Havis-Shields DS-PAN-103 User Manual

5
5
5
5
5
6
6
6
6
6
8
8
8
8
8
8
7
7
7
7
7
7
6
5
4
4
4
4
4
4
3
3
3
3
3
3
2
2
2
2
2
2
1
1
1
1
1
1
INSTALLATION INSTRUCTIONS:
1. REMOVE THE 1/4-20 X 5/8" BHCS HOLDING THE MOUNTING BRACKET TO THE REST OF THE DOCKING STATION (THE SCREWS IN THE PLASTIC SIDE-MEMBERS ON EACH SIDE OF THE DOCK).
D
D
D
D
D
D
PULL MOUNTING BRACKET OFF OF DOCKING STATION.
2. SET MOUNTING BRACKET ON TOP OF DESIRED SURFACE SO THAT 3 OF THE HOLES ON THE MOUNTING BRACKET LINE UP WITH 3 TAPPED HOLES OF THE MOTION ACCESSORY. (IF 3 HOLES ARE NOT AVAILABLE THEN USE 2.) SEE *RECOMMENDED HOLES* OF THE MOUNTING BRACKET.
3. FASTEN THE MOUNTING BRACKET TO THE MOTION ACCESSORY USING (3X) 1/4-20 X 5/8" BHCS (OR 2 DEPENDING ON AVAILABILITY).
4. PLACE DOCKING STATION OVER TOP OF MOUNTING BRACKET SO THAT THE 2 THREADED HOLES IN EACH FLANGE OF THE MOUNTING BRACKET LINE UP WITH THE 2 HOLES IN EACH PLASTIC SIDE-MEMBER.
5. FASTEN THE DOCKING STATION BACK TO THE MOUNTING
C
C
C
C
C
C
BRACKET USING (4X) 1/4-20 X 5/8" BHCS.
D
D
D
D
D
D
C
C
C
C
C
C
(3X) 1/4-20 X 5/8" BHCS
(
120 +/-10% IN-LBS
DOCK DOWN IF POSSIBLE*
B
B
B
B
B
B
*
RECOMMENDED HOLES
FOR MOUNTING WITH
)
2 SCREWS*
(MOUNTING BRACKET OF
DOCKING STATION)
(4X) 1/4-20 X 5/8" BHCS (
120 +/-10% IN-LBS
)
HARDWARE KIT CONTENTS:
6. TIGHTEN ALL FASTENERS TO THE INDICATED TORQUE RECOMMENDATIONS.
B
B
B
B
B
B
*RECOMMENDED HOLES
A
A
A
A
A
A
DRAWING NUMBER:
DRAWING NUMBER:
D3-0036-IS-G
(SHEET 1 OF 2)
8
8
8
8
8
8
FOR MOUNTING WITH
3 SCREWS*
WARNING: ALL HAVIS INC. PRODUCTS ARE DESIGNED WITH SAFETY OF USE AND INSTALLATION IN MIND. HOWEVER, IT IS THE SOLE RESPONSIBILITY OF THE OWNER/OPERATOR OF A VEHICLE USING HAVIS INC. MOUNTING AND DOCKING EQUIPMENT, TO INSURE THAT THE EQUIPMENT IS INSTALLED SO THAT IT WILL NOT INTERFERE WITH VEHICLE OPERATION, INTERFERE WITH SAFETY DEVICES, OBSTRUCT VIEW OF DRIVING CONDITIONS, OR IN ANY WAY DEGRADE OCCUPANT SAFETY. IMPROPER INSTALLATION CAN CAUSE SERIOUS INJURY IN THE EVENT OF AN ACCIDENT. INSTALLATION SHOULD ONLY BE PERFORMED BY QUALIFIED PROFESSIONALS. COMPUTERS AND MOTION DEVICES MUST BE MOVED TO AND STOWED/SECURED IN THEIR SAFE DRIVING POSITIONS BEFORE OPERATING VEHICLE.
7
7
7
7
7
7
DATE
DATE
DATE
DATE
DATE
PRODUCT I.D.
PRODUCT I.D.
PRODUCT I.D.
PRODUCT I.D.
PRODUCT I.D.
PRODUCT I.D.
DS-PAN-101
PRODUCT NAME
PRODUCT NAME
DS-PAN-101
PRODUCT DESCRIPTION
THIS PRODUCT IS USED WITH THE PANASONIC CF-28/29/30 TOUGHBOOK COMPUTERS
(THE FEATURES OF THIS PRODUCT MAY BE LIMITED DEPENDING UPON THE MODEL OF COMPUTER USED.)
