HADEF 62/05 Installation, Operating And Maintenance Instructions

Page 1
Installation, Operating and Maintenance Instructions
HADEF Electric Chain Hoist
Type 62/05
5.52.420.00.01.07 Rev.07
Page 2
NOTICE!
The installation or mounting instructions for incomplete machines you’ll find in chapter “Installation”
o
© by Heinrich de Fries GmbH
Heinrich de Fries GmbH, Gauss Str. 20, D-40235 Düsseldorf
Heinrich De Fries GmbH will be named HADEF in the following text. Original operating- and maintenance instructions in German language. Translation in other languages is made of the German original. A copy may be requested in writing or is available for download on www.hadef.com Subject to changes.
Table of Contents
1 Information .......................................................................................... 3
1.1 Indications to determine the used part of the theoretical usage life. ........................... 4
2 Safety ................................................................................................... 4
2.1 Warning notice and symbols ............................................................................................ 4
2.2 Duty of care of the owner .................................................................................................. 4
2.3 Requirements for the operating personnel ..................................................................... 5
2.4 Appropriate use ................................................................................................................. 5
2.5 Basic safety measures ...................................................................................................... 6
3 Transport and Storage ....................................................................... 7
3.1 Transport ............................................................................................................................ 7
3.2 Safety device for transport ............................................................................................... 7
3.3 Storage ............................................................................................................................... 7
4 Description .......................................................................................... 7
4.1 Areas of application .......................................................................................................... 7
4.2 Design ................................................................................................................................. 8
4.3 Functions ............................................................................................................................ 8
4.4 Important components ...................................................................................................... 8
5 Technical data ................................................................................... 10
6 Installation ......................................................................................... 10
6.1 Stationary hoist ................................................................................................................ 10
6.2 Adjusting the gauge ........................................................................................................ 10
6.3 Installation on the beam .................................................................................................. 11
6.4 Chain container installation ............................................................................................ 11
6.5 Tools ................................................................................................................................. 12
7 Operation ........................................................................................... 12
8 Operation ........................................................................................... 13
9 Commissioning ................................................................................. 14
9.1 General ............................................................................................................................. 14
9.2 Power supply ................................................................................................................... 14
9.3 Load chain ........................................................................................................................ 15
9.4 Power operated hoists with chain container: ............................................................... 15
9.5 Adjustment - limit switch for lifting ................................................................................ 16
2
5.52.420.00.01.07
Page 3
9.6 Setting of the switching points ...................................................................................... 16
10 Safety check ..................................................................................... 16
11 Functional test .................................................................................. 16
11.1 Checks before the initial start-up................................................................................... 17
11.2 Functional test ................................................................................................................. 17
12 Maintenance ...................................................................................... 17
12.1 General ............................................................................................................................. 17
12.2 Monitoring ........................................................................................................................ 17
12.3 Replacing the load chain ................................................................................................ 17
12.4 Brake motor ..................................................................................................................... 19
12.5 Overload protection ........................................................................................................ 20
13 Inspection ......................................................................................... 20
13.1 General Overhaul for motor-driven units ...................................................................... 20
13.2 Periodic checks ............................................................................................................... 21
13.3 Checking the load chain ................................................................................................. 21
13.4 Checking the load hook .................................................................................................. 22
13.5 Checking the suspension eye ........................................................................................ 22
14 Service ............................................................................................... 22
14.1 Load chain ....................................................................................................................... 22
14.2 Pulleys .............................................................................................................................. 23
14.3 Load hook ........................................................................................................................ 23
14.4 Hoist gear ......................................................................................................................... 23
14.5 Trolley ............................................................................................................................... 24
14.6 Electric motor .................................................................................................................. 24
14.7 Lubricant selection ......................................................................................................... 24
14.8 Lubricant for food industry – selection (as option*) .................................................... 24
15 Trouble .............................................................................................. 24
16 Remedy ............................................................................................. 25
17 Decommissioning ............................................................................ 25
17.1 Temporary decommissioning ........................................................................................ 26
17.2 Final decommissioning/disposal ................................................................................... 26
18 Additional documents ...................................................................... 26
18.1 Electric wiring diagrams ................................................................................................. 26
18.2 Radio control (as option) ................................................................................................ 26
1 Information
The products meet European Union requirements, in particular the valided EU Machine Directive. The entire company works acc. to a certified quality assurance system as per ISO 9001. The production of components at our work is subject to strict, intermediate checks. After assembly, each product is subject to a final test with overload. For the operation of hoists, the national accident prevention regulations apply in Germany, amongst others. The stated performance of the devices and meeting any warranty claims require adherence to all instructions
in this manual. Before delivery, all products are packed properly. Check the goods after receipt for any damage caused
during transport. Report any damage immediately to the forwarding agent. This manual allows a safe and efficiently use of equipment. Images of this manual are for a principle
understanding and can be different from the real design.
