Haier 3HUM18HB03/R2 - annexe 1, 3HUM18HB03/R2 1 Installation Manual

Drawing for the installation of indoor and outdoor units
Necessary Tools for Installation
Driver
Torque wrench
(17mm,22mm,26mm)
Nipper
Reamer
Gas leakage detector or soap-and-water solution
Hole core drill Flaring tool Spanner(17,19 and 26mm) Knife
Measuring tape
Indoor Unit
Place, robust not causing vibration, where the body can be supported suf ciently. Place, not affected by heat or steam generated in the vicinity, where inlet and outlet of the unit are not disturbed.
Place, possible to drain easily, where piping can be connected with the outdoor unit. Place, where cold air can be spread in a room entirely. Place, nearby a power receptacle, with enough space around. (Refer to drawings). Place where the distance of more than lm from televisions, radios, wireless apparatuses and uorescent lamps can be left.
In the case of xing the remote controller on a wall, place where the indoor unit can receive signals when the uorescent
lamps in the room are lightened.
Outdoor Unit
Place, which is less affected by rain or direct sunlight and is sufciently ventilated. Place, possible to bear the unit, where vibration and noise are not increased. Place, where discharged wind and noise do not cause a nuisance to the neighbors. Place, where a distance marked
is available as illustrated in the above gure.
Before inserting power plug into receptacle, check the voltage without fail. The power
source is the same as the
corresponding name plate.
Install an exclusive branch circuit of the power.
A receptacle shall be set up in a distance where the power cable can be reached.
Do not extend the cable by cutting it.
Power Source
Preparation
Please be subject to the actual product purchased , the above picture is just for your reference.
Read this manual before installation Explain sufciently the operating means to the user according to this manual.
NO.0010531141
Installation Manual of Room Air Conditioner
Optional parts for piping
Non-adhesive tape Adhesive tape Saddle (L.S) with screws Connecting electric cable
for indoor and outdoor
Drain hose
Heating insulating material
Piping hole cover
Floor xing dimensions of the
outdoor unit (Unit:mm)
Fixing of outdoor unit
Fix the unit to concrete or block with bolts (10mm) and nuts rmly and horizontally. When tting the unit to wall surface, roof or rooftop, x a supporter surely with nails or wires in consideration of earthquake and strong wind. If vibration may affect the house, x the unit by attaching a vibration-proof mat.
The marks from to
in the gure are the parts numbers. The distance between the indoor unit and the oor should be more than 2m.
The models adopt HFC free refrigerant R410A
more than
10cm
more than 5cm
more than
10cm
more than15cm
more than
60cm
more than 10cm
A
G
A
F
C
E
D
G
B
Arrangement of piping directions
Rear left
Left
Rear right
Right
Below
Attention must be paid to
the rising up of drain hose
113.5
633
113.5
0 4 3
D
E
C
Indoor unit A
Indoor unit B
Indoor unit C
D
Selection of Installation Place
Indoor unit
Fix to side bar and lintel a mounting bar, Which is separately sold, and then
fasten the plate to the xed mounting bar.
Refer to the previous article, “ When the mounting plate is
position of wall hole.
Make a hole of 60 mm in diameter, slightly descending to outside the wall.
Install piping hole cover and seal it off with putty after installation
When the mounting plate is rst xed
1. Carry out, based on the neighboring pillars or lintels, a to be xed against the wall, then
temporarily fasten the plate with one steel nail.
2. Make sure once more the proper level of the plate, by
hanging a thread with a weight from the central top of the plate, then fasten securely the plate with the attachment steel nail.
3. Find the wall hole location A using a measuring tape
When the mounting plate is xed side bar and lintel
1
Fitting of the Mounting Plate and
Positioning of the wall Hole
Lid for right piping
Lid for under piping pipe
Fix with adhesive tape
Lid for left piping
Indoor/outdoor electric cable and drain hose must be bound with refrigerant
piping by protecting tape.
[ Other direction piping ]
Cut away, with a nipper, the lid for piping according to the piping direction and
then bend the pipe according to theposition of wall hole. When bending, be
careful not to crash
pipes.
