Heat & Glo Pier-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI Owner’s Manual

Page 1
Models: Pier-HVB-IPI ST-HVB-IPI LCOR-HVB-IPI RCOR-HVB-IPI
READ THIS MANUAL BEFORE INSTALLING OR OPERA TING THIS APPLIANCE. THIS INSTALLERS GUIDE MUST BE LEFT WITH APPLIANCE FOR FUTURE REFERENCE.
WARNING: IF THE INFORMATION IN THESE INSTRUCTIONS IS NOT FOLLOWED EXACTL Y, A FIRE OR EXPLOSION MAY RESULT CAUS­ING PROPERTY DAMAGE, PER­SONAL INJURY, OR DEATH.
Owner’s Manual
Installation and Operation
Underwriters
WARNING: IMPROPER INSTALLA­TION, ADJUSTMENT, ALTERATION, SERVICE OR MAINTENANCE CAN CAUSE INJURY OR PROPERTY DAM­AGE. REFER TO THIS MANUAL. FOR ASSIST ANCE OR ADDITIONAL INFOR­MATION CONSULT A QUALIFIED IN­ST ALLER, SERVICE AGENCY , OR THE GAS SUPPLIER.
- Do not store or use gasoline or other flam­mable vapors and liquids in the vicinity of this or any other appliance.
- What to do if you smell gas
• Do not try to light any appliance.
• Do not touch any electrical switch.
• Do not use any phone in your building.
• Immediately call your gas supplier from a
neighbor's phone. Follow the gas supplier's instructions.
• If you cannot reach your gas supplier, call
the fire department.
- Installation and service must be performed by a qualified installer, service agency, or the gas supplier.
Printed in U.S.A. Copyright 2006
Heat & Glo, a brand of Hearth & Home T echnologies Inc. 20802 Kensington Boulevard, Lakeville, MN 55044
This product may be covered by one or more of the following patents: (United States) 4593510, 4686807, 4766876, 4793322, 481 1534, 5000162, 5016609, 5076254, 51 13843, 5191877, 5218953, 5263471, 5328356, 5341794, 5347983, 5429495, 5452708, 5542407, 5601073, 5613487, 5647340, 5688568, 5762062, 5775408, 5890485, 5931661, 5941237, 5947112, 5996575, 6006743, 6019099, 6048195, 6053165, 6145502, 6170481, 6237588, 6296474, 6374822, 6413079, 6439226, 6484712, 6543698, 6550687, 6601579, 6672860, 6688302B2, 6715724B2, 6729551, 6736133, 6748940, 6748942, 6769426, 6774802, 6796302, 6840261, 6848441, 6863064, 6866205, 6869278, 6875012, 6880275, 6908039, 6919884, D320652, D445174, D462436; (Canada) 1297749, 2195264, 2225408, 2313972; (Australia) 780250, 780403, 1418504 or other U.S. and foreign patents pending.
1.This appliance may be installed in an af­termarket, permanently located, manufac­tured (mobile) home, where not prohibited by local codes.
2. This appliance is only for use with the type of gas indicated on the rating plate. This appliance is not convertible for use with other gases, unless a certified kit is used.
In the Commonwealth of Massachusetts:
• installation must be performed by a licensed plumber or gas fitter;
• a CO detector shall be installed in the room where the appliance is installed.
Please contact your Heat-N-Glo dealer with any questions or concerns. For the number of your nearest Heat-N-Glo dealer, please call 1-888-427-3973.
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
1
Page 2
Safety and Warning Information
READ and UNDERSTAND all instructions carefully
!
before starting the installation. FAILURE TO FOLLOW these installation instructions may result
in a possible fire hazard and will void the warranty.
Prior to the first firing of the fireplace, READ the
!
Using Your Fireplace section of the Owners Guide.
DO NOT USE this appliance if any part has been
!
under water. Immediately CALL a qualified service technician to inspect the unit and to replace any part of the control system and any gas control which has been under water.
THIS UNIT IS NOT FOR USE WITH SOLID FUEL.
!
Installation and repair should be PERFORMED by a qualified service person. The appliance and venting
!
system should be INSPECTED before initial use and at least annually by a professional service person. More frequent cleaning may be required due to excessive lint from carpeting, bedding material, etc. It is IMPERATIVE that the unit’s control compartment, burners, and circulating air passageways adequate combustion and ventilation air.
BE KEPT CLEAN to provide for
These units MUST use one of the vent systems described in the Installing the Fireplace section of
!
the Installers Guide. NO OTHER vent systems or components MAY BE USED.
This gas fireplace and vent assembly MUST be
!
vented directly to the outside and MUST NEVER be attached to a chimney serving a separate solid fuel burning appliance. Each gas appliance MUST USE a separate vent system. Common vent systems are
PROHIBITED.
INSPECT the external vent cap on a regular basis to
!
make sure that no debris is interfering with the air flow.
The glass door assembly MUST be in place and
!
sealed, and the trim door assembly MUST be in place on the fireplace before the unit can be placed into safe operation.
DO NOT OPERATE this appliance with the glass
!
door removed, cracked, or broken. Replacement of the glass door should be performed by a licensed or qualified service person. DO NOT strike or slam the glass door.
Always KEEP the appliance clear and free from
!
combustible materials, gasoline, and other flammable vapors and liquids.
NEVER OBSTRUCT the flow of combustion and
!
ventilation air. Keep the front of the appliance CLEAR of all obstacles and materials for servicing and proper operations.
Due to the high temperature, the appliance should be LOCATED out of traffic areas and away from
!
furniture and draperies. Clothing or flammable material SHOULD NOT BE PLACED on or near the appliance.
Children and adults should be ALERTED to the
!
hazards of high surface temperature and should ST AY AW AY to avoid burns or clothing ignition. Y oung children should be CAREFULL Y SUPERVISED when they are in the same room as the appliance.
The glass door assembly SHALL ONLY be
!
replaced as a complete unit, as supplied by the gas fireplace manufacturer. NO SUBSTITUTE material may be used.
DO NOT USE abrasive cleaners on the glass door
!
assembly. DO NOT ATTEMPT to clean the glass door when it is hot.
Turn off the gas before servicing this appliance. It is recommended that a qualified service technician
!
perform an appliance check-up at the beginning of each heating season.
Any safety screen or guard removed for servicing
!
must be replaced before operating this appliance.
DO NOT place furniture or any other combustible
!
household objects within 36 inches of the fireplace front.
2
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
Page 3
Table of Contents
Safety and Warning Information.................................................. 2
Service Parts List ......................................................................... 4
Approvals and Codes ................................................................13
Appliance Certification ................................................................................. 13
Installation Codes ........................................................................................ 13
High Altitude Installations............................................................................. 13
Getting Started............................................................................ 14
Introducing the Heat & Glo Gas Fireplaces .................................................. 14
Pre-install Preparation ................................................................................. 14
Installing the Fireplace ............................................................... 18
Step 1. Locating the Fireplace .................................................................... 18
Step 2. Framing the Fireplace..................................................................... 18
Step 3. Inst alling the Vent System .............................................................. 21
A. Vent System Approvals ......................................................... 21
Î
B. Installing V ent Components ................................................... 28
C. Vent Termination.................................................................... 30
Step 4. Positioning, Leveling, and Securing the Fireplace ........................... 33
Step 5. The Gas Control System ................................................................ 33
Step 6. The Gas Supply Line ...................................................................... 34
Step 7. Gas Pressure Requirement s........................................................... 34
Step 8. Wiring the Fireplace........................................................................ 35
Step 9. Finishing......................................................................................... 37
Step 10. Installing Trim, Logs & Ember Material .......................................... 38
Installing the Trim .......................................................................... 38
Positioning the Logs...................................................................... 38
Shutter Settings ............................................................................ 38
Glass Specifications...................................................................... 38
Placing the Ember Material ........................................................... 39
Ember Light Bulb Replacement ..................................................... 39
Step 11. Before Lighting the Fireplace........................................................ 40
Step 12. Lighting the Fireplace ................................................................... 40
After the Installation ..................................................................................... 40
Maintaining and Servicing Your Fireplace................................ 41
Î = Contains updated information.
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
3
Page 4
Service Parts
Pier-HVB-IPI
(NG, LP) Exploded Parts Diagram
9
4
7
Beginning Manufacturing Date: 6-03 Ending Manufacturing Date: ______
10
11
12
3
1
2
8
6
5 Log Assembly
Part number list on following page.
4
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
Page 5
Service Part List (NG, LP)
PIER-HVB-IPI
IMPORT ANT: THIS IS DA TED INFORMA TION. The most current information is located on your dealers VIP site. When ordering,
supply serial and model numbers to ensure correct service parts.
ITEM DESCRIPTION SERIAL # PAR T N UM BER
Burner Orifice NG (#33C) 582-833 Burner Orifice LP (#50C) 582-850
1 End Glass A ssembly GLA-MS
2 Glass Door Assembly GLA-6TROC 3 Burner Assembly 2039-006 4 Log Grate 2039-012 5 Log Set Assembly (Sold as set only) LOGS-MSB 6 Louvers with Mesh - End Panel MS-Louvers-EP 7 Louver, Top 2040-005
8 Louver, Bottom 2040-004 9 Insul ation Bo ar d, Side 2006-136
10 Insulation Board, End 2006-137
11 Hood, black SRV2005-190
12 Hood End, black SRV2006-194
Lava Rock Bag 2005-790 Flue Restrictor 385-128
Ember Mesh Assembly 2006-008
Junction Bo x 4021-013 Mesh Assembly 2005-033A Bracket, Junction Box 2005-173 Mineral Wool 050-721 Fiberglass Rope 060-455 Battery Pack 593-594A
3V Plug 593-593A
Glass Latch Support Assembly 386-122A
ACCESSORIES
Conversion Kit NG NGK-MS
Conversion Kit LP LPK-MS Fan Kit GFK-160A Remo te Co ntrol Ki t RC-SMART-HNG Remo te Co ntrol Ki t SMART-STAT-HNG Re m ot e Co nt r ol - Multi- f unctiona l RCT-MLT-HN G
Wall S w itc h, M ulti-functio nal WSK-MLT Plug Adapator Kit (fo r WSK-MLT) PLUG-ADP Electric Ember Kit EmberKit-MS Logs - Burner - Grate Ugrade K LOGS-UPGRADE
Side Refractory (Opti onal) SRV2005-730
Outsid e Ai r Ki t AK-TV
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
5
Page 6
Service Parts
ST-HVB-IPI
(NG , LP) Exploded Parts Diagram
7
8
5
3
Beginning Manufacturing Date: 6-03
Ending Manufacturing Date: ______
6
Part number list on following page.