NOTICE!
5.52.420.00.01.07
3
Page 4
We refer to the prescribed equipment tests before initial start-up, before putting back into operation and the regular periodic inspections.
In other countries any additional national regulations must be observed.
1.1 Indications to determine the used part of the theoretical usage life.
For motor driven units. The equipment (rope hoists, chain hoists, winches as well as crane hoisting units) are classified in drive
groups (duty classification) according to their intended mode of operation, running times and load collectives and dimensioned according to the requirements derived from these.
They are thus only designed for a limited period of use with regard to the overall dimensioning and certification.
After the total period of use as elapsed, measures must be taken where parts are checked and exchanged as per indication by the manufacturer. After that a new maximum usage period is determined. See also the valued accident prevention regulations, “winches, lifting and pulling devices”.
NOTICE!
Commitment
A general overhaul may only be performed by HADEF or by a specialized company, authorized by HADEF.
2 Safety
2.1 Warning notice and symbols
Warnings and notice are shown as follows in these instructions:
This means that there is a high risk that leads, if it is not avoided, to death or severe injury.
DANGER!
This means that there is a risk that could lead, if it is not avoided, to death or severe injury.
WARNING!
This means that there is little risk that could lead, if it is not avoided, to slight injury or damage to the device or its
CAUTION!
NOTICE!
surrounding.
Gives advice for use and other useful information.
Danger from electricity.
Danger from explosive area.
2.2 Duty of care of the owner
DANGER!
Failure to follow the instructions of this manual can lead to unpredictable hazards. For any resulting damage or personal injury, HADEF assumes no liability.
The unit was designed and built following a risk analysis and careful selection of the harmonized standards that are to be complied with, as well as other technical specifications. It therefore represents state-of-the-art technology and provides the highest degree of safety.
Our delivery includes the hoist supplied beginning at its suspension and ending at the load hook and if supplied with control, the control line/hose that leads to the hoist. Further operating material, tools, load attaching devices as well as main energy supply lines must be assembled according to the valid rules and regulations. For explosion-proof equipment, all these parts must be approved for use in area prone to explosion, or they must be suitable for use in area prone to explosion. The owner is responsible for this.
However, in everyday operation this degree of safety can only be achieved if all measures required are taken. It falls within the duty of care of the owner/user of the devices to plan these measures and to check that they are being complied with.
4
5.52.420.00.01.07
Page 5
Complete the operating and installation instructions by any instructions (regarding supervision or notifications) that are important for the special kind of use of the equipment, i.e. regarding organization of work, work flow and human resources.
In particular, the owner/user must ensure that:
The unit is only used appropriately. The device is only operated in a fault-free, fully functional condition, and the safety components, in
particular, are checked regularly to ensure that it is functioning properly.
The required personal protective equipment for the operators, service and repair personnel is available
and is used.
The operating instructions are always available at the location where the equipment is used and that they
are legible and complete.
The unit is only operated, serviced and repaired by qualified and authorized personnel. This personnel is regularly trained in all applicable matters regarding safety at work and environmental
protection, and that they are familiar with the operating manual and, in particular, the safety instructions it contains.
Any safety and warning signs on the devices are not removed and remain legible. Devices for use in area prone to explosion must (from customer's side) be earthed with a shunting
resistor of < 10
6
against earth.
WARNING!
It is not allowed to make constructive changes of the equipment!
2.3 Requirements for the operating personnel
The units may only be operated by qualified persons that are appropriately trained and that are familiar with it. They must have their employer’s authorization for operation of the units.
Before starting work, the operating personnel must have read the operating and installation instructions, especially the chapter "Safety Instructions".
This is especially important for operating personnel that rarely uses the equipment, i.e. for installation or maintenance work.
DANGER!
