Haier H3SM-HV03-R2 User Manual

Installation Manual of Room Air Conditioner
Read this manual before installation Explain sufficiently the operating means to the user according to this manual.
Necessary Tools for Installation
1.Driver
2.Hacksaw
3.Hole core drill
4.Spanner(17,19 and 26mm)
Drawing for the installation of indoor and outdoor units
Accessory parts
No. Accessory parts
1
2
3
4
Remote controller
R-03 dry battery
Mounting plate
Drain hose
Number of articles
3
6
3
3
5.Torque wrench(17mm,22mm,26mm)
6.Pipe cutter
7.Flaring tool
8.Knife
The models adopt HFC free refrigerant R410A
more than 10cm
Indoor unit A
Indoor unit B
Indoor unit C
9.Nipper 12.Reamer
10.Gas leakage detector or soap-and-water solution
11.Measuring tape
more than 5cm
Attention must be paid to the rising up of drain hose
more than 10cm
5
4X25
Screw
6
7
Plastic cap
Drain-elbow
Cushion
Optional parts for piping
Mark
A B
C D E
F G
Parts name
Adhesive tape
Saddle(L.S) with screws
Connecting electric cable for indoor and outdoor
Drain hose
Heating insulating material
Piping hole cover
No.001051
12
1
4
Arrangement of piping directions
Rear left
Below
Rear right
Right
Left
The marks from to in the figure are the parts numbers. The distance between the indoor unit and the floor should be
more than 2m.
more than 10cm
more than 60cm
A
C
more than 10cm
D
E
more than 15cm
G
635113.5 113.5
Floor fixing dimensions of the outdoor unit (Unit:mm)
340
Fixing of outdoor unit
Indoor Unit
Place, robust not causing vibration, where the body can be supported sufficiently. Place, not affected by heat or steam generated in the vicinity, where inlet and outlet of the unit are not disturbed. Place, possible to drain easily, where piping can be connected with the outdoor unit. Place, where cold air can be spread in a room entirely. Place, nearby a power receptacle, with enough space around. (Refer to drawings). Place where the distance of more than lm from televisions, radios, wireless apparatuses and fluorescent lamps can be left. In the case of fixing the remote controller on a wall, place where the indoor unit can receive signals when the fluorescent lamps in the room are lightened.
Selection of Installation Place
Fix the unit to concrete or block with bolts( 10mm) and nuts firmly and horizontally. When fitting the unit to wall surface, roof or rooftop, fix a supporter surely with nails
or wires in consideration of earthquake and strong wind. If vibration may affect the house, fix the unit by attaching a vibration-proof mat.
Outdoor Unit
Place, which is less affected by rain or direct sunlight and is sufficiently ventilated. Place, possible to bear the unit, where vibration and noise are not increased. Place, where discharged wind and noise do not cause a nuisance to the neighbors. Place, where a distance marked is available as illustrated in the above figure.
Power Source
Before inserting power plug into receptacle, check the voltage without fail. The power source is the same as the corresponding name plate. Install an exclusive branch circuit of the power. A receptacle shall be set up in a distance where the power cable can be reached. Do not extend the cable by cutting it.
Selection of pipe
To this unit, both liquid and gas pipes shall be insulated as they become Iow temperature in operation. Use optional parts for piping set or pipes covered with equivalent insulation material. The thickness of the pipe must be 0.8 mm at least.
Liquid pipe( )
Gas pipe( )
2
6.35mm(1/4")
9.52mm(3/8")
Indoor unit
1.Fitting of the Mounting Plate and Positioning of the wall Hole When the mounting plate is first fixed
1.Carry out, based on the neighboring pillars or lintels, a proper leveling for the plate to be fixed against the wall, then temporarily fasten the plate with one steel nail.
2. Make sure once more the proper level of the plate, by hanging a thread with a weight from the central top of the plate, then fasten securely the plate with the attachment steel nail.
3. Find the wall hole location A using a measuring tape
A=80mm
Fit the level line
35
When the mounting plate is fixed side bar and lintel
Fix to side bar and lintel a mounting bar, Which is separately sold, and then fasten the plate to the fixed mounting bar.
Refer to the previous article, " When the mounting plate is first fixed ", for the position of wall hole.
2.Making a Hole on the Wall and Fitting the Piping Hole Cover
Make a hole of 70 mm in diameter, slightly descending to outside the wall. Install piping hole cover and seal it off with putty after installation
Indoor side
Wall hole
70mm
Outdoor side
Thickness of wall
G
(Section of wall hole)
Piping hole pipe
3.Installation of the Indoor Unit Drawing of pipe
[ Rear piping ]
Draw pipes and the drain hose, then fasten them with the adhesive tape
[ Left Left-rear piping ]
In case of left side piping, cut away, with a nipper, the lid for left piping. In case of left-rear piping, bend the pipes according to the piping direction to the mark of hole for left-rear piping which is marked on heat insulation materials.
3
Indoor unit
1. Insert the drain hose into the dent of heat insulation materials of indoor unit.
2. Insert the indoor/outdoor electric cable from backside of indoor unit, and pull it out on the front side, then connect them.
