monoxide detectors.
In the event that the side wall horizontally vented gas fueled equipment is installed in a crawl space or an attic, the hard wired carbon monoxide detector with alarm and battery back-up may be installed on the next adjacent fl oor level.
Inspection
The state or local gas inspector of the side wall horizontally vented gas fueled equipment shall not approve the installation unless, upon inspection, the inspector observes carbon monoxide detectors and signage installed in accordance with the provisions of 248 CMR 5.08(2)(a)1 through 4.
Exemptions
The following equipment is exempt from 248 CMR 5.08(2) (a)1 through 4:
• The equipment listed in Chapter 10 entitled “Equipment
Not Required To Be Vented” in the most current edition of NFPA 54 as adopted by the Board; and
• Product Approved side wall horizontally vented gas fueled
equipment installed in a room or structure separate from the dwelling, building or structure used in whole or in part for residential purposes.
MANUFACTURER REQUIREMENTS
Gas Equipment Venting System Provided
When the manufacturer of Product Approved side wall horizontally vented gas equipment provides a venting system design or venting system components with the equipment, the instructions provided by the manufacturer for installation of the equipment and the venting system shall include:
• Detailed instructions for the installation of the venting system design or the venting system components; and
• A complete parts list for the venting system design or venting system.
In the event that the requirements of this subdivision can not be met at the time of completion of installation, the owner shall have a period of thirty (30) days to comply with the above requirements; provided, however, that during said thirty (30) day period, a battery operated carbon monoxide detector with an alarm shall be installed.
Approved Carbon Monoxide Detectors
Each carbon monoxide detector as required in accordance with the above provisions shall comply with NFPA 720 and be ANSI/UL 2034 listed and IAS certifi ed.
Signage
A metal or plastic identifi cation plate shall be permanently mounted to the exterior of the building at a minimum height of eight (8) feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment. The sign shall read, in print size no less than one-half (1/2) inch in size,
“GAS VENT DIRECTL Y BELOW. KEEP CLEAR OF ALL OBSTRUCTIONS”.
Gas Equipment Venting System NOT Provided
When the manufacturer of a Product Approved side wall horizontally vented gas fueled equipment does not provide the parts for venting the fl ue gases, but identifi es “special venting systems”, the following requirements shall be satisfi ed by the manufacturer:
• The referenced “special venting system” instructions shall
be included with the appliance or equipment installation instructions; and
• The “special venting systems” shall be Product Approved
by the Board, and the instructions for that system shall include a parts list and detailed installation instructions.
A copy of all installation instructions for all Product Approved side wall horizontally vented gas fueled equipment, all venting instructions, all parts lists for venting instructions, and/or all venting design instructions shall remain with the appliance or equipment at the completion of the installation.
See Gas Connection section for additional Commonwealth of Massachusetts requirements.
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12
5
2
2
Getting Started
A. Design and Installation Considerations
Heat & Glo direct vent gas appliances are designed to operate with all combustion air siphoned from outside of the building and all exhaust gases expelled to the outside. No additional outside air source is required.
CAUTION
Check building codes prior to installation.
• Installation MUST comply with local, regional, state and national codes and regulations.
• Consult local building, fi re offi cials or authorities having jurisdic- tion about restrictions, installation inspection, and permits.
When planning an appliance installation, it’s necessary to determine the following information before installing:
• Where the appliance is to be installed.
• The vent system confi guration to be used.
• Gas supply piping.
• Electrical wiring.
• Framing and fi nishing details.
• Whether optional accessories—devices such as a fan, wall switch, or remote control—are desired.
C. Inspect Appliance and Components
WARNING
Inspect appliance and components for damage. Damaged parts may impair safe operation.
• Do NOT install damaged components.
• Do NOT install incomplete components.
• Do NOT install substitute components. Report damaged parts to dealer.
• Carefully remove the appliance and components from the packaging.
• The vent system components and trim doors are shipped in separate packages.
• The gas logs may be packaged separately and must be eld installed.
• Report to your dealer any parts damaged in shipment, particularly the condition of the glass.
• Read all of the instructions before starting the insta­llation. Follow these instructions carefully during the installation to ensure maximum safety and benefi t.
WARNING
WARNING
Keep appliance dry.