In order to avoid severe injury, please pay attention to the following when using the equipment:
Use protective clothes/equipment. Do not wear long hair hanging down open. Do not wear rings or other jewelry. Do not wear clothes that are too big/wide. Do not reach into ropes, chains, drive parts or other moving parts with your hands
2.4 Appropriate use
The permitted safe working load of the devices must not be exceeded! An exception can be made during the load test before initial operation, carried out by a licensed qualified person.
The permissible ambient temperature during operation of manual driven devices is -20 ° C / + 50 ° C and
at all power driven devices -20 ° C / + 40 ° C!
Defective devices and load suspension devices must not be used until they have been repaired! Only
original spare parts must be used. Non-compliance will result in any warranty claims becoming void. Liability and warranty will become void if unauthorized modifications of the units are made by the user! The appropriate use of the hoists is vertical lifting and lowering of unguided loads. In combination with
trolleys, loads can also be moved horizontally.
5.52.420.00.01.07
5
Page 6
DANGER!
It is not allowed:
pulling loose of stuck loads, dragging of loads and inclined pulling is not allowed. in explosive atmosphere, except the unit is especially modified for it and marked by an indication label In reactor containment vessels. to transport people The device is not suitable for use on stages and in studios persons must not stand under a suspended load
NOTICE!
If the units are not used appropriately, it is not possible to ensure safe operation. The owner and operator have sole liability for all personal injury and damage to property arising from
inappropriate use.
2.5 Basic safety measures
Observe installation-, operation and maintenance instruction. Take notice of caution notes at units and in the manual Observe safety distances. Take care for a free view on the load. Only use the hoists appropriately. The equipment is to be used exclusively for movement of goods. Under no circumstances my persons be
moved.
Never load the devices beyond their working load limit. Pay attention to the accident prevention regulations (UVV). Should the hoist be used outside of Germany, please pay attention to the national regulations that apply. Supporting structures and load-attached devices used in conjunction with this equipment must provide an
adequate safety factor to handle the rated load plus the weight of the equipment. In case of doubt, consult a structural engineer.
If the equipment has not been used for a period of time, carry out visual checks of all main components
such as chains, load hooks etc. and replace any damaged parts with new, original spare parts before putting the equipment back into operation!
Do not use a hoist that is defective, pay attention to any abnormal noise it makes during operation. Stop working immediately in case of disturbances and remedy failures. Any damage and faults must be reported to a responsible supervisor immediately. If the unit is put into motion, any persons in the immediate vicinity must be informed by calling to them! Please pay attention to the regulations for load carrying devices UVV for both positive and non-positive
methods of attaching loads.
The lifting tackle or the load must be securely attached to the hook and be seated at the bottom of the
hook.
The safety catch of hooks must be closed. When charged, the housing may not be in contact somewhere. Stop lowering the load when the bottom block or the load is being set down or is prevented from being
lowered further.
The load chain must not be twisted. Twisted chains must be aligned before attaching the load. The correct alignment of the chain links can be seen from the weld seams. The chain links must always be aligned in one direction. Don't bump against something with load or hook Check brakes daily before commencing work.
Illustration 1
6
5.52.420.00.01.07
Page 7
The devices are not suitable for continuous operation. The duty cycles of the motors (see the technical
data chapter) as well as the remaining life time of the equipment in accordance with FEM group and
usage (see calculation of remaining safe working period) must be observed.
WARNING!
The following is not allowed:
to lift another load than the nominal safe working load to manipulate the sliding clutch if units are equipped with The use of elongated or damaged chains or wire ropes. Replace them immediately by new, original
parts.
Never loop the load chain around a load nor place or pull the chain over edges. Never repair damaged load hooks (e.g. by hammering), but replace them by original hooks.
3 Trans port and Storage
CAUTION!
Transport may only be done by qualified personnel. No liability for any damage resulting from improper transport or improper storage.
3.1 Transport
The devices are checked and if so adequately packed before delivery.
Do not throw or drop the equipment. Use adequate means of transport.
Transport and means of transport must be suitable for the local conditions.
3.2 Safety device for transport
NOTICE!
Should a safety device for transport exist, please remove it before commissioning.
3.3 Storage
Store the equipment at a clean and dry place. Protect the equipment against dirt, humidity and damage by an appropriate cover. Protect hooks, wire ropes, chains and brakes against corrosion.
4 Description
4.1 Areas of application
The devices must be as far as possible installed in a covered room. If they are used in the open, protect the units against the effects of weather such as rain, hail, snow, direct
sunshine, dust, etc. - we recommend to use a cover in parking position. If the device is set up in a continuously humid environment with strong temperature fluctuations, the correct functionings are endangered by the forming of condensation.