6
6
6
6
6
6
5
5
5
5
5
5
4
4
4
4
4
4
3
3
3
3
3
3
2
2
2
2
2
2
DOCKING STATION
1-800-524-9900
WWW.HAVIS.COM
DATE
01-30-07
WEIGHT: (LBS)
WEIGHT: (LBS)
WEIGHT: (LBS)
WEIGHT: (LBS)
WEIGHT: (LBS)
6.6
REV. DATE
REV. DATE
12-07-09
1
1
1
1
1
1
F-730-019 REV A
A
A
A
A
A
A
5
5
5
5
5
6
6
6
6
6
8
8
8
8
8
8
7
7
7
7
7
7
6
5
4
4
4
4
4
4
3
3
3
3
3
3
2
2
2
2
2
2
1
1
1
1
1
1
INSTALLATION INSTRUCTIONS:
STRAIN RELIEF
LOCATIONS
D
D
D
D
D
D
NOTE: IT IS VERY IMPORTANT TO STRAIN RELIEF ALL CABLES CONNECTED TO THE DOCKING STATION.
1. IF IT IS NECESSARY TO STRAIN-RELIEVE WIRES/CABLES, INSERT
D
D
D
D
D
D
ZIP TIE/PUSH PIN FROM HARDWARE KIT INTO ANY OF THE THREE STRAIN RELIEF HOLES ON THE BOTTOM SIDE OF THE DOCK, AS SHOWN. LOOP AND TIGHTEN ZIP TIE AROUND WIRES/CABLES, AS REQUIRED.
2. IF STRAIN RELIEF MUST BE REMOVED AFTER INSTALLATION, CUT ZIP TIE PORTION WHERE INDICATED IN ILLUSTRATION A. TO RE-USE PUSH PIN FOR STRAIN RELIEF, INSERT A ZIP TIE THROUGH OPENING IN PUSH PIN AND LOOP AROUND WIRES/CABLES, AS REQUIRED.
NOTE: IF ORDERING AN EXTRA SET OF KEYS, REFER TO THE KEY CODE NUMBER STAMPED ON THE KEYS. IF KEYS ARE NOT AVAILABLE, PLEASE HAVE SERIAL NUMBER OF DOCK AVAILABLE BEFORE CONTACTING HAVIS.
C
C
C
C
C
C
C
C
C
C
C
C
*ADDITIONAL MOUNTING COMPONENT,
MOTION DEVICE, OR TUBE (NOT SHOWN)
B
B
B
B
B
B
A
A
A
A
A
A
DRAWING NUMBER:
DRAWING NUMBER:
IS MOUNTED ON THIS SURFACE*
D3-0036-IS-G
(SHEET 2 OF 2)
8
8
8
8
8
8
ZIP TIE/PUSH PIN
CUT HERE TO
REMOVE ZIP TIE
ILLUSTRATION A
WARNING: ALL HAVIS INC. PRODUCTS ARE DESIGNED WITH SAFETY OF USE AND INSTALLATION IN MIND. HOWEVER, IT IS THE SOLE RESPONSIBILITY OF THE OWNER/OPERATOR OF A VEHICLE USING HAVIS INC. MOUNTING AND DOCKING EQUIPMENT, TO INSURE THAT THE EQUIPMENT IS INSTALLED SO THAT IT WILL NOT INTERFERE WITH VEHICLE OPERATION, INTERFERE WITH SAFETY DEVICES, OBSTRUCT VIEW OF DRIVING CONDITIONS, OR IN ANY WAY DEGRADE OCCUPANT SAFETY. IMPROPER INSTALLATION CAN CAUSE SERIOUS INJURY IN THE EVENT OF AN ACCIDENT. INSTALLATION SHOULD ONLY BE PERFORMED BY QUALIFIED PROFESSIONALS. COMPUTERS AND MOTION DEVICES MUST BE MOVED TO AND STOWED/SECURED IN THEIR SAFE DRIVING POSITIONS BEFORE OPERATING VEHICLE.
6
6
6
6
6
7
7
7
7
7
7
6
5
5
5
5
5
5
PRODUCT DESCRIPTION
THIS PRODUCT IS USED WITH THE PANASONIC CF-28/29/30 TOUGHBOOK COMPUTERS.
(THE FEATURES OF THIS PRODUCT MAY BE LIMITED DEPENDING UPON THE MODEL OF COMPUTER USED.)
4
4
4
4
4
4
3
3
3
3
3
3
PRODUCT I.D.
PRODUCT I.D.
PRODUCT I.D.
PRODUCT I.D.
PRODUCT I.D.
PRODUCT I.D.
DS-PAN-101
PRODUCT NAME
PRODUCT NAME
DOCKING STATION
2
2
2
2
2
2
DS-PAN-101
1-800-524-9900
WWW.HAVIS.COM
DATE
DATE
DATE
DATE
DATE
DATE
01-30-07
WEIGHT: (LBS)
WEIGHT: (LBS)
WEIGHT: (LBS)
WEIGHT: (LBS)
WEIGHT: (LBS)
WEIGHT: (LBS)
6.6
REV. DATE
REV. DATE
12-07-09
1
1
1
1
1
1
F-730-019 REV A
B
B
B
B
B
B
A
A
A
A
A
A
Loading...