2
1
4 Log Assembly
6
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
Page 7
Service Part List (NG, LP)
ST-HVB-IPI
IMPORT ANT: THIS IS DA TED INFORMA TION. The most current information is located on your dealers VIP site. When ordering,
supply serial and model numbers to ensure correct service parts.
ITEM DESCRIPTION SERIAL # PART NUMBER
Burner Orifice NG (#32C) 582-832 Burner Orifice LP (#50C) 582-850
1 Glass Door Assembly GLA-6TROC 2 Burner Assembly 2039-006 3 Log Grate 2039-012 4 Log Set Ass embly (Sold as set only) LOGS-MSB 5 Louver, Top 2040-005 6 Louver, Bottom 2040-004 7 Non-combustible Board 2005-172 8 Hood, black SRV2005-190
Lava Rock Bag 2005-790 Flue Restrictor 385-128 Ember Mesh Assembly 2005-008 Junction Box 4021-013 Mesh Assembly 2005-033A Bracket, Jun ction Box 2005-173 3V Plug 593-593A Bat tery Pack 593-594A Minera l Wo o l 050-721
Fiberglass Rope 060-455 Glass Lat c h 386-122A
ACCESSORIES
Conversion Kit NG NGK-MS Conversion Kit LP LPK-MS Hood, Black, Larger, Optional SRV60-143-bk Fan Kit GFK-160A Remo te C ontrol Ki t R C-SMART-HNG Remo te C ontrol Ki t SMART-STAT-HNG Remot e Cont rol - Mult i-functional RCT-MLT-HNG Wall Switch, Multi -functi onal WS K-MLT Plu g Adapator Kit (f or WSK-M LT PLUG-ADP Electric Ember Kit EmberKit-MS
Logs - Burner - Grate Ugrade Kit LOGS-UPGRADE Side Refractory (Optional) SRV2005-730
See through Re fr a ctor y K it BRICK-ST-HV Outside Air Kit AK-TV
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
7
Page 8
Service Parts
LCOR-HVB-IPI
(NG , LP) Exploded Parts Diagram
12
6
1
2
7
4
10
9
Beginning Manufacturing Date: 6-03
Ending Manufacturing Date: ______
11
8
Part number list on following page.
3
5 Log Assembly
8
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
Page 9
Service Part List (NG, LP)
LCOR-HVB-IPI
IMPORT ANT: THIS IS DA TED INFORMA TION. The most current information is located on your dealers VIP site. When ordering,
supply serial and model numbers to ensure correct service parts.
ITEM DESCRIPTION SERIAL # PART NUMBER
Burner Orifice NG (#32C) 582-832
Burner Orifice LP (#50C) 582-850 1 End Glass A ssembly GLA-MS 2 Glass Door Assembly GLA-6TROC 3 Burner Assembly 2039-006 4 Log Grate 2039-012
5 Log Set Assembly (Sold as set only) LOGS-MSB 6 Louvers wi th Me s h - E nd Pane l MS-Louv ers-EP 7Louver, Top 2040-005 8 Louver, Bottom 2040-004 9 Insulation Bo ard, Sid e 2006-136
10 Insulation Board, End 2008-114
11 Hood, black SRV2005-190
12 Hood End, black S RV2006-194
Lava Rock Bag 2005-790
Flue Restrictor 385-128
Ember Mesh Assembly 2006-008
Junc t ion B ox 4021-013
Mesh Assembly 2005-033A
Bracket, Junction Box 2005-173
Mineral Wool 050-721
Fiberglass Rope 060-455
Glass Latch 386-122A
3V Plug 593-593A
Battery Pack 593-594A
ACCESSORIES
Conversion Kit NG NGK-MS
Conversion Kit LP LPK-MS
Fan Kit GFK-160A
Remo te Control K it RC-SMART-HNG
Remo te Control K it SMART-STAT-HNG
Remote Control - Multi-functional RCT-MLT-HNG
Wall Switch, Multi-functional WSK-MLT
Plug Adapator Kit (for WSK-MLT) PLUG-ADP
Electric Ember Kit EmberKit-MS
Logs - Burner - Grate Ugrade Ki LOGS-UPGRA DE
Side Refractory (Optional)
Corner Refractory Kit BRICK-COR-HV
SRV2005-730
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
9
Page 10
Service Parts
RCOR-HVB-IPI
11
(NG , LP) Exploded Parts Diagram
9
4
7
Beginning Manufacturing Date: 6-03
Ending Manufacturing Date: ______
10
12
8
Part number list on following page.
3
1
6
2
5 Log Assembly
10
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
Page 11
Service Part List (NG, LP)
RCOR-HVB-IPI
IMPORT ANT: THIS IS DA TED INFORMA TION. The most current information is located on your dealers VIP site. When ordering,
supply serial and model numbers to ensure correct service parts.
ITEM DESCRIPTION SERIAL # PART NUMBER
Burner Orifice NG (#32C) 582-832 Burner Orifice LP (#50C) 582-850
1 End Glass Assembly GLA-MS
2 Glass Door Assembly GLA-6TROC 3 Burner Assembly 2039-006 4 Log Grate 2039-012
5 Log Set Assembly (Sold as set onlyt) LOGS-MSB 6 Louvers with Mesh - E nd P a nel MS-Louvers-EP 7 Louver, Top 2040-005 8 Louver, Bottom 2040-004 9 Insul ation Bo ard, Side 2006-136
10 Insulation Board, End 2008-114
11
Hood, black SRV2005-190
12 Hood End, black SRV2006-194
Lava Rock B ag 2005-790 Flue Restrictor 385-128
Ember Mesh Assembly 2006-008 Junction B ox 4021-013 Bracket, Junction Box 2005-173
Mineral Wool 050-721 Fiberglass Rope 060-455
Glass Latch 386-122A 3V Plug 593-593A Battery Pack 593-594A
Mesh Assembly 2005-033A
ACCESSORIES
Conversion Kit NG NGK-MS Conversion Kit LP LPK-MS Fan Kit GFK-160A Remo te C o ntro l Ki t RC-SMART-HNG Remo te C o ntro l Ki t SMART-STAT-HNG Remote Control - Multi-functional RCT-MLT-HNG Wall Switch, Multi-functional WSK-MLT Plug Adapator Kit (for WSK-ML PLUG-ADP Electric Ember Kit EmberKit-MS Logs - Burner - Grate Ugrade Kie LOGS-UPGRADE
Side Refractory (Optional) SRV2005-730
Corner Refractory Kit BRI CK-COR-HV
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
11
Page 12
PIER-HVB-IPI, ST -HVB-IPI
10
Service Parts
(NG , LP) Exploded Parts Diagram
9
L&RCOR-HVB-IPI
Beginning Manufacturing Date: 6-03
Ending Manufacturing Date: ______
8
7
1
4
2
3
ITEM DESCRIPTION SERIAL # PART N UMBER
1 Fle x Ball Valve A sse m bly 302-320A 2 ON/OFF Wire Assembly 060-521A 3Valve NG 750-500
3 Valve LP 750-501 4 Flexible Gas Connector 2005-009 5Module 593-592 6 Wi re Assembly 593-590A 7 Ember Box Assembly 2005-114
8 Pilot Assembly NG 385-510A 8 Pilot Assembly LP 385-511A 9 Valve Bracket 2005-120
10 Ga s k e t Orifi c e 2005-166
Pilot Support Arm 385-120
Ground Stra p 385-512
Pilot Tube 446-301
Orifice Spud NG 446-505
Orifice Spud LP 446-517
Pilot Bracket 2005-118
Regulator NG NGK-DXV
Regulator LP LPK-DXV
6
5
NOTE: Replacement bulbs to be supplied by homeowner . Recommended replacements: Sylvania Mini Candelabra 75 watt s.
12
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
Page 13
1
Approvals and Codes
Appliance Certification
The Heat & Glo fireplace models discussed in this Installers Guide have been tested to certification standards and listed
by the applicable laboratories.
Certification
MODELS: PIER-HVB-IPI, ST - HVB-IPI,
LCOR-HVB-IPI, RCOR-HVB-IPI
LABORA TORY: Underwriters Laboratories TYPE: Vented Gas Fireplace Heater ST ANDARD: ANSI Z21.88•CGA2.22•UL307B
Installation Codes
The fireplace installation must conform to local codes. Before installing the fireplace, consult the local building code agency to ensure that you are in compliance with all applicable codes, including permits and inspections.
In the absence of local codes, the fireplace installation must conform to the National Fuel Gas Code ANSI Z223.1 (in the United States) or the CAN/CGA-B149 Installation Codes (in Canada). The appliance must be electrically grounded in accordance with local codes or, in the absence of local codes with the National Electric Code ANSI/NFPA No. 70 (in the United States), or to the CSA C22.1 Canadian Electric Code (in Canada).