Ambient temperature -20°C up to +50°C. Power-operated units -20 up to +40°C. Humidity 100 % or less but not under water
During longer periods of standstill, corrosion may reduce the function of the brake.
DANGER!
It is not permitted to use the unit in an area at risk from explosion!
5.52.420.00.01.07
7
Page 8
4.2 Design
HADEF electrical chain hoists are equipped with a suspension eye for stationary use. The one and two chain fall devices may optionally be equipped with a suspension hook.
All devices can also be supplied with monorail trolley with push travel, hand geared or electric drive.
Type 62/05 S, stationary
Type 62/05 R, with push travel trolley
Type 62/05 H, with gear travel trolley
Type 62/05 E, with electric travel trolley
Plan:
Chain falls
1/1 2/1
Operational limit switches for lifting and lowering
4.3 Functions
The lifting gear and motor-driven trolley are moved by pressing the buttons on the control switch. The spring­pressure brake installed in the electric motor of the lifting gear prevents the independent lowering of the load after the push button has been released.
By using a frequency converter, the speed is infinitely variable. Hand geared trolleys are moved to the left or right by pulling one of the two stands of the endless hand
chain. In combination with push travel trolleys the trolley is moved by pushing or pulling the load or, without load, by
pulling the load chain.
NOTICE!
The best protection against functional failures in case of extreme environmental impact is the regular use of the equipment.
If the hoist is not used very often, we recommend to carry out a test run at least once a week and to switch on the motor several times during this test run.
In our experience, this will prevent the brake from sticking.
4.4 Important components
Standard 3-phase current motor Hoist gear
precision spur gear All gears are fitted with vent screw. Trolley gear motor Combination of worm gear and motor. Closed design - ventilation not necessary Overload protection and emergency end limitation Hoist with overload protection Slipping clutch
8
5.52.420.00.01.07
Page 9
The overload control is set in the factory according to the regulations; it is possible to adjust it later from outside (see repair and maintenance section).
The slipping clutch prevents the lifting of a load that is too heavy by slipping through. In the standard design with direct control the slipping clutch also takes on the function of an emergency final limit when the load is at the highest and lowest position.
As an option the device can be supplied with an electronic overload control combined with a low voltage control.
WARNING!
Never exceed the nominal load! It is prohibited to use the emergency stop as operational limit switch.
NOTICE!
If it is necessary to approach the end stops during operation operating limit switches can be supplied (as an option). These can, however, only be used with low voltage control.
Load chain Special quality load chain. As the individual components of the chain drive are matched precisely to each
other, only original chains may be used. Load hook
The load hook, which is made of highly stable forged steel, has a ball bearing. This facilitates attaching the load and avoids the chain turning. The safety catch on the hook prevents the load from slipping out of the hook unintentionally. The safety catch of the load hook must be able to move freely and be self-closing.
Chain container The chain container is made of unbreakable plastic, plastic-coated fabric or sheet steel. It will supply different
sizes for different chain lengths. Control The electrical chain hoists are controlled as standard as follows: By direct control By low voltage control, optionally. A remote control is available as an option. Control switch
Control switch suitable for single hand use.
The control switch housing is made of shock- and fracture-proof plastic.
The control cable is fitted with a stress-relief rope (not applicable for radio control).
Plug-in connection for the control switch
Phase sequence- phase failure monitoring relay All devices with low voltage control are equipped with a phase sequence and phase failure monitoring relay
as a standard. This will prevent incorrect phase sequence when connecting to the mains supply and will switch off the device if phase failure occurs. In addition, all devices with low voltage control are equipped with thermal sensors to protect the lifting motor and end switches for lifting/lowering as a standard.
