Halsey Taylor HT-EBP-E Installation Manual

HT-EBP*E, HT-SBP*E, HT-SEBP*K, HT-ESBP*K
Wall Mount Steel Fountains
INSTALLER
These series fountains are among the easiest to install Fountains on the market today. To assure you install these models easily and correctly, PLEASE READ THESE SIMPLE INSTRUCTIONS BEFORE STARTING THE INSTALLATION. CHECK YOUR INSTALLATION FOR COMPLIANCE WITH PLUMBING, ELECTRICAL, AND OTHER APPLICABLE CODES. After installation, leave these instructions with the Fountain for future reference.
IMPORTANT
ALL SERVICE TO BE PERFORMED BY AN AUTHORIZED SERVICE PERSON
IMPORTANT! INSTALLER PLEASE NOTE.
THE GROUNDING OF ELECTRICAL EQUIPMENT SUCH AS TELEPHONE, COMPUTERS, ETC. TO WATER LINES IS A COMMON PROCEDURE. THIS GROUNDING MAY BE IN THE BUILDING OR MAY OCCUR AWAY FROM THE BUILDING. THIS GROUNDING CAN CAUSE ELECTRICAL FEEDBACK INTO A FOUNTAIN, CREATING AN ELECTROLYSIS WHICH CAUSES A METALLIC TASTE OR AN INCREASE IN THE METAL CONTENT OF THE WATER. THIS CONDITION IS AVOIDABLE BY USING THE PROPER MATERIALS AS INDICATED. ANY DRAIN FITTINGS PROVIDED BY THE INSTALLER SHOULD BE MADE OF PLASTIC TO ELECTRICALLY ISOLATE THE FOUNTAIN FROM THE BUILDING PLUMBING SYSTEM.
OPERATION OF QUICK CONNECT FITTINGS
SIMPLY PUSH IN TUBE TO ATTACH
TUBE IS
SECURED
IN POSITION
FIG. 1
PUSH IN COLLET
TO RELEASE TUBE
PUSHING TUBE IN BEFORE
PULLING IT OUT HELPS TO
RELEASE TUBE
1/4" O.D. TUBE WATER INLET TO COOLER
3/8" O.D. UNPLATED COPPER TUBE CONNECT COLD WATER SUPPLY
NOTE: WATER FLOW
DIRECTION
FIG. 2
BUILDING WATER INLET
SERVICE STOP (NOT FURNISHED)
97639C (Rev. C - 3/04)Page 1
HT-EBP*E, HT-SBP*E, HT-SEBP*K, HT-ESBP*K
HT - EBP/SBP/SEBP/ESBP COOLER INSTALLATION
1. Wall should already be framed for the fountain using the rough-in dimensions shown in Figs. 3,4,5, or 6. Shown dimensions pertain to installation location (framing must support up to 150 lbs. weight for single fountain and 300 lbs. for dual fountains). These dimensions are required for compliance with ANSI Standard A117.0.
2. Attach wall plate assembly to wall as shown in Figs. 3,4,5, or 6 using 5/16" x 2" long bolts and flat washers (not provided). Tighten securely. (Fastener must match wall type, i.e. lag screws for wood studs, bolts and anchors for masonary construction.)
3. Install back panel. Place the upper edge of the panel above mounting plate on the wall. Slide the panel down until it engages the mounting plate. Be sure back panel is firmly engaged before releasing it.
4. Install rough-in plumbing as shown in Figs. 3,4,5, or 6. Waste line should extend a minimum of 2" (51mm) thru the back panel. Run supply water inlet line thru back panel. Install a service stop (not provided). Turn on supply water and flush thoroughly.
5. Remove bottom access panel from fountain basin and save the screws. Install the fountain to the back panel and wall using (4) 5/16  x 3/4 long bolts and washers (provided) thru holes in back panel. Tighten securely.
6. Cut waste tube to required length using plumbing hardware and trap (not provided) as a guide. Install hardware and trap. Tighten securely.
7. Make water supply connections from service stop to the fountain strainer. Insert the water inlet line into the inlet side of strainer until it reaches a positive stop - about 3/4" (See Fig. 2). Turn on water supply and check for leaks. Newly installed water supply line should be insulated after leak check is completed. DO NOT SOLDER TUBES INSERTED
INTO THE STRAINER AS DAMAGE TO THE O-RINGS MAY RESULT.
8. Check stream height from bubbler. Stream height is factory set at 45-50 PSI. If supply
pressure varies greatly from this, adjust the screw on regulator (item 13, on page 7). Clockwise adjustment will raise stream height and counter-clockwise will lower stream height. For best adjustment stream height should be approximately 1-1/2" (38mm) above the bubbler guard. (See Figure 8)
9. Water Valve Mechanism - ADJUSTMENT PROCEDURE:
- Turn adjustment screw (Item 7, page 7) counter-clockwise until water flow from bubbler starts
- Turn adjustment screw clockwise until water flow stops, then turn an additional 1/2 turn
10. Replace bottom access panel to fountain using the screws provided. Tighten securely.
97639C (Rev. C - 3/04) Page 2
HT - EBP
HT-EBP*E, HT-SBP*E, HT-SEBP*K, HT-ESBP*K
97639C (Rev. C - 3/04)Page 3
FINISHED FLOOR
FIG. 3
LEGEND: A = 3/8 O.D. UNPLATED COPPER TUBE CONNECT (WATER SUPPLY) B = 1-1/4 O.D. WASTE TUBE (ELBOW AND TRAP NOT PROVIDED) C = 1/4 DIA. (6mm) HOLES FOR MOUNTING PLATE TO WALL
Loading...
+ 5 hidden pages