High Altitude Installations
U.L. Listed gas appliances are tested and approved with­out requiring changes for elevations from 0 to 2,000 feet in the U. S. A. and in Canada.
When installing this appliance at an elevation above 2,000 feet, it may be necessary to decrease the input rating by changing the existing burner orifice to a smaller size. Input rate should be reduced by 4% for each 1000 feet above a 2000 foot elevation in the U.S.A. or 10% for elevations between 2000 and 4500 feet in Canada. If the heating value of the gas has been reduced, these rules do not apply . To identify the proper orifice size, check with the local gas utility.
If installing this appliance at an elevation above 4,500 feet (in Canada), check with local authorities.
These models may be installed in a bedroom or bed-sitting room in the U.S.A. and Canada.
Heat & Glo Quality Systems registered by SGS ICS
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
13
Page 14
2
Getting Started
Introducing the Heat & Glo Gas Fireplaces
Heat & Glo direct vent gas fireplaces are designed to oper­ate with all combustion air siphoned from outside of the building and all exhaust gases expelled to the outside.
The information contained in this Installers Guide, unless noted otherwise, applies to all models and gas control systems. Gas fireplace diagrams, including the dimensions, are shown in this section.
Pre-install Preparation
This gas fireplace and its components are tested and safe when installed in accordance with this Installers Guide. Report to your dealer any parts damaged in shipment, particularly the condition of the glass. Do not install any
unit with damaged, incomplete, or substitute parts.
The vent system components are shipped in separate pack­ages. The gas logs are packaged separately and must be field installed.
Read all of the instructions before starting the instal­lation. Follow these instructions carefully during the installation to ensure maximum safety and benefit. Failure to follow these instructions will void the own­er’s warranty and may present a fire hazard.
The Heat & Glo Warranty will be voided by , and Heat & Glo disclaims any responsibility for, the following actions:
• Installation of any damaged fireplace or vent system component.
• Modification of the fireplace or direct vent system.
• Installation other than as instructed by Heat & Glo.
• Improper positioning of the gas logs or the glass door.
• Installation and/or use of any component part not manu­factured and approved by Heat & Glo, not withstanding any independent testing laboratory or other party approval of such component part or accessory .
ANY SUCH ACTION MAY POSSIBLY CAUSE A FIRE HAZARD.
When planning a fireplace installation, it’s necessary to determine:
Where the unit is to be installed.
The vent system configuration to be used.
Gas supply piping.
Electrical wiring.
Framing and finishing details.
Whether optional accessories—devices such as a fan,
wall switch, or remote control—are desired.
If the fireplace is to be installed on carpeting or tile, or on any combustible material other than wood flooring, the fireplace should be installed on a metal or wood panel that extends the full width and depth of the fireplace.
14
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
Page 15
12
(306mm)
Ø8
(204mm)
1/2
(13mm)
(2)
5-1/4
(133mm)
34-3/4
(882mm)
4-1/16
(102mm)
4-1/2
(114mm)
12
(305mm)
TOP VENT
COLLARS
Ø8
(204mm)
ELECTRICAL
ACCESS
GAS LINE
ACCESS
2-5/16
(58mm)
4-3/4
(121mm)
42
(1067mm)
TOP STANDOFFS
42-5/8
(1082mm)
32-5/16
(820mm)
37-7/16
(950mm)
21
(533mm)
8-1/2
(216mm)
(610mm)
REAR VENT
COLLARS
17-15/16 (455mm)
24
21
(533mm)
GAS CONTROLS
& LABELS
Figure 1. Diagram of the PIER-HVB-IPI
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
SIDE GLASS
DOOR
ELECTRICAL
ACCESS
GAS LINE ACCESS
15
Page 16
12
(306mm)
Ø8
(204mm)
5-14
(133mm)
1/2
(13mm)
(4)
34-3/4
(882mm)
4-1/16
(102mm)
4-1/2
(114mm)
(305mm)
TOP VENT
COLLARS
12
ELECTRICAL
ACCESS
Ø8
(204mm)
GAS LINE
ACCESS
2-5/16
(58mm)
4-3/4
(121mm)
42
(1067mm)
TOP STANDOFFS
46-5/8
(1183mm)
32-5/16
(820mm)
36-3/16
(919mm)
21
(533mm)
8-1/2
(216mm)
24
(610mm)
REAR VENT
COLLARS
4-1/2
(114mm)
2-9/16
(64mm)
GAS CONTROLS
& LABELS
Figure 2. Diagram of the ST-HVB-IPI
16
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
SIDE GLASS
DOOR
ELECTRICAL
ACCESS
GAS LINE ACCESS
Page 17
5-1/4
(133mm)
(204mm)
12
(305mm)
Ø8
1/2
(13mm)
(4)
34-3/4
(882mm)
Ø8
(204mm)
TOP VENT
COLLARS
10
(254mm)
(184mm)
12
(305mm)
ELECTRICAL
ACCESS
GAS LINE
ACCESS
2-9/16
(64mm)
2-5/16
(58mm)
4-3/4
(121mm)
TOP STANDOFFS
42-5/8
(1082mm
(533mm)
32-5/16 (820m)
37-7/16
(950mm)
17-15/16 (455mm)
42
21
(1066mm
8-1/2
(216mm)
24-1/8
(612mm)
29-1/4
(743mm)7-1/4
REAR VENT
COLLARS
21
(533mm)
SIDE GLASS
DOOR
END GLASS
GAS CONTROLS
& LABELS
DOOR
Figure 3. Diagram of the LCOR-HVB-IPI and RCOR-HVB-IPI
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
ELECTRICAL
ACCESS
GAS LINE ACCESS
17
Page 18
3
Installing the Fireplace
Step 1. Locating the Fireplace
The diagram below shows space and clearance require­ments for locating a fireplace within a room.
Note: Refer to Figure 4B for dimensions and appliance
Î
locations if installing a Pier-HVB unit with a Catalina shelf and/or marble package.
36"
GLASS
GLASS
RCOR-HVB-IPI
TOP VIEW
GLASS
36"
GLASS
36"
PIER-HVB-IPI
TOP VIEW
GLASS
Note: This location diagram MUST be followed when in­stalling a Pier-HVB with a Catalina shelf/marble package since the fireplace is installed further from finished wall.
FINISHED
WALL
45 -1/4 in. (1149mm)
50-1/2 in.
34-1/2 in.
36"
36"
GLASS
LCOR-HVB-IPI
TOP VIEW
ST-HVB-IPI
TOP VIEW
36"
GLASS
GLASS
36"
GLASS
Figure 4A. Fireplace Dimensions and Locations
Note: Refer to the Catalina installation instruction
included with kit for assembly and installation.
18
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
7 in.
47-1/2 in.
13/16 in.
45-1/4 in.
Marble sizes (inches):
Header.................................. 26 x 8
Side headers .................. 45-1/2 x 8
Legs ................................ 33-1/2 x 7
Figure 4B.
Fireplace Locations/Dimensions with
Catalina Shelf/Marble Package ONL Y
Clearance Requirements
The top, back, and sides of the fireplace are defined by stand-offs. The minimum clearance to a perpendicular wall extending past the face of the fireplace is one inch (25 mm). The metal ends of the fireplace may NOT be recessed into combustible construction.
Page 19
Minimum Clearances
from the Fireplace to Combustible Materials
Inches mm
Glass Sides or Ends.......... 3 6 .................... 914
Floor ................................... 0 ....................... 0
Rear Vent...........................1/2..................... 13
Metal Sides or Ends ..........1/2..................... 13
To p................................... 2 1/2 ................... 64
Ceiling* .............................. 31 .................... 787
* The clearance to the ceiling is measured from the top of
the unit, excluding the standoffs (see Figures 37 & 38).
The distance from the unit to combustible construction is to be measured from the unit outer wrap surface to the com­bustible construction, NOT from the screw heads that se­cure the unit together.
Minimum Clearances
from the Vent Pipe to Combustible Materials
Step 2. Framing the Fireplace
Fireplace framing can be built before or after the fireplace is set in place. Framing should be positioned to accommo­date wall coverings and fireplace facing material. The dia­gram below shows framing reference dimensions.
CAUTION: MEASURE FIREPLACE DIMENSIONS AND VERIFY FRAMING METHODS AND WALL COVERING DET AILS BEFORE FRAMING .
WARNING: FRAMING DIMENSIONS ASSUME
!
USE OF 1/2 INCH THICK WALL COVERING MA TERIALS ON EXTERIOR OF FRAMING ONL Y AND NO SHEETROCK ON INTERIOR OF FRAMING .
Inches mm
Vertical Sections. ............. 1 ................ 25
Horizontal Sections
Top..................................... 3 ................ 75
Bottom ............................... 1 ................ 25
Sides ................................. 1 ................ 25
At Wall Firestops
To p.................................. 2 1/2 ............63.7
Bottom ..............................1/2............... 13
Sides ................................. 1 ................ 25
For minimum clearances, see the direct vent termination clearance diagrams on pages 31 and 32 in this manual.
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
19
Page 20
Shows center of 10” x 12” vent framing holes for top and rear venting. The center of the hole is one inch (25.4mm) above the center of the horizontal vent pipe.
E
D
Framing should be constructed of 2 X 4 lumber or heavier.
ST-HV-IPI L & R-COR-HV-IPI
B
C
A
A
PIER-HV-IPI
B
B
C
A
C
Model A B C D E
PIER-HVB-IPI 42-1/8 42-1/2 23 35-3/4 48 ST-HVB-IPI 47-5/8 42-1/2 23 35-3/4 48 L&RCOR-HVB-IPI 42-1/8 42-1/2 28-3/4 35-3/4 48
Figure 5. Framing Dimensions
20
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
NOTE: DIMENSIONS SHOWN IN INCHES
Page 21
12-3/16
MAX.