3. Coat the flaring seal face with refrigerant oil and connect pipes. Cover the connection part with heat insulation materials closely, and make sure fixing with adhesive tape
Heat insulation material
Lid for right piping
Lid for under piping
Fix with adhesive tape
Indoor/outdoor electric cable and drain hose must be bound with refrigerant piping by protecting tape.
Lid for left piping
Drain hose
Piping
Pipe supporting plate
Indoor/outdoor electric cable
[Other direction piping]
Cut away, with a nipper, the lid for piping according to the piping direction and then bend the pipe according to the position of wall hole. When bending, be careful not to crash pipes. Connect beforehand the indoor/outdoor electric cable, and then pull out the connected to the heat insulation of connecting part specially.
Fixing the indoor unit body
Hang surely the unit body onto the upper notches of the mounting plate. Move the body from side to side to verify its secure fixing. In order to fix the body onto the mounting plate,hold up the body aslant from the underside and then put it down perpendicularly.
4.Connecting the indoor/outdoor Electric Cable
[Cautions]
1.Make sure it is unit A, unit B or unit C, when make wiring.
2.Unit to be connected to stop valve A on outdoor unit is unit A, Unit to be connected to stop valve B on outdoor unit is unit B, while the one to be connected to stop valve C is unit C.
3.Refer to wiring diagram.
Removing the wiring cover
Remove terminal cover at right bottom corner of indoor unit, then take off wiring cover by removing its screws.
When connecting the cable after installing the indoor unit
1. Insert from outside the room cable into left side of the wall hole, in which the pipe has already existed.
2. Pull out the cable on the front side, and connect the cable making a loop.
When connecting the cable before installing the indoor unit
Insert the cable from the back side of the unit, then pull it out on the front side. Loosen the screws and insert the cable ends fully into terminal block, then tighten the screws. Pull the cable slightly to make sure the cables have been properly inserted and tightened. After the cable connection, never fail to fasten the connected cable with the wiring cover. IMeans for disconnection from the supply mains having a contact separation in all poles must be incorporated in the fixed wiring in accordance with the wiring rules. The power plug is self-provided,the power plug must acquired the local attestation.
4
Indoor unit
Note: When connecting the cable, confirm the terminal number of indoor and outdoor units carefully. If wiring is not correct, proper operation can not be carried out and will cause defect.
1. If the supply cord is damaged, it must be replaced by the manufacturer or its service agent or a similar qualified person. The type of connecting wire is H05RN-F or H07RN-F.
2. If the fuse on PC board is broken please change it with the type of T. 3.15A/250V.
3. The wiring method should be in line with the local wiring standard.
4. After installation, the power plug should be easily reached.
5. A breaker should be incorporated into fixed wiring. The breaker should be all-pole switch and the distance between its two contacts should be not less than 3mm.
Indoor unit A
YEL/GRN
RED
WHT
RED
1(N)2(L) 3(C)
Indoor unit C
3(C)
1(N)2(L)
Indoor unit B
3(C)
1(N)2(L)
BLK
WHT
YEL/GRN
RED
BLK
WHT YEL/GRN
RED
BLK
WHT
RED
RED
BLK
BLK
WHT
BLK
YEL/GRN
WHT
YEL/GRN
YEL/GRN
BRN
OP W
BLU
RE
YEL/GRN
Outdoor unit
5.Easily-demount cleaning of indoor unit
claw of the clip
1.Top inlet can be taken down
Open the inlet grille, press the claw of the clip on the unit,then take down the top inlet.(according to figure 1)
2.Vertical flap can be taken down
Overturn the vertical flap, press the claw of the clip ,then take down vertical flap.(according to figure 2)
3.Horizontal louvers can be taken down
After taking down vertical flap.Horizontal louvers are appeared,draw the middle louver,and take down the horizontal louvers . (according to figure 3)
5
Figure 2
Daff
Figure 1
Figure 2
Figure 3
Outdoor unit
1.Installation of Outdoor Unit
Install according to
Drawing for the installation of indoor and outdoor units
2.Connection of pipes
To bend a pipe, give the roundness as large as possible not to crush the pipe ,and the bending radius should be 30 to 40 mm or longer. Connecting the pipe of gas side first makes working easier. The connection pipe is specialized for R410A. The max vertical distance between the indoor unit and the outdoor unit is 5 m.
Half union
Spanner
Flare nut
Torque wrench
Forced fastening without careful centering may damage the threads and cause a leakage of gas.
Pipe Diameter ( )
Liquid side 6.35mm(1/4")
Gas side 9.52mm(3/8") Gas side 12.7mm(1/2")
Fastening torque
18N.m 40N.m
55N.m
Be careful that matters, such as wastes of sands, etc. shall not enter the pipe. The standard pipe length is 5m. If it is over 5m, the function of the unit will be affected. If the pipe has to be lengthened, the refrigerant should be charged, according to 20 g/m. But the charge of refrigerant must be conducted by professional air conditioner engineer. Before adding additional refrigerant, perform air purging from the refrigerant pipes and indoor unit using a vacuum pump,then charge additional refrigerant.
