Halsey Taylor HCRF-ER Owner's Manual

HCRFERQ - B
Halsey Taylor Owners Manual
Refrigerated Fountain with Back Panel
HCRF - ER
Installer
To assure you install this model easily and correctly, PLEASE READ THESE SIMPLE INSTRUCTIONS BEFORE STARTING THE INSTALLATION. CHECK YOUR INSTALLATION FOR COMPLIANCE WITH PLUMBING, ELECTRICAL AND OTHER APPLICABLE CODES. After installation, leave these instructions inside the fountain for future reference.
IMPORTANT
ALL SERVICE TO BE PERFORMED BY AN AUTHORIZED SERVICE PERSON
IMPORTANT! INSTALLER PLEASE NOTE.
THE GROUNDING OF ELECTRICAL EQUIPMENT SUCH AS TELEPHONE, COMPUTERS, ETC. TO WATER LINES IS A COMMON PROCEDURE. THIS GROUNDING MAY BE IN THE BUILDING OR MAY OCCUR AWAY FROM THE BUILDING. THIS GROUNDING CAN CAUSE ELECTRICAL FEEDBACK INTO A FOUNTAIN, CREATING AN ELECTROLYSIS WHICH CAUSES A METALLIC TASTE OR AN INCREASE IN THE METAL CONTENT OF THE WATER. THIS CONDITION IS AVOIDABLE BY USING THE PROPER MATERIALS AS INDICATED. ANY DRAIN FITTINGS PROVIDED BY THE INSTALLER SHOULD BE MADE OF PLASTIC TO ELECTRICALLY ISOLATE THE FOUNTAIN FROM THE BUILDING PLUMBING SYSTEM.
1/4" O.D. TUBE WATER INLET TO CHILLER
3/8" O.D. UNPLATED COPPER TUBE CONNECT COLD WATER SUPPLY
BUILDING WATER INLET
NOTE: WATER FLOW
DIRECTION
SERVICE STOP (NOT FURNISHED)
FIG. 2FIG. 1
97885C (REV. C - 5/04)
HCRFERQ - B
HCRF-ER ROUGH-IN
LEGEND: A = 1/4" O.D. TUBE - WATER OUTLET CONNECTION B = 3/8" O.D. TUBE - WATER INLET CONNECTION C = 1-1/4" O.D. WASTE TUBE D = ELECTRICAL INLET ON CHILLER
97885C (REV. C - 5/04)
FIG. 3
PAGE 2
Loading...
+ 2 hidden pages