• Mold or rust may cause odors.
• Water may damage controls.
B. Tools and Supplies Needed
Before beginning the installation be sure that the following tools and building supplies are available.
Reciprocating saw Framing material Pliers Noncorrosive leak check solution Hammer Gloves Phillips screwdriver Framing square Flat blade screwdriver Electric drill and bits (1/4 in.) Plumb line Safety glasses Level 1/2 - 3/4 inch length, #6 or #8 Self-drilling screws Manometer Voltmeter Tape measure Caulking material (300ºF minimum continuous exposure rating)
• Installation and use of any damaged appliance or vent system component.
• Modifi cation of the appliance or vent system.
• Installation other than as instructed by Hearth & Home Technologies.
• Improper positioning of the gas logs or the glass door.
• Installation and/or use of any component part not approved by Hearth & Home Technologies.
Any such action may cause a fi re hazard.
Hearth & Home Technologies disclaims any responsibility for, and the warranty will be voided by, the following actions:
6
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12
3
3
Framing and Clearances
Note:
Illustrations reflect typical installations and are FOR
DESIGN PURPOSES ONLY.
Illustrations/diagrams are not drawn to scale.
Actual installation may vary due to individual design
preference.
A. Selecting Appliance Location
When selecting a location for your appliance it is important to consider the required clearances to walls (see fi gure 3.1).
E
A
1/2 IN.
WARNING
Fire Risk Provide adequate clearance:
• Around air openings
• To combustibles
• For service access Locate appliance away from traffi c areas.
NOTE: For actual appliance dimensions refer to Sec­tion 16.
B. Mantel Projections
A Studio front is required for all installs. No mantels are allowed when using Studio fronts.
A
Figure 3.1 Appliance Locations
B
C
TOP VENT,
ONE 90º ELBOW
In addition to these framing dimensions, also reference the following sections:
• Clearances and Mantel Projections (Section 3B).
• Vent Clearances and Framing (Section 6).
B
ALCOVE
INSTALLATION
D
ABCDE
Inches 33-1/8 29-1/8 46-3/4 35-1/8 12
Millimeters 841 740 1187 892 305
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12
7
C. Constructing the Appliance Chase
A chase is a vertical boxlike structure built to enclose the gas appliance and/or its vent system. Vertical vents that run on the outside of a building may be, but are not required to be, installed inside a chase.
on a cement surface, a layer of plywood may be placed underneath to prevent conducting cold up into the room.
D. Clearances
WARNING
Construction of the chase may vary with the type of building. These instructions are not substitutes for the requirements of local building codes. Local building codes MUST be checked.
Chases should be constructed in the manner of all outside walls of the home to prevent cold air drafting problems. The chase should not break the outside building envelope in any manner.
Walls, ceiling, base plate and cantilever fl oor of the chase should be insulated. Vapor and air infi ltration barriers should be installed in the chase as per regional codes for the rest of the home. Additionally, in regions where cold air infi ltration may be an issue, the inside surfaces may be sheetrocked and taped for maximum air tightness.
T o further prevent drafts, the wall shield and ceiling fi restops should be caulked with caulk with a minimum of 300ºF continuous exposure rating to seal gaps. Gas line holes and other openings should be caulked with caulk with a minimum of 300ºF continuous exposure rating or stuffed with unfaced insulation. If the appliance is being installed
A
Fire Risk. Odor Risk.
Install appliance on hard metal or wood surfaces extending full width and depth of appliance.
Do NOT install appliance directly on carpeting, vinyl, tile or any combustible material other than wood.
WARNING
Fire Risk.
Construct chase to all clearance specifi cations in manual.
Locate and install appliance to all clearance specifi cations in manual.
CAUTION
The Soho24B requires an elevated platform construction
to accommodate the Studio fronts, which are larger than the appliance.