DVP12
12
2
MIN.
6
4
DVP4
DVP6
14-1/4
24
9-7/8
DVP12A
10-1/4
DVP45
45.0
36
48
O
DVP24
DVP36
11-1/4
7-1/4
1-1/4 TYP
DVP48
1/2 TYP
NOTE: PIPES OVERLAP 1-1/4 INCHES
AT EACH JOINT.
12-9/16
P
D
V
9
8-9/16
0
T
S
Figure 6. DVP-Series Direct Vent Component Specifications (5-inch inner pipe / 8-inch outer pipe)
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
21
Page 22
Step 3. Installing the Vent System
A. Vent System Approvals
These models are approved to use DVP series direct vent pipe components and terminations (see Figures 6 and 7). Approved vent system components are labeled for identifi­cation. This pipe is tested and listed as an approved com­ponent of the fireplace. The pipe is tested to be run inside an enclosed wall. There is no requirement for inspection openings at each joint within the wall. There is no required pitch for horizontal vent runs. NO OTHER VENTING SYS- TEMS OR COMPONENTS MA Y BE USED.
Detailed installation instructions are included with each vent termination kit and should be used in conjunction with this Installers Guide.
The flame and ember appearance may vary based on the type of fuel burned and the venting configuration used.
Identifying Vent Component s
The vent systems installed on this gas fireplace may in­clude one, two, or three 90° elbow assemblies. The rela­tionships of vertical rise to horizontal run in vent configura­tions using 90° elbows MUST BE strictly adhered to. The rise to run relationships are shown in the venting drawings and tables. Refer to the diagrams on the next several pages.
NOTE: Two 45° elbows may be used in place of one 90° elbow. Rise to run ratios in the vent system must be followed if 45° elbows are used.
This model has a 450 elbow built into it. It may be posi­tioned to vent either horizontal or vertical. Depending on the installation, decide which direction the elbow should be fac­ing. Remove the 8 screws from the corner cover plate. Po­sition the 450 elbow as desired and replace the corner cov­er plate with the 8 screws.
T erminations Kits
VERTICAL TERMINATION
HORIZONTAL TERMINATION
STORM COLLAR
ROOF FLASHING
WALL FIRESTOP
PIPE LENGTH
90 DEGREE ELBOW
CEILING FIRESTOP
DVP-TVPVK-80
DVP-TRAP
SERIES
DVP-TVHW
DVP-TB1
(Required to have a minimum of 3 feet of vertical in the vent system)
Figure 7. Vent System Component s and Termination Kits
22
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
Page 23
STRAIGHT UP
VERTICAL VENTING
V (FT.)
50' MAX. (15.2 M)
CAP
V
NOTE: On vertical venting
configurations you may want to install the flue re­strictor (385-128). See flue restrictor installation in­structions.
Figure 8
Flue Restrictor Instructions
1. Locate the Flue Restrictor which is in the manual
bag.
BREAK
HERE
Figure 10. Flue Restrictor
3. Match the amount of
vertical in the system with the chart to find the appropriate position to set the Flue Restrictor.
- CHART -
Vertical Settings
4' 1-1
8' 1-2 15' 2-2 20' 2-3 25' 3-3 30' 4-3 35' 4-4 40' 4-4 50' 4-5
4.Center the Flue Restrictor on vent and secure in place using two self-tapping screws (see Figure 11).
1 2 3 4 5
FLUE
RESTRICTOR
Figure 9
2. Break the Flue Restrictor into two pieces. Do this
by bending the part back and forth until it breaks (see Figure 10).
SETTINGS
1 2 3 4 5
Figure 11
STRAIGHT OUT
HORIZONT AL VENTING
H
Max. Run
24" (610 mm)
H
Figure 12.
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
23
Page 24
V
NATURAL GAS - VENTING WITH ONE 90° ELBOW
V (FT.) H (FT.)
1' MIN. (305mm) 3' MAX. (914mm) 2' MIN. (610mm) 6' MAX. (1.83m) 3' MIN. (914mm) 9' MAX. (2.7m) 4' MIN. (1.22m) 12' MAX. (3.6m) 5’ MIN. (1.5m) 15’ MAX. (4.5m) 6’ MIN. (1.83m) 18’ MAX. (5.5m)
V + H = 50’ MAX. (15.2m)
PROPANE - VENTING WITH ONE 90° ELBOW
(11.3m)
V (FT.) H (FT.)
1' MIN. (305mm) 2' MAX. (610mm) 2' MIN. (610mm) 4' MAX. (1.22m) 3' MIN. (914mm) 6’ MAX. (1.83m) 4' MIN. (1.22m) 8' MAX. (2.4m) 5’ MIN. (1.5m) 10' MAX. (3.0m) 6’ MIN. (1.83m) 12' MAX. (3.6m)
V + H = 50’ MAX. (15.2m)
Figure 13. Venting with One 90° Elbow
V
H
NATURAL GAS
VENTING WITH ONE 90° ELBOW
V (FT.) H (FT.)
900 Elbow on top 2.5’ MAX. (64mm) 1' MIN. (305mm) 3' MAX. (914mm) 2' MIN. (610mm) 6' MAX. (1.83m) 3' MIN. (914mm) 9' MAX. (2.7m) 4' MIN. (1.22m) 12' MAX. (3.6m) 5’ MIN. (1.5m) 15’ MAX. (4.5m) 6’ MIN. (1.83m) 18’ MAX. (5.5m)
V + H = 50’ MAX. (15.2m)
H
PROPANE
VENTING WITH ONE 90° ELBOW
V (FT.) H (FT.)
900 Elbow on top 2’ MAX. (610mm) 1' MIN. (305mm) 2' MAX. (610mm) 2' MIN. (610mm) 4' MAX. (1.22m) 3' MIN. (914mm) 6’ MAX. (1.83m) 4' MIN. (1.22m) 8' MAX. (2.4m) 5’ MIN. (1.5m) 10' MAX. (3.0m) 6’ MIN. (1.83m) 12' MAX. (3.6m)
V + H = 50’ MAX. (15.2m)
Figure 14. Venting with One 90° Elbow
24
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
Page 25
V
V
NATURAL GAS
VENTING WITH TWO 90° ELBOWS
V (FT.) H + H
1
(FT.)
900 Elbow on top 2.5’ MAX. (64mm) 1' MIN. (305mm) 3' MAX. (914mm) 2' MIN. (610mm) 6' MAX. (1.83m) 3' MIN. (914mm) 9' MAX. (2.7m) 4' MIN. (1.22m) 12' MAX. (3.6m) 5’ MIN. (1.5m) 15’ MAX. (4.5m) 6’ MIN. (1.83m) 18’ MAX. (5.5m)
V + H + H1 = 50’ MAX. (15.2m)
H + H1 = 18’ MAX. (5.5m)
PROPANE
VENTING WITH TWO 90° ELBOWS
V (FT.) H + H
1
(FT.)
900 Elbow on top 2’ MAX. (610mm) 1' MIN. (305mm) 2' MAX. (610mm) 2' MIN. (610mm) 4' MAX. (1.22m) 3' MIN. (914mm) 6’ MAX. (1.83m) 4' MIN. (1.22m) 8' MAX. (2.4m) 5’ MIN. (1.5m) 10' MAX. (3.0m) 6’ MIN. (1.83m) 12' MAX. (3.6m)
V + H + H1 = 50’ MAX. (15.2m)
H + H1 = 12’ MAX. (3.6m)
H
1
H
NATURAL GAS
VENTING WITH TWO 90° ELBOWS
V + V
(FT.) H (FT.)
1
900 Elbow on top 2.5’ MAX. (64mm) 1' MIN. (305mm) 3' MAX. (914mm) 2' MIN. (610mm) 6' MAX. (1.83m) 3' MIN. (914mm) 9' MAX. (2.7m) 4' MIN. (1.22m) 12' MAX. (3.6m) 5’ MIN. (1.5m) 15’ MAX. (4.5m) 6’ MIN. (1.83m) 18’ MAX. (5.5m)
V + V1 + H = 50’ MAX. (15.2m)
PROPANE
VENTING WITH TWO 90° ELBOWS
V + V
(FT.) H (FT.)
1
900 Elbow on top 2’ MAX. (610mm) 1' MIN. (305mm) 2' MAX. (610mm) 2' MIN. (610mm) 4' MAX. (1.22m) 3' MIN. (914mm) 6’ MAX. (1.83m) 4' MIN. (1.22m) 8' MAX. (2.4m) 5’ MIN. (1.5m) 10' MAX. (3.0m) 6’ MIN. (1.83m) 12' MAX. (3.6m)
V + V1 + H = 50’ MAX. (15.2m)
Figure 15. Venting with Two 90° Elbows
V
1
H
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
25
Page 26
V
NATURAL GAS
VENTING WITH TWO 90° ELBOWS
V (FT.) H + H
1
(FT.)
1' MIN. (305mm) 3' MAX. (914mm) 2' MIN. (610mm) 6' MAX. (1.83m) 3' MIN. (914mm) 9' MAX. (2.7m) 4' MIN. (1.22m) 12' MAX. (3.6m) 5’ MIN. (1.5m) 15’ MAX. (4.5m) 6’ MIN. (1.83m) 18’ MAX. (5.5m)
V + H + H1 = 50’ MAX. (15.2m)
1
H + H
= 18’ MAX. (5.5m)
H
1
PROPANE
VENTING WITH TWO 90° ELBOWS
V (FT.) H + H
1
(FT.)
