Harken 1634 ESP User Manual

INSTALLATION SHEET
HARKEN
HARKEN
HARKEN
HARKEN
1634 Midrange/Cruising ESP Stand-up Base
N15W24983 Bluemound Road• Pewaukee, WI 53072 U.S.A.
Tel: (262) 691-3320 • Fax: (262) 701-5780
Web: www.harken.com • Email: harken@harken.com
WARNING! Strictly follow all instructions to avoid an accident, damage to your vessel, personal injury or death. See www. harken.com/manuals for additional safety information.
WARNING! To achieve maximum working load of base, mount as shown on reverse side, using 1/4" (6 mm) SS screws, washers and locknuts in all four (4) holes. Maximum working load of block fitted to base is limited to maximum working load of base.
Base Maximum Working Load
Install block on base before mounting base to deck
2. Put base on flat surface and press spring cup down. Insert clevis pin in hole only thickness of first cylinder wall.
3500 lbs (1587 kg)
321
3. Insert block so post hole aligns with clevis pin in base. Push clevis pin in until spring cup snaps in place.
IMPORTANT: Mount base so load is inline with padeye bail
WARNING!: Do not install base so loading is sideways to padeye bail (Diagram 5). Mounting base incorrectly can lead to product failure.
CORRECT INCORRECT
Diagram 5Diagram 4
Padeye
Bail
CORRECT LOAD
Padeye
Bail
INCORRECT LOAD
Maintenance
Harken equipment requires minimal maintenance, but some is required to give the best service and to comply with Harken's limited warranty.
It is important to keep equipment clean by frequently flushing with fresh water. In corrosive atmospheres, stainless parts may show discoloration around holes, rivets and screws. This is not serious and may be removed with a fine abrasive.
IMPORTANT! Exposure to some teak cleaners and other caustic solutions can result in discoloration of part and is not covered under the Harken warranty.
Warranty
For additional safety, maintenance and warranty information see www.harken.com/manuals or the Harken® catalog.
Printed in USA. 4420 4/14
Loading...