Connect beforehand the indoor/outdoor electric cable,
and then pull out the
connected to the heat insulation of connecting part specially.
proper leveling for the plate
rst xed “, for the
2
Making a Hole on the Wall and Fitting the Piping Hole Cover
Drawing of pipe
3
Installation of the Indoor Unit
[ Rear piping ]
Draw pipes and the drain hose, then fasten them with the adhesive tape
[ Left・Left-rear piping ]
In case of left side piping, cut away, with a nipper, the lid for left piping.
In case of left-rear piping, bend the pipes according to the piping direction to
the mark of hole for left-rear piping which is marked on heat insulation materials.
1. Insert the drain hose into the dent of heat insulation
materials of indoor unit.
2. Insert the indoor/outdoor electric cable from backside of
indoor unit, and pull it
out on the front side, then connect them.
3. Coat the aring seal face with refrigerant oil and connect
pipes. Cover the connection part with heat insulation materials closely, and make sure xing with adhesive tape
Fixing the indoor unit body
Hang surely the unit body onto the upper notches of the
mounting plate. Move the body from side to side to verify its secure xing.
In order to x the body onto the mounting plate,hold up
the body aslant from the underside and then put it down perpendicularly.
4
Connecting the indoor/outdoor Electric Cable
Removing the wiring cover
Remove terminal cover at right bottom corner of indoor unit, then take
off wiring cover by removing its screws.
1. Insert from outside the room cable into left side of the wall hole, in which the pipe has already existed.
2. Pull out the cable on the front side, and connect the cable
making a loop.
Note
When connecting the cable, conrm the terminal number of indoor and outdoor units carefully. If wiring is not correct, proper operation can not
be carried out and will cause defect.
Insert the cable from the back
side of the unit, then pull it out
on the front side.
Loosen the screws and insert
the cable ends fully into
terminal block, then
tighten the screws.
Pull the cable slightly to
make sure the cables have
been properly inserted and
tightened.
After the cable connection,
never fail to fasten the connected cable with the
wiring cover.
mounting plate
When connecting the cable after installing the indoor unit
When connecting the cable before installing the indoor unit
When you unload the indoor unit,please use
then lift the bottom of the body outward slightly and lift the unit aslant until it leaves the mounting plate.
agraffe
mounting plate
Unloading of indoor unit body
your hand to arise the body to leave agraffe,
Remote controller (1)
R-03 dry battery (2)
Mounting plate (1)
Drain hose (1)
Ø4X25 Screw
(4)
Plastic cap (4)
Drain-elbow (1)
Cushion (4)
Pipe supporting plate (1)
Accessory parts
Liquid pipe (Ø) 6.35mm(1/4”)
Gas pipe (Ø) 9.52mm(3/8”)
NOTEThe thickness of the pipe must be 0.8mm at least.
Selection of pipe
2
A=145mm
B= 60mm
3
0
mm
A=150mm
B= 60mm
30mm
Ø
Ø
Heat insulation material
Drain hose
Piping
Pipe supporting plate
Indoor/outdoor electric c able
Indoor side
Outdoor side
Ø60mm
Wall hole
Thickness of wall
(Section of wall hole)
Piping hole pipe
G
1. If the supply cord is damaged, it must be replaced by the manufacturer or its service agent or a similar qualied person. The type of connecting wire is H05RN-F
or H07RN-F.
2. If the fuse on PC board is broken please change it with the
type of
3. The wiring method should be in line with the local wiring standard.
4. After installation, the power plug should be easily reached.
5. A breaker should be incorporated into xed wiring. The breaker should be all-pole
switch and the distance between its two contacts should be not less
than 3mm.