1' MIN. (305mm) 2' MAX. (610mm) 2' MIN. (610mm) 4' MAX. (1.22m) 3' MIN. (914mm) 6’ MAX. (1.83m) 4' MIN. (1.22m) 8' MAX. (2.4m) 5’ MIN. (1.5m) 10' MAX. (3.0m) 6’ MIN. (1.83m) 12' MAX. (3.6m)
V + H + H1 = 50’ MAX. (15.2m)
H + H1 = 12’ MAX. (3.6m)
Figure 16. Venting with Two 90° Elbows
V
NATURAL GAS
VENTING WITH TWO 90° ELBOWS
V (FT.) H + H
1
(FT.)
1' MIN. (305mm) 3' MAX. (914mm) 2' MIN. (610mm) 6' MAX. (1.83m) 3' MIN. (914mm) 9' MAX. (2.7m) 4' MIN. (1.22m) 12' MAX. (3.6m) 5’ MIN. (1.5m) 15’ MAX. (4.5m) 6’ MIN. (1.83m) 18’ MAX. (5.5m)
V + H + H1 = 50’ MAX. (15.2m)
H + H1 = 18’ MAX. (5.5m)
H
PROPANE
VENTING WITH TWO 90° ELBOWS
V (FT.) H + H
1
(FT.)
1' MIN. (305mm) 2' MAX. (610mm) 2' MIN. (610mm) 4' MAX. (1.22m) 3' MIN. (914mm) 6’ MAX. (1.83m) 4' MIN. (1.22m) 8' MAX. (2.4m) 5’ MIN. (1.5m) 10' MAX. (3.0m) 6’ MIN. (1.83m) 12' MAX. (3.6m)
V + H + H1 = 50’ MAX. (15.2m)
H + H1 = 12’ MAX. (3.6m)
H
1
H
Figure 17. Venting with Two 90° Elbows
26
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
Page 27
V
NATURAL GAS
VENTING WITH THREE 90° ELBOWS
1
V + V
(FT.) H + H1 (FT.) 1' MIN. (305mm) 3' MAX. (914mm) 2' MIN. (610mm) 6' MAX. (1.83m) 3' MIN. (914mm) 9' MAX. (2.7m) 4' MIN. (1.22m) 12' MAX. (3.6m) 5’ MIN. (1.5m) 15’ MAX. (4.5m) 6’ MIN. (1.83m) 18’ MAX. (5.5m)
V+ V
+ H + H1 = 50’ MAX. (15.2m)
1
V
1
H
1
1
H + H
= 18’ MAX. (5.5m)
VENTING WITH THREE 90° ELBOWS
1
V + V
(FT.) H + H1 (FT.) 1' MIN. (305mm) 2' MAX. (610mm) 2' MIN. (610mm) 4' MAX. (1.22m) 3' MIN. (914mm) 6’ MAX. (1.83m) 4' MIN. (1.22m) 8' MAX. (2.4m) 5’ MIN. (1.5m) 10' MAX. (3.0m) 6’ MIN. (1.83m) 12' MAX. (3.6m)
V+ V
+ H + H
1
H + H
PROPANE
1
= 50’ MAX. (15.2m)
1
= 12’ MAX. (3.6m)
H
2
NATURAL GAS
VENTING WITH THREE 90° ELBOWS
1
V + V
(FT.) H + H1 + H2 (FT.) 1' MIN. (305mm) 3' MAX. (914mm) 2' MIN. (610mm) 6' MAX. (1.83m) 3' MIN. (914mm) 9' MAX. (2.7m) 4' MIN. (1.22m) 12' MAX. (3.6m) 5’ MIN. (1.5m) 15’ MAX. (4.5m) 6’ MIN. (1.83m) 18’ MAX. (5.5m)
V+ V1 + H + H1 + H2 = 50’ MAX. (15.2m)
1
H + H
= 18’ MAX. (5.5m)
+ H
2
H
H
1
PROPANE
VENTING WITH THREE 90° ELBOWS
1
V + V
(FT.) H + H1 + H2 (FT.) 1' MIN. (305mm) 2' MAX. (610mm) 2' MIN. (610mm) 4' MAX. (1.22m) 3' MIN. (914mm) 6’ MAX. (1.83m) 4' MIN. (1.22m) 8' MAX. (2.4m) 5’ MIN. (1.5m) 10' MAX. (3.0m) 6’ MIN. (1.83m) 12' MAX. (3.6m)
V+ V1 + H + H1 + H2 = 50’ MAX. (15.2m)
1
H + H
= 12’ MAX. (3.6m)
+ H
2
V
H
Figure 18. Venting with three 90° elbows
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
27
Page 28
H
V
1
NATURAL GAS
VENTING WITH THREE 90° ELBOWS
1
V + V
(FT.) H + H1 (FT.) 900 Elbow on top 2.5’ MAX. (64mm) 1' MIN. (305mm) 3' MAX. (914mm) 2' MIN. (610mm) 6' MAX. (1.83m) 3' MIN. (914mm) 9' MAX. (2.7m) 4' MIN. (1.22m) 12' MAX. (3.6m) 5’ MIN. (1.5m) 15’ MAX. (4.5m) 6’ MIN. (1.83m) 18’ MAX. (5.5m)
V+ V1 + H + H1 = 50’ MAX. (15.2m)
H + H1 = 18’ MAX. (5.5m)
V
1
V
1
V
H
PROPANE
VENTING WITH THREE 90° ELBOWS
1
V + V
(FT.) H + H1 (FT.) 900 Elbow on top 2’ MAX. (610mm) 1' MIN. (305mm) 2' MAX. (610mm) 2' MIN. (610mm) 4' MAX. (1.22m) 3' MIN. (914mm) 6’ MAX. (1.83m) 4' MIN. (1.22m) 8' MAX. (2.4m) 5’ MIN. (1.5m) 10' MAX. (3.0m) 6’ MIN. (1.83m) 12' MAX. (3.6m)
+ H + H1 = 50’ MAX. (15.2m)
V+ V1
H + H1 = 12’ MAX. (3.6m)
H
1
H
Figure 19. Venting with three 90° elbows
28
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
Page 29
B. Installing V ent Components
O
After determining which direction the 45
elbow will be used
follow venting instructions accordingly .
Î
• This fireplace comes ready to vent vertically .
• To vent off the unit horizontally, the elbow cover plate
Î
must first be removed from the unit (see Figure 20).
• The elbow can be removed from the unit by aligning the seams of the elbow to the arrows on the surrounding heat shield (see Figure 21).
• Position the elbow in the vertical position. Snap in place with the starting collar .
• Replace the elbow cover plate aligning it with the elbow and secure in place with the 8 screws.
• Place the rope ring around the first section of pipe and slide it up against the cover plate.
NOTE: The rope ring is needed for the heat manage­ment and to prevent cold air infiltration.
ELBOW COVER PLATE
Venting Out Vertically
If the vertical vent component is over 4 feet, you may want to install the flue restrictor (located in the bag containing the install manual) to improve flame appearance. Center the flue restrictor on the 5” flue being used, and with self tapping screws secure the restrictor to the inside of the firebox as shown in Figure 22.
FLUE
RESTRICTOR
Figure 20
HEAT
SHIELD
ARROWS
ELBOW
ELBOW
SEAM
Figure 22
1. Attach the First Vent Component to the Starting Collars
To attach the first vent component to the starting collars of the fireplace:
• Slide the first vent section onto the unit and push in until they snap lock in position.
• Rotate this section to the desired position.
• Using the two tabs provided on the elbow cover plate, secure the first section of venting to the fireplace with two screws.
Refer to Cinch Pipe and Termination Cap installation instructions.
If the installation is for a termination cap attached directly to the fireplace, skip to the sections, Install Firestops and Vent Termination.
FRONT VIEW
Figure 21
TOP VIEW
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
29
Page 30
2. Continue Adding V ent Component s
Refer to Cinch Pipe and Termination Cap installation in­structions.
• Continue adding vent components, locking each succeed­ing component into place.
• Ensure that each succeeding vent component is secure­ly fitted and locked into the preceding component in the vent system. Securing pipe sections with a maximum of two screws is recommended.
• 90° elbows may be installed and rotated to any point around the preceding component’s vertical axis. If an el­bow does not end up in a locked position with the pre-
ceding component, attach with a minimum of two (2) sheet metal screws.
HEAT SHIELD
INTERIOR
FIRESTOP
TRIM HEAT SHIELD IF TOO LONG , ADD TO SHIELD IF TOO SHORT
EXTERIOR FIRESTOP
3. Install Support Brackets
Refer to Cinch Pipe and Termination Cap installation in­structions.
4. Install Firestops
For Horizontal Runs - Firestops are REQUIRED on both
sides of a combustible wall through which the vent passes.
NOTE: Model DVP-TRAP does not need an exterior firestop on an exterior combustible wall. The firestop is built into the cap.
T o install firestops for horizont al runs that pass through either interior or exterior walls:
• Cut a 10” x 12” (254mm X 305mm) hole through the wall.
NOTE: The center of the hole is one (1) inch (25.4mm) above the center of the horizontal vent pipe.
• Position the firestops on both sides of the hole previ-
ously cut and secure the firestops with nails or screws.
• The heat shields of the firestops MUST BE placed to-
wards the top of the hole.
• Continue the vent run through the firestops.
Figure 24. Heat Shield, Interior & Exterior Firestops
For Vertical Runs - One ceiling firestop is REQUIRED at
the hole in each ceiling through which the vent passes. T o install firestops for vertical runs that pass through ceilings:
• Position a plumb bob directly over the center of the verti­cal vent component.
• Mark the ceiling to establish the centerpoint of the vent.
• Drill a hole or drive a nail through this centerpoint.
