HRF - EREE*B HRF - SEREE*B
Halsey T aylor Owners Manual
Electric Eye Refrigerated Fountain
Installer
T o assure you install this model easily and correctly ,
PLEASE READ THESE SIMPLE INSTRUCTIONS BEFORE ST ARTING THE
INST ALLATION. CHECK YOUR INSTALLA TION FOR COMPLIANCE WITH
PLUMBING, ELECTRICAL AND OTHER APPLICABLE CODES. After installation, leave
these instructions inside the fountain for future reference.
IMPORTANT
ALL SERVICE TO BE PERFORMED BY AN AUTHORIZED SERVICE PERSON
IMPORTANT! INSTALLER PLEASE NOTE.
THE GROUNDING OF ELECTRICAL EQUIPMENT SUCH AS TELEPHONE, COMPUTERS, ETC. TO
WA TER LINES IS A COMMON PROCEDURE. THIS GROUNDING MA Y BE IN THE BUILDING OR MA Y
OCCUR A WA Y FROM THE BUILDING . THIS GROUNDING CAN CAUSE ELECTRICAL FEEDBACK
INTO A FOUNT AIN, CREA TING AN ELECTROLYSIS WHICH CAUSES A METALLIC T ASTE OR AN
INCREASE IN THE METAL CONTENT OF THE WATER. THIS CONDITION IS A VOIDABLE BY USING
THE PROPER MA TERIALS AS INDICA TED. ANY DRAIN FITTINGS PROVIDED BY THE INST ALLER
SHOULD BE MADE OF PLASTIC TO ELECTRICALL Y ISOLA TE THE FOUNT AIN FROM THE BUILDING
PLUMBING SYSTEM.
1/4" O.D. TUBE
WATER INLET
TO COOLER
3/8" O.D. UNPLATED
COPPER TUBE CONNECT
COLD WA TER SUPPLY
BUILDING WA TER INLET
NOTE: WA TER FLOW
DIRECTION
SERVICE STOP
(NOT FURNISHED)
FIG. 2FIG. 1
97098C (Rev. L - 10/04)
HRF - EREE*B HRF - SEREE*B
INST ALLATION INSTRUCTIONS
1. Install mounting frame. See mounting frame instructions.
2. Install remote chiller. Remove front panel of chiller. Slide chiller onto the shelf and position it to the left within the guides on the shelf.
3. Attach solenoid valve assy to the underside of cross member of mounting frame, on dual station fountain soleniod valve assy mounts to
frame with chiller. See Fig 3.
4. Make water supply connections. Install a shut-off valve and union connection to building water supply (valve and union not provided).
Turn on the water supply and flush the line thoroughly.
5. Make connection between remote chiller and building supply line. Remove the 3/8" x 1/4" union from the chiller inlet tube and either install it
on the chiller outlet tube of single fountain units or on the water inlet line of the upper fountain of dual fountain units. Install the strainer
on the chiller inlet tube. Install a 3/8" O.D unplated copper water line between the valve and the cooler. Remove all burrs from the outside
of the water line. Insert the 3/8" water line into the inlet side of the strainer by pushing it in until it reaches a positive stop, approximately
3/4" (19mm). See Fig. 4. DO NOT SOLDER TUBES INSERTED INTO THE STRAINER AS DAMAGE T O THE O-RINGS MAY RESULT.
6. Make connection between remote chiller and solenoid valve assy. Single Fountain Units (See Fig.4) - Insert end of 1/4" O. D. formed tube
(provided) into union on chiller outlet and the other end into straight fitting on solenoid valve assy. On Dual Fountain Units (See Fig.5)
install the 3/8" tee (provided) on the chiller outlet tube. Install the 3/8" stem x 1/4" O.D. tube union (provided) into 3/8" tee as shown.
Install 1/4" formed tube (provided) between 3/8" stem x 1/4" O.D. tube union and the straight fitting on solenoid valve assy.
7. Hang the upper panel on the mounting frame hanger. Align holes in the panel with holes in the mounting frame. Be sure that panel is
engaged with hanger at top of frame before releasing it.
8. Install fountain (fountains). Remove access cover plate(s) on underside of fountain(s) and save the screws. Mount the fountain(s) to the
upper panel and the wall frame with 5/16" x 3/4" (19mm) long bolts and nuts (provided). Tighten securely.
9. Connect solenoid valve assy and regulator holder in fountain with sensor by installing 1/4" O.D. x 24" straight tube (provided). On dual
station units the fountain with the push button is to be connected to the chiller by installing the 3/8" O.D. x 30" tube (provided). Insert one
end into remaining outlet of the 3/8" tee and the other end into the 3/8" x 1/4" union on water inlet line of fountain.
10. Remove elbow from end of p-trap and attach it to drain tube. Re-attach elbow to p-trap and cut waste tube to required length using
plumbing hardware and trap as a guide.
11. Connect power cord of sensor to solenoid valve by running it thru the back panel and connecting it as shown in Fig. 7. Connectors may
be connected to either terminal on solenoid valve. Attach ground wire to solenoid valve bracket with green ground screw.
12. Turn on water supply. Release air from tank by interrupting infrared beam; steady stream of water assures all air is removed. The sensor
has a 30 second maximum ON time. It may be necessary to step away from beam a few times to allow chiller tank to refill. Check for
leaks.
13. These products are designed to operate on 20-105 PSIG supply line pressure. If inlet pressure is above 105 PSIG, a pressure regulator
must be installed in the supply line. Any damage caused by reason of connecting these products to supply line pressures lower than 20
PSIG or higher than 105 PSIG is not covered by warranty.
14. Make electrical connections to chiller. See chiller instructions.
15. Check stream height from bubbler. Stream height is factory set at 45-50 PSI . If supply pressure varies greatly from this, adjust the screw
on regulator (item 8) by using a small screwdriver through the small hole in the push button (item 28)(See Figure 8, Page 4). Clockwise
adjustment will raise stream height and counter-clockwise will lower stream height. For best adjustment stream height should be
approximately 1-1/2" (38mm) above the bubbler guard. (See Fig 9)
16. Mount lower panel. Loosen the (2) #10-24 x 5/8" (16mm) screws at frame bottom lip. Slide upper tongue of lower panel under lower edge of
already installed upper panel. Tighten previously loosened screws securely.
17. Replace bottom access panel to fountain basin using screws provided. Tighten securely.
2
FIG. 3
97098C (Rev. L - 10/04)
22
33
34
2
24
26
34
2
26
32
24
35
36
10
27
22
33
22
33
23
10
27
FIG. 4 FIG. 5
PAGE 2