3
Outdoor unit
Indoor unit A
R
E
WO
P
Indoor unit B
Indoor unit C
3HUM20HA03/R2(DB)
Power cable: 3G2.5mm
Outdoor unit
Indoor unit A
R
E
W
O
P
Indoor unit B
Indoor unit C
Power cable: 3G2.5mm
3HUM20H03/R2(DB)
1
2
3
(N
)
(L
)
(
C)
1
2
3
(N
)
(L
) (
C)
1
2
3
(N
)
(
L
)
(C)
Outdoor unit
Install according to Drawing for the installation of indoor and
outdoor units
To bend a pipe, give the roundness as large as possible not to crush the pipe ,
and the bending radius should be 30 to 40
mm or longer.
Connecting the pipe of gas side rst makes working easier. The connection pipe is specialized for R410A.
Use the same method on indoor unit. Loosen the screws on
terminal block and insert the plugs fully into terminal block, then tighten the screws. Insert the cable according to terminal number in the same manner as the indoor unit.
If wiring is not correct, proper operation can not be carried out and controller may be damaged.
Fix the cable with a clamp.
Installation of Outdoor Unit
Half union
Flare nut
Torque wrench
Spanner
Forced fastening without careful centering may damage the threads and cause a leakage of gas.
Pipe Diameter(ǿ) Fastening torque
Liquid side6.35mm(1/4") 18N.m
Liquid/Gas side9.52mm(3/8") 42 N.m
Gas side 12.7mm(1/2") 55N.m
Gas side 15.88mm(5/8") 60 N.m
1
Connection of pipes
2
Connection
3
If the drain-elbow is used, please attach it as gure. (Note: Only for heat pump unit.)
Attaching Drain-Elbow
4
Purging Method:To use vacuum pump
5
In case the elevation A is more than 5m, oil trap shoud be installed every 5~7m.
A
B
Outdoor unit
Indoor unit
Oil trap
CAUTION
The height difference between any two units
(including indoor unit and outdoor unit)
can
Outdoor unit
Indoor unit
B1
Indoor unit
B2
B3
Indoor unit
Max. Length:
B1
max
=20m
(B1+B2+B3)
max
=45m
B2
max
=20m
B3
max
=20m
not be more than 15 metres.
Detach the service port’s cap of1.
3-way(G) valve, the valve rod’s cap for 3-way(L)
valve and 3-way’s(G).Connect the service port into the
projection of charge hose
(Iow) for gaugemanifold.
Then connect
the projection of charge hose (center) for
gaugemanifold
into vacuum pump.
Open the handle at Iow in2.
gaugemanifold, operate
vacuum pump. If the scale-
moves of gause (Iow) reach vacuum condition in a moment, check 1. again.
Vacuumize for over 15min.And check the level gauge which should read -0.1MPa
3.
(76 cm Hg) at Iow
pressure side. After the
completion of vacuumizing, close the
handle ‘Lo’ in gaugemanifold and stop the operation of the vacuum pump. Check
condition of the scale and hold it for 1-2min. If the scale-moves back in spite of
tightening, make aring work again, the return to the beginning of 3 .
Open the valve rod for the 3-way(L) valve to an angle of4.
anticlockwise 90 degrees.
After 6 seconds, close the
3-way(L) valve and make the
inspection of gas leakage.
according to 20 g/m. But the charge of refrigerant must
be conducted by profes­sional air conditioner engineer. Before adding additional refrigerant, perform air purging from the refrigerant pipes and indoor unit using a vacuum
pump,then
charge additional refrigerant.
Be careful that matters, such as wastes of sands, etc. shall not enter the pipe. The standard pipe length of each indoor unit is 5m. If total pipe length is over
30m, the function of the unit will be affected, charge more refrigerant is needed,
T.3.15A/250VAC (Indoor), T.25A/250VAC (Outdoor).
3HUM18HB03/R2(DB)
HSM07HEK03/R2(DB) HSM09HEK03/R2(DB) HSM12HEK03/R2(DB)
HSM07HEA03/R2(DB) HSM09HEA03/R2(DB) HSM12HEA03/R2(DB)
3HUM20HA03/R2(DB)
HSM07HRA03/R2(DB) HSM09HRA03/R2(DB) HSM12HRA03/R2(DB)
The power source must be exclusively used for air
conditioner. (Over I0A)
In the case of installing an air conditioner in a moist place,
please install an ea-
For installation in other places, use a circuit breaker as far
as possible.