• Check the floor above for any obstructions, such as wir­ing or plumbing runs.
• Reposition the fireplace and vent system, if necessary, to accommodate the ceiling joists and/or obstructions.
• Cut an 10-inch X 10-inch (254mm x 254mm) hole through the ceiling, using the centerpoint previously marked.
• Frame the hole with framing lumber the same size as the ceiling joists.
NOTE: There must be NO INSULA TION or other combustibles inside the framed firestop opening.
10"
INTERIOR
WALL SHIELD
Figure 23. 10" x 12" Hole and Vent Pipe
30
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
12"
10" (254mm) 10" (254mm)
CHIMNEY HOLE
EXISTING CEILING JOISTS
CEILING
NEW FRAMING MEMBERS
Figure 25 Hole & New Framing Members
Page 31
If the area above the ceiling is NOT an attic, position and secure the ceiling firestop on the ceiling side of the previously cut and framed hole.
JOIST
CEILING
C. Vent Termination For Horizontal Terminations - To attach and secure the
termination to the last section of horizontal vent refer to the Cinch Pipe and Termination Cap installation instructions.
• Push on and snap lock as described at the beginning of the Installing V ent Components section.
• The termination kit should pass through the wall firestops from the exterior of the building.
• Adjust the termination cap to its final exterior position on the building and interlock the flue sections.
WARNING: THE TERMINA TION CAP MUST BE POSITIONED SO THAT THE ARROW IS
!
POINTING UP .
NAILS (4 REQUIRED)
CEILING FIRESTOP
Figure 26. Ceiling Firestop (Ceiling Side)
If the area above the ceiling IS an attic, position and secure the firestop on top of the previously framed hole.
NOTE: Keep insulation away from the vent pipe at least 1 inch (25mm).
NOTE: There must be NO INSULA TION or other combustibles inside the framed firestop opening.
NAILS (4 REQUIRED)
RAFTER
For trapezoidal cap termination kits:
• Using screws secure the cap to the exterior wall through the flanges in the cap.
WARNING: VENTING TERMINALS SHALL
!
NOT BE RECESSED INTO A W ALL OR SID­ING . VENT TERMINATION CLEARANCES MUST BE FOLLOWED TO AVOID FIRE DANGER. SEE VENT TERMINA TION MINIMUM CLEARANCES DI­AGRAM ON FOLLOWING P AGE.
7 1/4"
(184mm)
CEILING
CEILING FIRESTOP
Figure 27. Attic Firestop
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
Figure 28. Trapezoid Termination Cap
31
Page 32
V
M
N
G
v
D
E
v
B
L
v
B
v
F
v
A
B
v
B
v
A
= VENT TERMINAL
V
X
= AIR SUPPLY INLET
A = 12" ....................... clearances above grade, veran-
(See Note 1)
da, porch, deck or balcony
B = 12" ....................... clearances to window or door
that may be opened, or to per­manently closed window.
D* = 18" ....................... vertical clearance to unventilat-
ed soffit or to ventilated soffit lo­cated above the terminal
*36” ...................... for vinyl clad soffits and below
electrical service
F = 9" ........................ clearance to outside corner
G = 6" ......................... clearance to inside corner
H = 3 ft. (Canada) ...... not to be installed above a gas
meter/regulator assembly within
3 feet (90cm) horizontally from the
center-line of the regulator I = 3 ft. (U.S.A.)
6 ft. (Canada) ...... clearance to gas service regu-
lator vent outlet J = 9" (U.S.A.)
12" (Canada) ........ clearance to non-mechanical air
supply inlet to building or the
combustion air inlet to any other
appliance
R
H
U.S.
(3 FT)
M
I
v
X
J or K
P
Q
(See Note 2)
S
Electrical
V
V
T
Service
D*
V
S
= AREA WHERE TERMINAL IS NOT PERMITTED
K = 3 ft. (U.S.A.)
6 ft. (Canada) ......... clearance to a mechanical
air supply inlet
L** = 7 ft. ......................... clearance above paved
(See Note 1)
sidewalk or a paved driveway located on
public property
M*** = 18" ......................... clearance under veranda,
porch, deck, balcony or over­hang
36” ......................... vinyl
N = 6” ........................... non-vinyl sidewalls
12” ......................... vinyl sidewalls
P = 8 ft.
Q
______________________________________________________________________
1 cap 3 feet 2 x Q
______________________________________________________________________
2 caps 6 feet 1 x Q
______________________________________________________________________
3 caps 9 feet 2/3 x Q
______________________________________________________________________
MIN
4 caps 12 feet 1/2 x Q
Q
= # termination caps x 3 R
MIN
= (2 / # termination caps) x Q
MAX
R
MAX
ACTUAL
ACTUAL
ACTUAL
ACTUAL
ACTUAL
S = 6" .......................... clearance from sides of elec-
(See Note 5)
trical service
T = 12" ......................... clearance above electrical
(See Note 5)
service
** a vent shall not terminate directly above a sidewalk or paved
driveway which is located between two single family dwellings and serves both dwellings.
*** only permitted if veranda, porch, deck or balcony is fully open on
a minimum of 2 sides beneath the floor, or meets Note 2.
NOTE 1: On private property where termination is less than 7 feet above a sidewalk, driveway, deck, porch, veranda or balcony, use of a listed cap shield is suggested.
NOTE 2: Termination in an alcove space (spaces open only on one side and with an overhang) are permitted with the dimensions specified for vinyl or non-vinyl siding and soffits. 1. There must be 3 feet minimum between termination caps. 2. All mechanical air intakes within 10 feet of a termination cap must be a minimum of 3 feet below the termination cap. 3. All gravity air intakes within 3 feet of a termination cap must be a minimum of 1 foot below the termination cap.
Figure 29. Vent Termination Minimum Clearances
NOTE 3: Local codes or regulations may require different
clearances. NOTE 4: T ermination caps may be hot. Consider their proximity to
doors or other traffic areas. NOTE 5: Location of the vent termination must not interfere with
access to the electrical service. WARNING: In the U.S: V ent system termination is NOT permitted
in screened porches. You must follow side wall, overhang and ground clearances as stated in the instructions.
In Canada: Vent system termination is NOT permitted in screened porches. Vent system termination is permitted in porch areas with two or more sides open. You must follow all side walls, overhang and ground clearances as stated in the instructions.
Heat & Glo assumes no responsibility for the improper perfor­mance of the fireplace when the venting system does not meet these requirements.
CAUTION: IF EXTERIOR WALLS ARE FINISHED WITH VINYL SIDING, IT IS SUGGESTED THAT A VINYL PROTECTOR KIT BE INSTALLED.
32
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
Page 33
For Vertical Terminations - T o locate the vent and install
V
the vent sections:
• Locate and mark the vent centerpoint on the underside of the roof, and drive a nail through the centerpoint.
• Make the outline of the roof hole around the centerpoint nail.
• The size of the roof hole framing dimensions depend on the pitch of the roof. There MUST BE a 1-inch (25.4mm) clear­ance from the vertical vent pipe to combustible materials.
• Mark the roof hole accordingly .
T o seal the roof hole, and to divert rain and snow from the vent system:
• Attach a flashing to the roof using nails, and use a non­hardening mastic around the edges of the flashing base where it meets the roof.
• Attach a storm collar over the flashing joint to form a water-tight seal. Place non-hardening mastic around the joint, between the storm collar and the vertical pipe.
• Slide the termination cap over the end of the vent pipe and snap into place.
• Cover the opening of the installed vent pipes.
• Cut and frame the roof hole.
• Use framing lumber the same size as the roof rafters and install the frame securely . Flashing anchored to the frame must withstand heavy winds.
• Continue to install concentric vent sections up through the roof hole (for inside vent installations) or up past the roof line until you reach the appropriate distance above the roof (for outside terminations).
WARNING: MAJOR U.S. BUILDING CODES
!
SPECIFY MINIMUM CHIMNEY AND/OR VENT HEIGHT ABOVE THE ROOF TOP. THESE MIN­IMUM HEIGHTS ARE NECESSARY IN THE INTER­EST OF SAFETY . SEE THE FOLLOWING DIAGRAM FOR MINIMUM HEIGHTS, PROVIDED THE TERMI­NA TION CAP IS A T LEAST 20 INCHES FROM A VER­TICAL W ALL AND 2-FEET BELOW A HORIZONT AL OVERHANG.
NOTE: This also pertains to vertical vent systems in­stalled on the outside of the building.
2 FT.
MIN.
TERMINATION
CAP
20 INCH MIN.
LOWEST
DISCHARGE
OPENING
12
H (MIN.) - MIN IMUM HEIGHT FROM ROOF TO LOWEST DISCHARGE OPENING
Roof Pitch H (min.) ft.
flat to 6/12 1.0 over 6/12 to 7/12 1.25 over 7/12 to 8/12 1.5 over 8/12 to 9/12 2.0 over 9/12 to 10/12 2.5 over 10/12 to 1 1/12 3.25 over 1 1/12 to 12/12 4.0 over 12/12 to 14/12 5 .0 over 14/12 to 16/12 6 .0 over 16/12 to 18/12 7 .0 over 18/12 to 20/12 7 .5 over 20/12 to 21/12 8 .0
HORIZONTAL
OVERHANG
ERTICAL
WALL
X
ROOF PITCH
IS X/ 12
Figure 30. Minimum Height from Roof to Lowest Discharge Opening
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
33
Page 34
Step 4. Positioning, Leveling, and Securing the Fireplace
The diagram below shows how to properly position, level, and secure the fireplace.
Step 5. The Gas Control System
WARNING: THIS UNIT IS NOT FOR USE WITH
!
SOLID FUEL.