3.Connection
Use the same method on indoor unit. Loosen the screws on terminal block and insert the plugs fully into terminal block, then tighten the screws.
Insert the cable according to terminal number in the same manner as the indoor unit.
If wiring is not correct, proper operation can not be carried out and controller may be damaged.
Fix the cable with a clamp.
4.Attaching Drain-Elbow
If the drain-elbow is used, please attach it as figure. (Note: Only for heat pump unit.)
6
Outdoor unit
6.Purging Method:To use vacuum pump
1 Detach the service port's cap of 3-way(G) valve, the valve rod's cap for 3-way(L) valve and 3-way's(G), connect the service port into the projection of charge hose (Iow) for gaugemanifold. Then connect the projection of charge hose (center) for gaugemanifold into vacuum pump.
2 Open the handle at Iow in gaugemanifold, operate
vacuum pump. If the scale-moves of gause (Iow) reach vacuum condition in a moment, check again.
3 Vacuumize for over 15min. And check the level gauge
which should read -0.1 MPa (-76 cm Hg) at Iow pressure side. After the completion of vacuumizing, close the handle 'Lo' in gaugemanifold and stop the operation of the vacuum pump. Check the condition of the scale and hold it for 1-2min. If the scale-moves back in spite of tightening, make flaring work again, the return to the beginning of .
4
Open the valve rod for the 3-way(L) valve to an angle of anticlockwise 90 degrees. After 6 seconds, close the 3-way(L) valve and make the inspection of gas leakage.
1
3
3-way valve(L)
Tube(for R410A)
Open
Close
3-way valve(L)
3-way valve(G)
3-way valve(G)
Open
o
90
Gaugemanifold(for R410A)
Anti countercurrent joint
Vacuum pump(for R410A)
Service port
90o for 6 sec.
5
No gas leakage?
6
Detach the charge hose from the service port, open 3-way(L) valve and 3-way(G). Turn the valve rod anticlockwise until hitting lightly.
7
To prevent the gas leakage, turn the service port's cap, the valve rod's cap for 3-way(L) valve and 3-way's(G) a little more than the point where the torque increases suddenly.
8
After attaching the each caps, check the gas leakage around the caps.
CAUTION:
1.If the refrigerant of the air conditioner leaks, it is necessary to discharge all the refrigerant. Vacuumize first, then charge the liquid refrigerant into air conditioner according to the amount marked on the name plate.
In case of gas leakage, tighten parts of pipe connection. If leakage stops, then proceed steps.
6
If it does not stop gas leakage, discharge whole refrigerants from the service port. After flaring work again and vacuumize, fill up prescribed refrigerant from the gas cylinder.
3-way valve(L)
3-way valve(L)
Service port cap
2.Please do not let other cooling medium, except specified one (R410A), or air enter into the cooling circulation system. Otherwise, there will be abnormal high pressure in the system to make it crack and lead to personal injuries.
3-way valve(G)
3-way valve(G)
Valve rod cap
Valve rod cap
Service port cap
To indoor unit A
To indoor unit B To indoor unit C
7
1.Power Source Installation
The power source must be exclusively used for air conditioner. (Over I0A) In the case of installing an air conditioner in a moist place, please install an earth leakage breaker. For installation in other places, use a circuit breaker as far as possible.
2.Cutting and Flaring Work of Piping
Pipe cutting is carried out with a pipe cutter and burs must be removed. After inserting the flare nut, flaring work is carried out.
A
Flare tool for R410A
Clutch-type
A
0~0.5mm 1.0~1.5mm 1.5~2.0mm
clutch-type(Rigid-type)
1.Cut pipe
Flare tooling die
2.Remove burs
3.Insert the flare nut
Correct
Incorrect
4.Flare pipe
Lean Damage of flareCrack Partial Too outside
3.On Drainage
Please install the drain hose so as to be downward slope without fail. Please don't do the drainage as shown below.
Conventional flare tool
Wing-nut type (Imperial-type)
Less than 5cm
It becomes high midway.
The end is immersed in water.
It waves. The gap with the ground
is too small
There is the bad smell from a ditch
Please pour water in the drain pan of the indoor unit, and confirm that drainage is carried out surely to outdoor. In case that the attached drain hose is in a room, please apply heat insulation to it without fail.
Check for Installation and Test Run
Please kindly explain to our customers how to operate through the instruction manual.
Check Items for Test Run
Gas leak from pipe connecting? Heat insulation of pipe connecting? Are the connecting wirings of indoor and outdoor firmly inserted to the terminal block? Is the connecting wiring of indoor and outdoor firmly fixed?
Put check mark in boxes
Is drainage securely carried out? Is the earth line securely connected? Is the indoor unit securely fixed? Is power source voltage abided by the code? Is there any noise?
8
Is the lamp normally lighting? Are cooling and heating (when in heat pump) performed normally? Is the operation of room temperature regulator normal?
Loading...