Pipe cutting is carried out with a pipe cutter and burs must
be removed.
After inserting the are nut, aring work is carried out.
If the refrigerant of the air conditioner leaks, it is necessary to discharge all the
refrigerant. Vacuumize rst, then
charge the liquid refrigerant into air conditio-
ner according to the amount marked on the name plate.
Please do not let other cooling medium, except specied one (R410A), or air
enter into the cooling circulation system. Other wise, there will be abnormal
high pressure in the system to make it crack and lead to personal injuries.
1
Power Source Installation
2
Cutting and Flaring Work of Piping
Flare tooling die
1.Cut pipe
2.Remove burs
3.Insert the are nut
CAUTION
Flare tool for R410A Conventional are tool
Clutch-type clutch-type(Rigid-type) Wing-nut type (Imperial-type)
A 0~0.5mm 1.0~1.5mm 1.5~2.0mm
rth leakage breaker.
4.Flare pipe
Lean
Damage of are Partial Too outside
Correct Incorrect
3
On Drainage
It becomes
high midway.
The gap with the
ground is too small.
There is the bad smell from a ditch
It waves.
The end is imm­ersed in water.
Please install the drain hose so as to be downward slope without fail. Please don’t do the drainage as shown below.
Please pour water in the drain pan of the indoor unit, and
In case that the attached drain hose is in a room, please
apply heat
Less than
5cm
conrm that
4
Open
Close
Step 1.
Step 2.
Step 3.
Step 7.
Step 6.
Step 4.
3-way valve(L)
Valve rod cap
3-way valve(G)
3-way valve(L)
3-way valve(G)
3-way valve(G)
3-way valve(L)
90
o
Open
Tube(for R410A)
Gaugemanifold(for R410A)
Anti countercurrent joint
Vacuum pump(for R410A)
Service port cap
3-way valve(L)
3-way valve(G)
No gas leakage?5.
In case of gas leakage, tighten parts of pipe connection. If
leakage stops, then proceed 6. steps
If it does not stop gas leakage, discharge whole refrigerants
from the service
port. After aring work again and vacuumize, ll up prescribed
refrigerant from the gas cylinder.
Detach the charge hose6.
from the service port,
open 3-way(L) valve and 3-way(G).
Turn the valve rod anticlockwise until hitting lightly.
To prevent the gas
leakage, turn the service
port’s cap, the valve
rod’s cap for 3-way
(L)valve and 3-way’s(G) a little more than the point where the torque increases suddenly.
After attaching the each
caps, check the gas
leakage around the caps.
7.
8.
Check Items for Test Run
Put check mark
in boxes
Gas leak from pipe connecting? Heat insulation of pipe connecting? Are the connecting wirings of indoor and outdoor rmly
Is the connecting wiring of indoor and outdoor rmly xed? Is drainage securely carried out? Is the earth line securely connected? Is the indoor unit securely xed? Is power source voltage abided by the code?
Is there any noise?
Is the lamp normally lighting? Are cooling and heating (when in heat pump) performed normally? Is the operation of room temperature regulator normal?
Please kindly explain to our customers how to operate through the instruction manual.
Check for Installation and Test Run
inserted to the terminal block?
1
1+2=
kg
R410A
2
kg
2=
1=
B
C
D
F E
kg
A
This product contains fluorinated greenhouse gases covered by the Kyoto Protocol. Do not vent into the atmosphere.
Refrigerant type:R410A GWP* value:1975 GWP=global warming potential Please fill in with indelible ink,
• 1 the factory refrigerant charge of the product
• 2 the additional refrigerant amount charged in the field and
• 1+2 the total refrigerant charge on the refrigerant charge label supplied with the product. The filled out label must be adhered in the proximity of the product charging port (e.g. onto the inside of the stop value cover). A contains fluorinated greenhouse gases covered by the Kyoto Protocol B factory refrigerant charge of the product: see unit name plate C additional refrigerant amount charged in the field D total refrigerant charge E outdoor unit F refrigerant cylinder and manifold for charging
Contains fluorinated greenhouse gases covered by the Kyoto Protocol
Refrigerant charge label
Crack
drainage is carried out surely to outdoor.
insulation to it without fail.