B
C
D
ABCDE F G H I JK
Rough
Opening
(Vent Pipe)
Inches
mm
Figure 3.2 Clearances to Combustibles
8-5/8 44 11-1/2 30-1/8 3 28 0 0 1/2 1/2 36
219 1118 292 765 76 711 0 0 13 13 914
Rough
Opening
(Height)
Rough
Opening
(Depth)
E
CLEARANCES TO COMBUSTIBLES:
Rough
Opening
(Width)
Minimum
Platform
Height
Clearance
to Ceiling
G
K
Combustible
Floor
H
Combustible
Flooring
J
Behind
Appliance
Sides of
Appliance
F
I
Front of
Appliance
8
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12
4
4
Termination Locations
A. Vent Termination Minimum Clearances
WARNING
Fire Risk. Explosion Risk. Maintain vent clearance to combustibles as
specifi ed.
• Do not pack air space with insulation or other materials.
Failure to keep insulation or other materials away from vent pipe may cause fi re.
Measure vertical clearances from this surface.
HORIZONTAL
OVERHANG
2 FT. MIN.
GAS DIRECT VENT TERMINATION CAP
20 INCHES MIN.
LOWEST
DISCHARGE
OPENING
H (MIN.) - MINIMUM HEIGHT FROM ROOF TO LOWEST DISCHARGE OPENING
X
12
ROOF PITCH
VERTICAL
WALL
IS X/ 12
Roof Pitch H (Min.) Ft.
Flat to 6/12...........................................................1.0*
Over 6/12 to 7/12 .................................................1.25*
Over 7/12 to 8/12 .................................................1.5*
Over 8/12 to 9/12 .................................................2.0*
Over 9/12 to 10/12 ...............................................2.5
Over 10/12 to 11/12 .............................................3.25
Over 11/12 to 12/12 .............................................4.0
Over 12/12 to 14/12 .............................................5.0
Over 14/12 to 16/12 .............................................6.0
Over 16/12 to 18/12 .............................................7.0
Over 18/12 to 20/12 .............................................7.5
Over 20/12 to 21/12 .............................................8.0
* 3 foot minimum in snow regions
Measure horizontal clearances from this surface.
(See Figure 4.4 for specifi c clearances)
Figure 4.1
Figure 4.2 Minimum height from roof to lowest discharge opening
Figure 4.2 specifi es minimum vent heights for various pitched roofs.
6 in. (minimum) up to 20 in.
Gas
Termination
Cap **
*
In a staggered installation with both gas and wood or fuel oil
**
terminations, the wood or fuel oil termination cap must be higher than the gas termination cap.
AB
152 mm/508 mm
20 in. and over 0 in. minimum
Gas, Wood or Fuel Oil
Termination Cap
B
If using decorative cap cover(s), this distance may need to be increased. Refer to the installation instructions supplied with the decorative cap cover.
A *
18 in. minimum
457 mm
Figure 4.3 Multiple Vertical Termination
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12
9
C
V
B
J
V
V
= VENT TERMINAL
X
= AIR SUPPLY INLET
B
D
V
V
V
A
F
B
G
M
= AREA WHERE TERMINAL IS NOT PERMITTED
A = 12 inches.................clearances above grade, veranda,
porch, deck or balcony
12 inches.................clearance to window or door that may
B =
be opened, or to permanently closed
window
C = 18 inches.................clearance below unventilated soffi t
18 inches.................clearance below ventilated soffi t
30
inches .................clearance below vinyl soffits and
electrical service
D = 6 inches...................clearance to outside corner
E = 6 inches...................clearance to inside corner
F = 3 ft. (Canada) ..........not to be installed above a gas me-
ter/regulator assembly within 3 feet
horizontally from the center-line of the
regulator
G = 3 ft ...........................clearance to gas service regulator
vent outlet H = 9 inches (U.S.A)
12 inches (Canada).clearance to non-mechanical (unpow-
ered) air supply inlet, combustion air
inlet or direct-vent termination i = 3 ft. (U.S.A.)
6 ft. (Canada) ...........clearance to a mechanical (powered)
air supply inlet All mechanical air intakes within 10 feet of a termination cap must be a minimum of 3 feet below termination.
J = 7 ft. ......................... On public property: clearance above
paved sidewalk or a paved driveway. A vent shall not terminate directly above a sidewalk or paved
driveway which is located between two single family dwellings and serves both dwellings.
K = 6 inches................. clearance from sides of electrical
service
L = 12 inches................ clearance above electrical service
Location of the vent termination must not interfere with access to the electrical service.