NAILING
TABS
(BOTH SIDES)
IPI PILOT
FLAME
SENSOR
ROD
Figure 32. Gas Control System
Intermittent Pilot Ignition (IPI) System
This system includes a 3V control valve, electronic module and intermittent pilot.
WARNING: CONTINUOUS 110-120 VAC
!
SERVICE MUST BE WIRED DIRECTLY TO
THE FIREPLACE JUNCTION BOX IN A IPI SYSTEM.
Figure 31. Proper Positioning, Leveling, and Securing of a Fireplace
• Place the fireplace into position.
• Level the fireplace from side to side and from front to back.
• Shim the fireplace with non-combustible material, such as sheet metal, as necessary.
• Secure the fireplace to the framing by nailing or screwing.
• Holes are provided in the base pan for securing the unit to the floor.
34
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
Page 35
Step 6. The Gas Supply Line
NOTE: Have the gas supply line installed in accordance with local building codes by a qualified installer approved and/or licensed as required by the locality . (In the Commonwealth of Massachusetts installation must be performed by a licensed plumber or gas fitter).
NOTE: Before the first firing of the fireplace, the gas supply line should be purged of any trapped air.
NOTE: Consult local building codes to properly size the gas supply line leading to the 1/2 inch (13 mm) hook-up at the unit.
This gas fireplace is designed to accept a 1/2 inch (13 mm) gas supply line. To install the gas supply line:
• A listed (and Commonwealth of Massachusetts approved) 1/2 inch (13mm) tee-handle manual shut-off valve and a listed flexible gas connector are connected to the 1/2 inch (13mm) inlet of the control valve. NOTE: If substi­tuting for these components, please consult local codes for compliance.
• Locate the gas line access hole in the outer casing of the fireplace.
• The gas line may be run from either side of the fireplace provided the hole in the outer wrap does not exceed 2” in diameter and it does not penetrate the actual firebox.
• Open the fireplace lower grille, insert the gas supply line through the gas line hole, and connect it to the shut-off valve.
• When attaching the pipe, support the control so that the lines are not bent or torn.
• After the gas line installation is complete, all connec­tions must be tightened and checked for leaks with a commercially-available, non-corrosive leak check solu­tion. Be sure to rinse off all leak check solution following testing.
WARNING: DO NOT USE AN OPEN FLAME
!
TO CHECK FOR GAS LEAKS.
• Insert insulation from the outside of the fireplace and pack the insulation tightly to totally seal between the pipe and the outer casing.
• At the gas line access hole the gap between the supply piping and gas access hole can be plugged with non­combustible insulation to prevent cold air infiltration.
USE A WRENCH ON SHUT-OFF VALVE WHEN TIGHTENING GAS LINE.
MANUAL
SHUT-OFF
VALVE
FLEX CONNECTOR
GAS VALVE
GAS LINE
ACCESS
CONTROL VALVE
Figure 33. Gas Supply Line
Step 7. Gas Pressure Requirements
Pressure requirements for Heat & Glo gas fireplaces are shown in the table below .
Pressure Natural Gas Propane
Minimum 5.0 inches 11.0 inches Inlet Pressure w.c. w.c.
Maximum Inlet 14.0 inches 14.0 inches Gas Pressure w.c. w.c.
Manifold 3.5 inches 10.0 inches Pressure w.c. w.c.
A one-eighth (1/8) inch (3 mm) N.P.T. plugged tapping is provided on the inlet and outlet side of the gas control for a test gauge connection to measure the manifold pressure.
The fireplace and its individual shut-off valve must be disconnected from the gas supply piping system during any pressure testing of the system at test pressures in excess of one-half (1/2) psig (3.5 kPa).
The fireplace must be isolated from the gas supply piping system by closing its individual shut-off valve during any pressure testing of the gas supply piping system at test pressures equal to or less than one-half (1/2) psig (3.5 kPa).
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
35
Page 36
PLUG-IN
3V TRANSFORMER
ON/OFF
WALL SWITCH
VALVE
NEUTRAL
IGNITION MODULE
(3V)
LOW VOLTAGE
GROUND
FLAME SPARKER/
SENSOR
SEE NOTE 1
REMOTE CONTROL
HOT
ELECTRONI C EMB ERS
BULB SOCKET ASSEMBLY (3)
BLK
IGNITION MODULE 3 VAC
BLK
WHT
WHT
BLK
WHT
BRN
SCALE 1/1
TERMINAL BLOCK
I
S
GROUND TO FIREPLACE CHASSIS
BRN
WHT
ORG
INTERMITTENT PILOT IGNITOR
ORG
GRN
Note: An alternate electronic ember
switch can be installed on the wall by connecting a minimum 18 gage Romexto the leads supplied on the back of the electric ember switch.
BLACK WIRE CAN BE
PLUGG ED IN TO ANY OF
#1 - #5 LOCATIONS ON THE HOT SIDE
BLK
Figure 34. Intermittent Pilot Ignition
(IPI) Wiring Diagram
Step 8. Wiring the Fireplace
NOTE: Electrical wiring must be installed by a licensed electrician.
CAUTION: DISCONNECT REMOTE CONTROLS IF AB­SENT FOR EXTENDED TIME PERIODS. THIS WILL PRE­VENT ACCIDENT AL FIREPLACE OPERA TION.
For Intermittent Pilot Ignition Wiring
Appliance Requirements
This appliance requires that 1 10-120 VAC be wired to the junction box. Maintain correct polarity when wiring the junc­tion box.
FLAME ON/OFF
3 VAC
VALVE
LCOR & RCOR JUNCTION BOX
WHT
WHITE WI RE CAN BE PLUGGED INTO ANY OF #1 - #5 LOCATIONS ON THE NEUTRAL SIDE
PLUG IN
TRANSFORMER
Operation using Battery Power
This fireplace has an optional battery operation. The sys­tem is fully functional with the use of two “D” size batteries without ordinary 1 10-120 V AC power.
Wiring to the battery pack should be left disconnected in order to conserve battery life. In the case of a loss of power, simply connect red and black wire leads to activate battery power (connect red to red, black to black). The fireplace can be used as necessary . Once power (110 VAC) is restored, disconnect red and black wire leads to extend battery life.
W ARNING
Wire 110V to electrical junction box. Do NOT wire 1 10V to valve. Do NOT wire 110V to wall switch.
• Incorrect wiring will damage millivolt valves.
• Uninterrupted or continuous power is required at all times in IPI system
• Incorrect wiring will override IPI safety lockout and may cause explosion.
36
EXCEPT when using battery back-up.
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
Page 37
TEMPERATURE
SENSOR SWITCH
SPEED CONTROL
(RHEOSTAT)
Figure 35. Fan Wiring Diagram
FAN
JUNCTION
BOX
SEE DETAIL A
NOTE: If any of the original wire as supplied with the appliance must be replaced, it must be replaced with the type 105oC rated wire.
DETAIL A
SCALE 1/1
Optional Accessories
Optional fan and remote control kits require that 110-120 VAC be wired to the factory installed junction box before the fireplace is permanently installed.
Fan Installation
Recommended fan locations for the type of fireplace you have (see Figures 36 and 37).
Wall Switch
Position the wall switch in the desired position on a wall. Run a maximum of 25 feet (7.8 m) or less length of 18 A.W .G . minimum wire and connect it to the fireplace ON/OFF switch pigtails.
CAUTION: LABEL ALL WIRES PRIOR TO DISCONNEC­TION WHEN SERVICING CONTROLS. WIRING ERRORS CAN CAUSE IMPROPER AND DANGEROUS OPERA TION. VERIFY PROPER OPERATION AFTER SERVICING.
FAN
Figure 36. Corner fan location
Corner fan location
It is recommended to position the fan in this location as shown. This will provide the best air flow (see Figure 36).
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
FAN
Figure 37. ST & PIER fan location
ST & Pier fan location
It is recommended to position the fan on the same side of the fireplace as the vent collars are on. This will provide the best air flow (see Figure 37).
37
Page 38
Step 9. Finishing
Figures 38 and 39 show the minimum vertical and corresponding maximum horizontal dimensions of fireplace mantels or other combustible projections above the top front edge of the fireplace. See Figures 4 and 5 for other fireplace clearances. Only non-combustible
materials may be used to cover the black fireplace front.
WARNING: WHEN FINISHING THE FIREPLACE, NEVER
!
OBSTRUCT OR MODIFY THE AIR INLET/OUTLET GRILLES IN ANY MANNER.
MANTEL
8”
7”
6”
5”
4”
3”
2”
1”
6”
5”
HOOD
10”
9”
8”
7”
*
12”
11”
10”
9”
16”
15”
14”
13”
12”
11”
NOTE: 12” mantel at 16” above hood.
Mantel dimensions shown are
*
for standard hood on models:
PIER-HVB-IPI, LCOR-HVB­IPI, and RCOR-HVB-IPI.
To use mantel dimensions
*
shown the fireplace must have the standard hood replaced with a larger hood (060-143) on model: ST-HVB-IPI.
CAUTION: IF JOINTS BETWEEN THE FIN­ISHED WALLS AND THE FIREPLACE SUR­ROUND (TOP AND SIDES) ARE SEALED, A 300° F. MINIMUM SEALANT MATERIAL MUST BE USED. THESE JOINTS ARE NOT REQUIRED TO BE SEALED. ONLY NON­COMBUSTIBLE MATERIAL (USING 300° F. MINIMUM ADHESIVE, IF NEEDED) CAN BE APPLIED AS FACING TO THE FIREPLACE SURROUND. SEE THE DIAGRAM BELOW .
NOTE: Sheetrock or other combustible material such as wood can be placed on the top edge and sides of the fireplace.
