Halsey Taylor MF100 Owners Manual

SINGLE-STATION MOUNTING FRAME INSTRUCTIONS
ACTUAL FRAME MAY VARY FROM THE ONE ILLUSTRATED. PLEASE REFER TO THE INSTALLATION/OWNERS MANUAL OF THE SPECIFIC UNIT FOR ADDITIONAL INFORMATION.
FRAME
5/16" SCREWS OR BOLTS (10 REQ'D-NOT PROVIDED)
(P/N 101567443730
- PROVIDED)
SCREWS OR BOLTS (NOT PROVIDED)
MF100
37 3/4"
(959mm)
4 1/2"
(114mm)
IMPORTANT: DOUBLE STUD OR 3 INCHES (76mm) BETWEEN MOUNTING FRAMES IF PLACED NEXT TO A BOTTLE FILLER UNIT
WOOD OR STEEL FRAME SHOWN (NOT PROVIDED)
1 1/8" (29mm)
ELECTRICAL INLET LOCATION ON CHILLER
8"
(203mm)
TO FLOOR LINE
(P/N 111008343890
- PROVIDED) (P/N 27638C
- PROVIDED)
18 3/4"
(476mm)
5 1/8"
FLOOR LINE
BACK OF WALL TO
BE 12" (305mm)
MIN DEPTH
1. Cut a square rectangular wall opening 18 3/4” (476mm) W x 37 3/4” (959mm) H and 4 1/2” (114mm)
above the oor line. These dimensions are required to obtain proper rim and bubbler heights for compliance with ANSI standard A117.1.
2. Reinforce the wall opening on all sides so that it will adequately support the water fountain. This reinforcement must support up to 150 lbs static load and provide a means for securing the frame assembly in place. NOTE: Building construction must allow for adequate air ow on both sides and top of remote chiller unit. Minimum of 4” (102mm) is required.
3. Install plumbing and electrical rough-ins. A junction box for a (3) wire, 10 amp branch circuit is provided on the inside of the chiller. (Standard 120 Volts, 60 Hz and single phase)
4. Remove frame and related hardware from packaging. Release the two shelf rods by cutting cable ties. Install the frame squarely in wall opening with frame upright edges ush with the nished wall face. Place shelf inside frame and line up the (2) holes on each. Insert loose ends of rods into holes on sides of shelf panel. Using appropriately sized screws or bolts (not provided), fasten the shelf and frame to bottom of wall opening. Secure the frame sides and top to the wall using (10) 5/16” bolts or screws (not provided). NOTE: Be sure that frame is squared in location. Do not use less than the required screw quantity and size.
Elkay - www.elkay.com
Halsey Taylor - www.halseytaylor.com
For Technical Service, please contact us at 1.800.476.4106
97153C (Rev. G - 8/16)
DUAL-STATION MOUNTING FRAME INSTRUCTIONS
REVERSED CONFIGURATION:
HIGHER UNIT ON THE RIGHT
5/16" SCREWS OR BOLTS (12 REQ'D-NOT PROVIDED)
FRAME
(4 REQ'D - P/N 111577343890
- PROVIDED)
MF200
37 3/4" 959mm
4 1/2" 14mm
ACTUAL FRAME MAY VARY FROM THE ONE ILLUSTRATED. PLEASE REFER TO THE INSTALLATION/OWNERS MANUAL OF THE SPECIFIC UNIT FOR ADDITIONAL INFORMATION.
IMPORTANT: DOUBLE STUD OR 3 INCHES (76mm) BETWEEN MOUNTING FRAMES IF PLACED NEXT TO A BOTTLE FILLER UNIT
WOOD OR STEEL FRAME SHOWN (NOT PROVIDED)
1 1/8" 29mm
ELECTRICAL INLET LOCATION ON CHILLER
8"
203mm
TO FLOOR LINE
37 1/2" 953mm
5 1/8"
130mm
FLOOR LINE
BACK OF WALL
TO BE 12"
(305mm) MIN
DEPTH
(P/N 111008343890
- PROVIDED)
(P/N 101567443730
- PROVIDED)
STANDARD CONFIGURATION:
HIGHER UNIT ON THE LEFT
SCREWS OR BOLTS (NOT PROVIDED)
(4 REQ'D - P/N 111577243890
- PROVIDED)
1. Cut a square rectangular wall opening 37 1/2” (953mm) W x 37 3/4” (959mm) H and 4 1/2” (114mm) above
the oor line. These dimensions are required to obtain proper rim and bubbler heights for compliance with ANSI standard A117.1.
2. Reinforce the wall opening on all sides so that it will adequately support the water fountain. This reinforce ment must support up to 150 lbs static load and provide a means for securing the frame assembly in place. NOTE: Building construction must allow for adequate air ow on both sides and top of remote chiller unit. Minimum of 4” (102mm) is required.
3. Install plumbing and electrical rough-ins. A junction box for a (3) wire, 10 amp branch circuit is provided on the inside of the chiller. (Standard 120 Volts, 60 Hz and single phase)
4. Remove frame assembly and related hardware from packaging. Attach the two frames together thru the upright supports with (4) 5/16” x 3/4” (19mm) long bolts and nuts (provided). Tighten securely.
5. Install the frame assembly squarely in wall opening with frame upright support edges ush with the nished wall face. Secure the frame to the wall thru holes with (12) 5/16” bolts or screws (not provided). Tighten securely.
NOTE: Be sure that frame is squared in location. Do not use less than required screw quantity and size.
6. Attach the chiller shelf support rods to the right side frame uprights at the second set of holes counting from
the bottom and to the shelf at the (2) side holes. Line up the other shelf holes with the frame bottom holes and fasten the assembly to the wall using appropriately sized screws or bolts and nuts (not provided).
For Technical Service, please contact us at 1.800.476.4106
Elkay - www.elkay.com
Halsey Taylor - www.halseytaylor.com
97153C (Rev. G - 8/16)
Loading...