M = 18 inches ....................clearance under veranda, porch, deck,
balcony or overhang 42
inches ................vinyl or composite overhang
Permitted when veranda, porch, deck or balcony is fully open
on a minimum of 2 sides beneath the fl oor.
Figure 6.3 Minimum Clearances for Termination
O
N
P
R
Q
H or i
V
X
H
V
V
H
E
V
V
A
V
K
V
L
Electrical
Service
C
V
K
V
Covered Alcove Applications
(Spaces open only on one side and with an overhang)
N = 6 inches ........... non-vinyl sidewalls
12 inches ......... vinyl sidewalls
O = 18 inches ......... non-vinyl soffi t and overhang
42 inches ......... vinyl soffi t and overhang
P = 8 ft.
Q
MIN
1 cap 3 feet 2 x Q 2 caps 6 feet 1 x Q 3 caps 9 feet 2/3 x Q 4 caps 12 feet 1/2 x Q
Q
= # termination caps x 3 R
MIN
Measure vertical clearances from this surface.
Measure horizontal clearances from this surface.
= (2 / # termination caps) x Q
MAX
R
MAX
ACTUAL
ACTUAL
ACTUAL
ACTUAL
ACTUAL
CAUTION! Risk of Burns! Termination caps are HOT, consider proximity to doors, traffi c areas or where people may pass or gather (sidewalk, deck, patio, etc.). Listed cap shields available. Contact your dealer.
• Local codes or regulations may require different clearances.
• Vent system termination is NOT permitted in screened porches.
• Vent system termination is permitted in porch areas with two or more sides open.
• Hearth & Home Technologies assumes no responsibility for the improper performance of the appliance when the venting system does not meet these requirements.
• Vinyl protection kits are suggested for use with vinyl siding.
10
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12
5
5
Vent Information and Diagrams
A. Vent Table Key
The abbreviations listed in this vent table key are used in the vent diagrams.
Symbol Description
V V H H
First section (closest to appliance) of vertical length
1
Second section of vertical length
2
First section (closest to appliance) of horizontal length
1
Second section of horizontal length
2
WARNING
Fire Hazard. Explosion Risk. Asphyxiation Risk. Do NOT connect this gas appliance to a chimney
ue serving a separate solid-fuel or gas burning appliance.
• Vent this appliance directly outside.
• Use separate vent system for this appliance. May impair safe operation of this appliance or
other appliances connected to the fl ue.
B. Use of Elbows
CAUTION
ALL vent confi guration specifi cations MUST be followed.
• This product is tested and listed to these specifi cations.
• Appliance performance will suffer if specifi cations are not followed.
Vertical
12 in.
8-1/2 in.
8-1/2 in.
Horizontal
Figure 5.1
C. Measuring Standards
Vertical and horizontal measurements listed in the vent diagrams were made using the following standards.
1. Pipe measurements are shown using the effective length of pipe (see Figure 5.2).
2. Horizontal terminations are measured to the outside mounting surface (fl ange of termination cap) (see Figure 4.1).
3. Vertical terminations are measured to bottom of termi­nation cap.
4. Horizontal pipe installed level with no rise.
Diagonal runs have both vertical and horizontal vent as­pects when calculating the effects. Use the rise for the vertical aspect and the run for the horizontal aspect (see Figure 5.1).
Two 45º elbows may be used in place of one 90º elbow . On 45º runs, one foot of diagonal is equal to 8-1/2 (216 mm) inches horizontal run and 8-1/2 (216 mm) inches vertical run. A length of straight pipe is allowed between two 45º elbows (see Figure 5.1).
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12
Effective
Height/ Length
Figure 5.2 SLP Pipe Effective Length
Effective Height/Length
Pipe inches mm
SLP4 4 102
SLP6 6 152 SLP12 12 305 SLP24 24 610 SLP36 36 914 SLP48 48 1219 SLP6A 2 - 6 51 - 152
SLP12A 2 - 12 51 - 305
11
D. Vent Diagrams
Fire Risk. Explosion Risk. Do NOT pack insulation or other combustibles between ceiling fi restops.
• ALWAYS maintain specifi ed clearances around venting and fi restop systems.
• Install wall shield and ceiling fi restops as specifi ed. Failure to keep insulation or other material away from vent pipe may cause fi re.
