Halsey Taylor OVL-EBP-C Installation Manual

OVL-EBP*C, OVL-SBP*C, OVL-SEBP*F , OVL-ESBP*F
Halsey T aylor Owners Manual
Non-Refrigerated Fountains
OVL-EBP OVL-SBP OVL-SEBP OVL-ESBP
Installer
T o assure you install this model easily and correctly , PLEASE READ THESE SIMPLE INSTRUCTIONS BEFORE ST ARTING THE INST ALLATION. CHECK YOUR INSTALLA TION FOR COMPLIANCE WITH PLUMBING, ELECTRICAL AND OTHER APPLICABLE CODES. After installation, leave these instructions inside the fountain for future reference.
ALL SERVICE TO BE PERFORMED BY AN AUTHORIZED SERVICE PERSON
IMPORTANT! INSTALLER PLEASE NOTE.
THE GROUNDING OF ELECTRICAL EQUIPMENT SUCH AS TELEPHONE, COMPUTERS, ETC. T O WATER LINES IS A COMMON PROCEDURE. THIS GROUNDING MA Y BE IN THE BUILDING OR MA Y OCCUR AW A Y FROM THE BUILDING . THIS GROUNDING CAN CAUSE ELECTRICAL FEEDBACK INTO A FOUNT AIN, CREATING AN ELEC­TROLYSIS WHICH CAUSES A MET ALLIC TASTE OR AN INCREASE IN THE METAL CONTENT OF THE WA TER. THIS CONDITION IS A VOIDABLE BY USING THE PROPER MA TERIALS AS INDICA TED. ANY DRAIN FITTINGS PROVIDED BY THE INST ALLER SHOULD BE MADE OF PLASTIC TO ELECTRICALL Y ISOLA TE THE FOUNT AIN FROM THE BUILDING PLUMBING SYSTEM.
IMPORTANT
1/4" O.D. TUBE WATER INLET TO COOLER
FIG. 1
3/8" O.D. UNPLATED COPPER TUBE CONNECT COLD WATER SUPPL Y
NOTE: WA TER FLOW
DIRECTION
BUILDING WA TER INLET
SERVICE STOP (NOT FURNISHED)
OPERA TION OF QUICK CONNECT FITTINGS
TUBE IS
SECURED
IN POSITION
PUSH IN COLLET
TO RELEASE TUBE
PUSHING TUBE IN BEFORE
PULLING IT OUT HELPS TO
RELEASE TUBE
24 15
FIG. 2
SIMPLY PUSH IN TUBE TO ATTACH
23
FIG. 3 FIG. 4
14
Regulator Mounting Bracket
97638C (Rev. H - 5/08)PAGE 1
OVL-EBP*C, OVL-SBP*C, OVL-SEBP*F , OVL-ESBP*F
OVL - EBP/SBP/SEBP/ESBP COOLER INST ALLA TION
1. Fountains using the MPW Mounting Plate refer to Fig's. 6,8,10, or 12 for hanger bracket
location and rough-in dimensions. NOTE: Review separate installation instructions for details of the MPW Mounting Plate.
Fountains using the Wall Plate Assy. refer to Fig's. 5,7,9, or 1 1 for rough-in dimensions.
2. Shown dimensions pertain to installation location (framing must support up to 150 lbs. weight
for single fountain and 300 lbs. for dual fountains). These dimensions are required for compliance with ANSI S t andard A117.0.
3. Install rough-in plumbing as shown in Fig’s. 5,6,7,8,9,10,11, or 12. Waste line should extend a minimum of 2" (51mm) thru the back panel. Run supply water inlet line thru back panel. Install a service stop (not provided). T urn on supply water and flush thoroughly.
4. Installing back panel. Ftn. w/MPW Mounting Plate: Refer to Fig. 16 for placement of braces onto back panel.
Place the upper edge of the panel above hanger bracket. Slide the panel down until it engages the hanger bracket. Be sure back panel is firmly engaged before releasing it. Ftn. w/Wall Plate Assy.: Place the upper edge of the panel above mounting plate on the wall. Slide the panel down until it engages the hanger . Be sure back panel is firmly engaged before releasing it.
5. Remove bottom access panel from fountain basin and save the screws. Ftn. w/MPW Mounting Plate: Install the fountain to the back panel and wall using (4) 5/16 “ x 6” long threaded rods, washers, and nuts (provided). T ighten securely. Ftn. w/Wall Plate Assy .: Inst all the founrain to the back panel and wall using (4) 5/16" x 3/4" long bolts and washers (provided) thru holes in back panel. W asher used on bottom two (2) holes only . Tighten securely.
6. Cut waste tube to required length using plumbing hardware and trap (not provided) as a guide. Install hardware and trap. T ighten securely.
7. Make water supply connections from service stop to the fountain strainer . Insert the water inlet line into the inlet side of strainer until it reaches a positive stop - about 3/4" (See Fig. 2). Turn on water supply and check for leaks. Newly inst alled water supply line should be insulated after leak check is completed. DO NOT SOLDER TUBES INSERTED
INTO THE STRAINER AS DAMAGE TO THE O-RINGS MAY RESULT.
8. Check stream height from bubbler. Stream height is factory set at 45-50 PSI. If supply
pressure varies greatly from this, adjust the screw on regulator (item 14, on page 1). Clockwise adjustment will raise stream height and counter-clockwise will lower stream height. For best adjustment stream height should be approximately 1-1/2" (38mm) above the bubbler guard. (See Figure 3)
9. Water Valve Mechanism - ADJUSTMENT PROCEDURE:
- Turn adjustment screw (Item 26, page 11) counter-clockwise until water flow from bubbler starts
- Turn adjustment screw clockwise until water flow stops, then turn an additional 1/2 turn
10. Replace bottom access panel to fountain using the screws provided. Tighten securely.
97638C (Rev. H - 5/08) PAGE 2
OVL-EBP*C, OVL-SBP*C, OVL-SEBP*F , OVL-ESBP*F
FINISHED FLOOR
FIG. 5
ROUGH-IN FOR OVL-EBP WITH W ALL PLA TE ASSY .
LEGEND:
A = 1-1/4" O.D. W aste Tube (Trap And Elbow Not Provided)
B = 3/8" O.D. Unplated Copper Tube Connect (Water Inlet)
C = 1/4" (6mm) DIA. Holes For Mounting Plate To Wall
97638C (Rev. H - 5/08)PAGE 3
OVL-EBP*C, OVL-SBP*C, OVL-SEBP*F , OVL-ESBP*F
MPW100 MTG . PL T .
REF . SEP ARA TE INST ALLA TION
INSTRUCTIONS FOR DETAILS
5/8"
16mm
18"
457mm
FINISHED WALL
FINISHED FLOOR
7"
179mm
27"
ADA
685mm
FIG. 6
REQUIREMENT
28 1/2"
724mm
1 7/8"
47mm
ROUGH-IN FOR OVL-EBP WITH MPW100 MOUNTING PLA TE
16"
406mm
8"
203mm
BACK PANEL
"A"
1/2"
13mm
"B"
27 1/2"
698mm
8"
203mm
"C"
MPW100
HANGER
BRACKET
97638C (Rev. H - 5/08) PAGE 4
MTG. PLT.
43 7/8"
1114mm
LEGEND:
A = 1-1/4" O.D. W aste Tube (Trap And Elbow Not Provided)
B = 3/8" O.D. Unplated Copper Tube Connect (Water Inlet)
C = 3/8" (10mm) DIA. Slots For Mounting Hanger Bracket To Wall
Loading...
+ 8 hidden pages