OVL-II Series - Standard Reach
OVL-II Series - Dual Installation
OVL-II Series - Dual Installation
INSTALLER
!
CAUTION:
!
WARNING:
!
WARNING:
NOTE: It is common practice to ground electrical hardware such as telephones, computers and other devices to
available water lines. This can, however, cause electrical feedback in the plumbing circuit, which results in an
electrolysis effect occurring in the fountain. This may result in water which has a metallic taste to it or has a
noticeable increase in the metallic content of the water.
Review these instructions before beginning installation. Be sure that installation
conforms to all plumbing, electrical and other applicable codes.
When installation is complete, ensure these instructions are left in the plastic bag
provided inside the installed unit for future reference.
Service to be performed by authorized service personnel only.
When inspecting plumbing circuit, remember the line may be grounded some distance from the installation,
and may occur outside the building or area in which the unit is being installed.
This condition can be avoided (in most cases) by using recommended materials during installation. Any drain
fittings provided by the installer should be made of plastic which will
remainder of the buildings plumbing circuits.
1
electronically isolate the fountain from the
97793C - 10/01
1/4" O.D. TUBE
WATER INLET
TO COOLER
NOTE: WATER FLOW
DIRECTION
Figure 5 Water Supply Connections
OVLERQ*C OVLSRQ*C OVLESRQ*F OVLSERQ*F
3/8" O.D. UNPLATED
COPPER TUBE CONNECT
COLD WATER SUPPLY
BUILDING WATER INLET
SERVICE STOP
(NOT FURNISHED)
Installation Package
The components for installation are packed in three
separate boxes, regardless of the type of unit being
installed. The boxes contain the following:
1.Cut a rectangular wall opening 37-1/2 (953 mm) W x
37-3/4 H (959 mm) and 4-1/2 (114 mm) above the
floor line (see Figure 7). The dimensions are required
to obtain proper rim and bubbler heights for
compliance with ANSI standard A117.1.
2.Reinforce the wall opening on all sides to adequately
support the water fountain. This reinforcement must
support up to 150 lbs. static load and provide a
means for securing the frame assembly in place.
NOTE:Building construction must allow for
adequate air flow on both sides and top of
remote chiller unit a minimum of 4 (102
mm) is required.
3.Install plumbing and electrical rough-ins. A junction
box for a (3) wire, 10 amp branch circuit is provided on
the inside of the chiller. (Standard 120 Volts, 60 Hz,
and single phase.)
Figure 6 OVL-II SER-Q Rough-In
REVERSED CONFIGURATION:
HIGHER UNIT ON THE RIGHT
4.Remove frames and related hardware from
packaging. Release the two shelf rods by cutting
cable ties. Attach the two frames together through the
upright supports with (4) 5/16 x 3/4 (19 mm) long
bolts and nuts (not provided). Tighten securely.