1. Top Vent - Horizontal Termination
WARNING
One Elbow
Figure 5.3
Two Elbows
V1 Minimum H1 Maximum
Elbow only 1-1/2 ft. 457 mm
1 ft. 305 mm 2-1/2 ft. 762 mm 1-1/2 ft. 457 mm 3-1/2 ft. 1.1 m 2-1/2 ft. 762 mm 5-1/2 ft. 1.7 m
V
1
H
1
3-1/2 ft. 1.1 m 7-1/2 ft. 2.3 m 4-1/2 ft. 1.4 m 15-1/2 ft. 4.7 m
V
+ H1 = 39 ft. (11.9 m) Maximum
1
H
= 15-1/2 ft. (4.7 m) Maximum
1
V1 Minimum H1 + H2 Maximum
2 - 90º elbows
back to back
Cannot do
6 in 152 mm 1 1/2 ft. 457 mm 1-1/2 ft. 457 mm 2-1/2 ft. 762 mm 2-1/2 ft. 762 mm 4-1/2 ft. 1.4 m 3-1/2 ft. 1.1 m 6-1/2 ft. 1.9 m 5-1/2 ft. 1.7 m 15-1/2 ft. 4.7 m
V
+ H1+ H2 = 48 ft. (14.6 m) Maximum
1
H
+ H2 = 15-1/2 ft. (4.7 m) Maximum
1
12
Figure 5.4
V
H
2
INSTALLED
HORIZONTALLY
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12
H
1
1
1. Top Vent - Horizontal Termination - (continued)
Three Elbows
H
V1 Min. H1 Max. V2 Min. H2 Max.
Elbow only 2 ft. 610 mm * = V
1 ft. 304 mm 2 ft. 610 mm * = V 1-1/2 ft. 457 mm 3 ft. 914 mm * = V 2-1/2 ft. 762 mm 5 ft. 1.5 m * = V 3-1/2 ft. 1.1 m 7 ft. 2.1 m * = V
2
2
2
2
2
4-1/2 ft. 1.4 m 15 ft. 4.6 m * = 0
*When using V2 , H2 Max = V2. If V2 = 0, then H2 Max = 1-1/2 ft. (38 mm)
(H1 + H2 ) cannot exceed 15 ft. (4.6 m) when using appropriate V2.
2
V
2
Figure 5.5
H
V
1
1
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12
13
2. Top Vent - Vertical Termination
No Elbow
V
1
V1 = 45 ft Max. (13.72 m)
V1 = 3 ft Min. (914 mm)
Note: The vertical termination baf e should be used for runs of 7 feet or greater.
Use the vertical termination baffl e for these applications:
• Extended vertical vent runs
• Extended vertical and horizontal vent runs with PVK-80 Power Vent. The vertical restrictor has a break away portion that creates a larger hole. If
venting 7-15 feet, the break away portion MUST be removed and the larger hole must be used. If venting over 15 feet, the break away portion should be left in place and the small hole should be used. For PVK-80 Power Vent ap­plications, the break away portion should be left in place and the small hole should be used.
Figure 5.6
Two Elbows
BREAK AWAY PORTION
VERTICAL TERMINATION BAFFLE
V1 Minimum H1 Maximum V
V1 + V2 Minimum
2
One Elbow 1-1/2 ft. 457 mm * * *
1/2 ft. 152 mm 2 ft. 610 mm * * *
1-1/2 ft. 457 mm 3 ft. 914 mm * * * 2-1/2 ft. 762 mm 5 ft. 1.5 m * * * 3-1/2 ft. 1.1 m 7 ft. 2.1 m * * * 5-1/2 ft. 1.7 m 15 ft. 4.6 m * * *
V
+ V2 + H1 = 38 ft. (11.6 m) Max.