ST-HVB-IPI
TOP EDGE
SIDE EDGE
0” GAP
PIER- HVB-IPI and L&RCOR- HVB-IPI
TOP EDGE
SIDE EDGE
Figure 38.
Minimum Vertical and Maximum Horizontal Dimensions of Combustibles above Fireplace
MANTEL
7”
6”
5”
4”
3”
2”
1”
17”
16”
15”
14”
13”
12”
HOOD
*
12”
11”
10”
9”
8”
21”
20”
19”
18”
Mantel dimensions shown are
*
for standard hood on model:
ST-HVB-IPI
23”
22”
NOTE: 12” mantel at 23” above hood.
0” GAP
Figure 40. Sealant Material
Hearth Extensions
A hearth extension may be desirable for aesthetic reasons. However, ANSI or CAN/CGA testing standards do not require hearth extensions for gas fireplace appliances.
HOOD CLIP
Figure 39.
38
Minimum Vertical and Maximum Horizontal Dimensions of Combustibles above Fireplace
Figure 41. Hood Clip
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
Page 39
Step 10. Installing T rim, Logs & Ember Material
Installing the Trim
Combustible materials may be brought up to the specified clearances on the side and top front edges of the fireplace, but MUST NEVER overlap onto the front face. The joints between the finished wall and the fireplace top and sides can only be sealed with a 300° F . (149° C) minimum sealant.
WARNING: WHEN FINISHING THE FIREPLACE,
!
NEVER OBSTRUCT OR MODIFY THE AIR INLET/ OUTLET GRILLES IN ANY MANNER.
Install optional marble and brass trim surround kits as desired. Marble, brass, brick, tile, or other non-combustible materials can be used to cover up the gap between combustible material (sheetrock or wood) and the fireplace.
Do not obstruct or modify the air inlet/outlet grilles. When overlapping on both sides, leave enough space so that the bottom grille can be lowered and the trim door removed.
Positioning the Logs
If the gas logs have been factory installed they should not need to be positioned. If the logs have been packaged separately, refer to the instructions that accompany the logs. Save the log instructions with this manual.
If sooting occurs, the logs might need to be repositioned slightly to avoid excessive flame impingement.
Glass Specifications Model Type
PIER-HVB-IPI TEMPERED ST-HVB-IPI TEMPERED L&RCOR-HVB-IPI TEMPERED
Heat & Glo fireplaces manufactured with tempered glass may be installed in hazardous locations such as bathtub enclosures as defined by the CPSC. The tempered glass has been tested and certified to the requirements of ANSI Z97.1-1984 and CPSC 16 CFR 1202. (Safety Glazing Certi­fication Council SGCC # 1595 and 1597. Architectural T est­ing, Inc. Reports 02-31919.01 and 02-31917.01.)
This statement is in compliance with CPSC 16 CFR Sec­tion 1201.5 “Certification and labeling requirements” which refers to 15 USC 2063 stating “…Such certificate shall ac­company the product or shall otherwise be furnished to any distributor or retailer to whom the product is delivered.”
Some local building codes require the use of tempered glass with permanent marking in such locations. Glass meeting this requirement is available from the factory . Please con­tact your dealer or distributor to order .
Shutter Settings
___________________________________________
PIER-HVB-IPI 3/8” FULL OPEN
___________________________________________
ST-HVB-IPI 3/8” FULL OPEN
___________________________________________
NG LP
L&RCOR-HVB-IPI 3/8” FULL OPEN
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
39
Page 40
Placing the Ember Material
Ember material is shipped with this gas fireplace. The bag labeled Glowing Ember (050-721) is standard glowing em­ber material.
Optional Ember Light Kit (Emberkit-MS) Ember Light Bulb Replacement
In the lower gas valve compartment you will find three ac­cess panels for the three light bulbs (see Figure 43).
T o place the ember material:
• Remove the wing nuts and glass clips or tension springs around the glass door.
• Remove the glass door from the unit.
• Remove the grate and log set by removing the screws.
• Place dime size pieces of ember material about 1/2 inch apart near port holes in burner top. Do NOT press em­bers into burner ports. Cover the top of the burner with a single layer of ember material.
• Save the remaining ember materials for use during fire­place servicing. The bag of embers provided is sufficient for 3 to 5 applications.
• Replace the glass door and a front trim door on the unit.
ACCESS PANEL
Figure 43.
Using a 5/16” nut driver remove the two bolts (see Figure 44).
ACCESS PANEL
Figure 42 Placement of the Ember Material
Figure 44
Pull the access panel to expose the light bulb. Wearing clean cotton gloves replace the bulb. Any skin oils which get on a new bulb will greatly shorten the life of the bulb. The bulb can be cleaned with isopropyl alcohol (see Figure 45).
Figure 45.
40
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
Page 41
Step 1 1. Before Lighting the Fireplace
Before lighting the fireplace, be sure to do the following:
• Remove the rubber bands from the log set (see Figure
46).
RUBBER
BANDS
A small amount of air will be in the gas supply lines. When first lighting the fireplace, it will take a few minutes for the lines to purge themselves of this air. Once the purging is complete, the fireplace will light and will operate normally .
Subsequent lightings of the fireplace will not require this purging of air from the gas supply lines, unless the gas valve has been turned to the OFF position, in which case the air would have to be purged.
NOTE: The fireplace should be run 3 to 4 hours on the initial start-up. T urn it off and let it cool completely . Remove and clean the glass. Replace the glass and run the fireplace for an additional 8 hours. This will help to cure the products used in the paint and logs.
FOAM
PADS
Figure 46.
• Remove the two foam pads which support the log set and grate and allow the log set and grate to rest on the base pan.
• Install the Lava Rock (supplied) to the firebox base pan being careful not to cover the burner with the Lava Rock.
Remove all paperwork from underneath the fireplace. Review safety warnings and cautions
• Read the Safety and Warning Information section at the beginning of this Installers Guide.
Double-check for gas leaks
Before lighting the fireplace, double-check the unit for
possible gas leaks.
Double-check vent terminations and front grilles for obstructions.
• Before lighting the fireplace, double-check the unit for possible obstructions that could be blocking the vent ter­minations or the front grilles.
Double-check for faulty components
• Any component that is found to be faulty MUST BE re­placed with an approved component. T ampering with the fireplace components is DANGEROUS and voids all war­ranties.
During this break-in period it is recommended that some windows in the house be opened for air circulation. This will help avoid setting off smoke detectors, and help eliminate any odors associated with the fireplace’s initial burning.
Step 12. Lighting the Fireplace
You’ve reviewed all safety warnings, you’ve checked the fireplace for gas leaks, you know the vent system is unobstructed, and you’ve checked for faulty components. Now you’re ready to light the fireplace.
WARNING: PLEASE REFER TO THE USER’S
!
MANUAL FOR ALL CAUTIONS, SAFETY , AND WARNING INFORMATION PERTAINING TO THE LIGHTING AND OPERA TION OF THE FIREPLACE.
After the Installation
LEA VE THIS INSTALLATION MANUAL WITH
!
THE APPLIANCE FOR FUTURE REFERENCE.
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
41
Page 42
Maintaining and Servicing Your Fireplace
4
Fireplace Maintenance
Although the frequency of your fireplace servicing and main­tenance will depend on use and the type of installation, you should have a qualified service technician perform an appli­ance check-up at the beginning of each heating season. See the table below for specific guidelines regarding each fireplace maintenance task.
IMPORT ANT : TURN OFF THE GAS BEFORE SERVICING YOUR FIREPLACE.
Replacing old ember material Frequency: Once annually , during the checkup. By: Qualified service technician. Task: Brush away loose ember material near the burner.
Replace old ember material with new dime-size and shape pieces of Golden Ember (GE-93) and Glowing Ember (050-
721). New ember material should be placed alternately on top of the burner - a layer of Golden Ember, a layer of Glowing Ember, and so on. Save the remaining ember material and repeat this procedure at your next servicing. For more information, see Placing Ember Material.
Cleaning Burner and Controls Frequency: Once annually . By: Qualified service technician. Task: Brush or vacuum the control compartment, fireplace
logs and burner areas surrounding the logs.
Cleaning Flame Sensor Rod (IPI Systems) Frequency: Periodically . By: Qualified service technician. Task: Make a visual check of the straight flame sensor rod.
Use emery cloth to carefully remove any existing white film or deposits.
Checking Flame Patterns, Flame Height Frequency: Periodically .
By: Qualified service technician/Home owner. T ask: Make a visual check of your fireplace’ s flame patterns.
Make sure the flames are steady - not lifting or floating. See Figure 47. The flame sensor (IPI) tips should be covered with flame. See Figure 32.
MAKE SURE THE FLAMES ARE STEADY—NOT LIFTING OR FLOATING.
Figure 47. Burner Flame Patterns
Checking Vent System Frequency: Before initial use and at least annually
thereafter, more frequently if possible.
By: Qualified service technician/Home owner. Task: Inspect the external vent cap on a regular basis to
ensure that no debris is interfering with the flow of air. Inspect entire vent system for proper function.
Cleaning Glass Door Frequency: After the first 3 to 4 hours of use. As neces-
sary after initial cleaning.
By: Home owner. Task: Remove and clean glass after the first 3 to 4 hours of
use. Af ter the initial cleaning, clean as necessary , particu­larly after adding new ember (flame colorant) material. Film deposits on the inside of the glass door should be cleaned off using a household glass cleaner . NOTE: DO NOT handle
or attempt to clean the door when it is hot and DO NOT use abrasive cleaners.
42
Heat & Glo • PIER-HVB-IPI, ST-HVB-IPI, LCOR-HVB-IPI, RCOR-HVB-IPI • 2006-900 Rev . M• 8/06
Loading...