Manual de instalación de aparato de aire acondicionado
Preparación
Herramientas necesarias para realizar la instalación
Destornillador Llave dinamométrica (17mm, 22mm,
26mm) Alicate Sierra de tubos Sierra para metales Herramienta de conicidad Broca de tubo Cuchilla Llave (17, 19 y 26 mm) Metro Detector de fugas de gas o agua jabonosa
Avellanador
Fuente de alimentación
Antes de insertar el enchufe de alimentación en la toma, compruebe que el voltaje no falla. La fuente de alimentación es la que figura en la placa de datos nominales. Instale el aparato en un circuito dedicado de alimentación. Debe existir una toma al alcance del cable de alimentación. No prolongue el cable cortándolo.
Selección del lugar de instalación
Unidad interior
Coloque la unidad sobre una superficie que pueda soportarla correctamente y no provoque vibraciones. Asegúrese de que el lugar no se ve afectado por calor o vapor generado en las cercanías y donde las tomas de entrada y salida no estén obstruidas. Asegúrese de que el lugar permita un drenaje sencillo y en el que puedan conectarse los tubos a la unidad exterior. Asegúrese de que el aire frío pueda distribuirse uniformemente por la sala. Coloque la unidad interior cerca de una toma de suministro eléctrico con espacio suficiente alrededor. (Consulte los diagramas). Coloque la unidad interior de modo que se encuentre a más de 1m de televisiones, radios, aparatos inalámbricos y lámparas fluorescentes. En el caso de fijar el control remoto a una pared, colóquelo donde la unidad interior pueda recibir su señal mientras estén encendidas las lámparas fluorescentes de la sala.
Unidad exterior
Seleccione el lugar menos afectado por la lluvia o la luz solar directa y suficientemente ventilado. Elija un lugar que permita soportar el peso de la unidad y que no amplifique el ruido y las vibraciones. Seleccione un lugar en el que los residuos y el viento generado por la unidad no cause una molestia a los vecinos. Coloque la unidad en un lugar en el que pueda disponerse de la distancia de separación marcada
en la figura anterior.
Diagrama para la instalación de aparatos interiores y exteriores
Recuerde que la ilustración anterior podría no reflejar fielmente el producto adquirido y debe utilizarse únicamente como referencia. Lea este manual antes de la instalación Explique el uso del aparato al usuario siguiendo las instrucciones de este manual.
Los modelos cumplen la norma R410A sobre refrigerantes libres de HFC
más de 5cm
más de 10cm
Unidad interior A
Organización de la dirección de los tubos
Izquierda
Izquierda trasera
Derecha trasera
Derecha
Inferio
r
Las marcas de
A a G que se muestran en la figura representan los componentes. La distancia entre la unidad interior y el suelo debe ser superior a 2m.
Debe prestarse atención a la pendiente de la manguera de drenaje
más de 10cm
más de 10cm
más de 60cm
Componentes opcionales para la instalación de los tubos
A Cinta no adhesiva B Cinta adhesiva C Soporte (L.S) con tornillos D Conexión de cable
eléctrico para interior y
exterior E Manguera de drenaje F Material aislante de calor G Cubierta de orificio de
entubación
Dimensiones de fijación al suelo de la unidad exterior (Unidad:mm)
Fijación de la unidad exterior
Fije la unidad a un bloque de cemento con pernos (10mm) y tuercas firme y horizontalmente. Si instala la unidad sobre una pared, techo o tejado, instale un soporte con clavos o cables considerando la posibilidad de terremotos o viento fuerte. Si la vibración afectase a la casa, fije la unidad instalando una alfombra de absorción de vibraciones.
Unidad interior B
Unidad interior C
más de15cm
5
○ ○
○ ○
○ ○
Loading...
+ 11 hidden pages