1
*No specifi c restrictions on this value EXCEPT
V
2
V
H
1
1
V
+ V2 + H1 cannot exceed 38 ft. (11.6 m)
1
Figure 5.7
14
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12
2. Top Vent - Vertical Termination - (continued)
Three Elbows
V1 Minimum H1+ H2 Maximum V2V1+ V2 Minimum
Elbow only 1/2 ft. 152 mm * * *
1/2 ft. 152 mm 1 ft. 305 mm * * * 1-1/2 ft. 457 mm 2 ft. 610 mm * * * 2-1/2 ft. 762 mm 4 ft. 1.2 m * * * 3-1/2 ft. 1.1 m 6 ft. 1.8 m * * * 4-1/2 ft. 1.4 m 14 ft. 4.3 m * * *
H1 + H2 = 14 ft (4.3 m) Maximum
V1 + V2 + H1 + H2 = 37 ft (11.3 m) Maximum
*No specifi c restrictions on this value EXCEPT V1 + V2 + H1 + H2 cannot
exceed 37 ft. (11.3 m)
V
2
Figure 5.8
H
1
H
2
INSTALLED
HORIZONTALLY
V
1
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12
15
6
6
Vent Clearances and Framing
A. Pipe Clearances to Combustibles
WARNING
Fire Risk. Explosion Risk. Maintain vent clearance to combustibles as
specifi ed.
• Do not pack air space with insulation or other materials.
Failure to keep insulation or other materials away from vent pipe may cause fi re.
Note: Heat shields MUST overlap by a minimum of 1-1/2 in. (38 mm).
SLP heat shield - designed to be used on a wall 4-3/8 in. to 7-5/8 in. (111 mm to 194 mm thick).
• If wall thickness is less than 4-3/8 the existing heat shields must be field trimmed. If wall thickness is greater than 7-5/8 in. a DVP­HSM-B will be required.
2-1/2 in. (64 mm)
top clearance at
wall shield firestops
3 in. (76 mm)
top clearance
Heat
Shields
B. Wall Penetration Framing
Combustible Wall Penetration
Whenever a combustible wall is penetrated, you must frame a hole for the wall shield fi restop. The wall shield restop maintains minimum clearances and prevents cold air infi ltration.
• The opening must be framed on all four sides using the same size framing materials as those used in the wall construction.
• SLP pipe - A wall shield fi restop must be placed on each side of an interior wall. A minimum 1-1/2 in. (38 mm) overlap of attached heat shields must be maintained.
• See Section 8.L. for information for regarding the instal­lation of a horizontal termination cap.
Non-Combustible Wall Penetration
If the hole being penetrated is surrounded by noncom­bustible materials such as concrete, a hole with diameter one in. greater than the pipe is acceptable.
Whenever a non-combustible wall is penetrated, the wall shield fi restop is only required on one side and no heat shield is necessary.
1 in. (25 mm) clearance around vertical sections
Wall
Shield
Firestop
1 in. (25 mm) clearance bottom and sides
Figure 6.1 Horizontal venting clearances to combustible materials
1/2 in. (13 mm) bottom clearance at wall shield firestops
WALL
10 in.
10 in.
B
A*
A* B
38 in. 37 in.
* Shows center of vent framing hole for top venting. The center of the hole
is one (1) inch (25.4 mm) above the center of the horizontal vent pipe.
Figure 6.2 Exterior Wall Hole
16
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12
C. Vertical Penetration Framing
A ceiling restop MUST be used between oors and attics.
• Frame opening 9 in. x 9 in. (229 mm x 229 mm) whenever the vent penetrates a ceiling/ oor (see Figure 6.3).
• Frame the area with the same sized lumber as used in ceiling/fl oor joist.
• The ceiling fi restop may be installed above or below the ceiling joists when installed with a attic insulation shield. It must be under joists between fl oors that are not insulated. Refer to Figure 6.4.
• Secure with three fasteners on each side.
WARNING! Risk of Fire! DO NOT pack insulation around the vent. Insulation must be kept back from the pipe to prevent overheating.
ATTIC ABOVE
A
A
Figure 6.3
PIPE SLP
INSTALL ATTIC INSULATION SHIELDS
BEFORE OR AFTER INSTALLATION OF VENT SYSTEM
3 FASTENERS
PER SIDE
A
9 in. (229 mm)
CEILING FIRESTOP
INSTALLED BELOW CEILING
Figure 6.4 Installing the Attic Shield
Heat & Glo • Soho24B • 2137-900 Rev. P • 8/12
CEILING FIRESTOP
INSTALLED ABOVE CEILING
17
Loading...
+ 38 hidden pages