5.52.420.00.01.07
9
Page 10
5 Technical data
Capacity Type kg 125 250 250 500 1000 1000 2000 Chain falls 1 1 1 1 2 1 2 Duty classification FEM 9.511/ISO 4301 Chain dimensions mm 5x15 5x15 5x15 5x15 5x15 7x21 7x21 Lifting speed m/min 8/2 8/2 16/4 8/2 4/1 10/2,5 5/1,25 Motor power kW 0,18/0,05 0,36/0,09 0,75/0,18 0,75/0,18 0,75/0,18 1,9/0,45 1,9/0,45 Operating time ED % 100 60 100 40 40 30 30 Starting current A 2,5/0,64 4,7/1,15 9/1,7 9/1,7 9/1,7 21/4,5 21/4,5 Nominal current A 0,6/0,36 1,1/0,6 2,1/0,95 2,1/0,95 2,1/0,95 4,5/2,3 4,5/2,3 Starting - Cos f
Noise emission* db(A) 72 72 72 72 72 78 78
Weight **
Weight per m add. lift kg 0,54 0,54 0,54 0,54 1,08 1,1 2,2 Hand chain pull ~ H N 30 40 40 40 80 80 125 Travel speed E m/min 16/4 16/4 16/4 16/4 16/4 16/4 16/4 Travel motor power E kW 0,25/0,06 0,25/0,06 0,25/0,06 0,25/0,06 0,25/0,06 0,25/0,06 0,25/0,06 Travel speed E m/min 30/7,5 30/7,5 30/7,5 30/7,5 30/7,5 30/7,5 30/7,5 Travel motor power E kW 0,5/0,12 0,5/0,12 0,5/0,12 0,5/0,12 0,5/0,12 0,5/0,12 0,5/0,12 Wheel pressure max. *** kN 0,8 1,4 2,6 2,6 3,4 5,1 6,8
Beam flange width 1N Beam flange width 2N
*) 1m distance, tolerance +2dB(A) **)at 3m suspension or track height ***) Wheel pressure including the weight of hoist device and trolley at nominal load at 3m suspension height. Chains acc. special quality acc. Thechical requirements as EN818-7-T
3-phase current motor 400V/50Hz - IP55 – F – max. 1000 m above sea level. Order-related Special data, refer to the motor nameplate.
2m/M5 1Am/M4 1Am/M4 1Am/M4 1Am/M4 1Bm/M3 1Am/M4
0,88/0,8 0,88/0,8 0,88/0,8 0,88/0,8 0,88/0,8 0,88/0,8 0,88/0,8
S kg 30 30 33 33 33 54 54 R kg 37 37 40 40 47 68 75 H kg 44 44 47 47 54 75 93 E kg 62 62 65 65 65 83 103
R mm 64-152 64-152 64-152 64-152 64-190 64-190 88-190
H+E mm 50-179 50-179 50-179 50-179 50-179 50-179 66-185
R mm 153-310 153-310 153-310 153-310 191-310 191-310 191-310
H+E mm 180-310 180-310 180-310 180-310 180-310 180-310 186-310
6 Installation
6.1 Stationary hoist
Stationary designs are supplied with a suspension eye. A suspension hook is available as option. They are usually supplied assembled in full. In exceptional circumstances, the suspension eye/ suspension
hook is not assembled.
Suspension eye and suspension hook
fix the suspension eye (1) by two threated bolts
(2) at the provided fishplates (3) on top of the hoist housing
put on disc (4) fix nuts M10-10.9 (5) with tightening torque 49
Nm additionally protect the nuts with LOCTITE 243 Suspension hook installation in the same way.
Illustration 2
6.2 Adjusting the gauge
The trolley can be adjusted to various beam flange widths. Adjustment to the relevant beam flange width “B” depends on the type and size and is to be made as follows:
10
5.52.420.00.01.07
Page 11
There are distance tubes (5) and/or washers
(6) situated on the load bars (2) of the trolley.
Dimension "X" is set by placing washers (6)
from the outer to the inner side ("X" increases) or from the inner to the outer side ("X" decreases).
Washers (6) and rubber discs (depended on
type) leave a distance for the load hook. It is important that the load hangs in the middle under the beam so that the two side plates are equally loaded.
The suspension eye (9) (if existent) for bigger
load bolts must still be swivelling after it has been secured.
Tighten the hexagon nut (3) and safety nuts (4)
again.
Check correct flange width "B" and dimension
"X". Adjustment must be repeated if necessary.
1 side plates 2 load bars 3 hexagon nut 4 safety nuts 5 distance tubes 6 washers 7 --­8 rubber disc (depended on type) 9 suspension eye
6.3 Installation on the beam
1 Tighten the hexagon nut (3) and safety nuts (4). 2 Push on the trolley at the face of the beam flange. 3 If this is not possible, the trolley can also be mounted
on the beam from below.
4 Therefore, remove the hexagon nut (3) and the safety
nut (4) on the side without gear.
5 Pull apart the side plates (1) as far until it is possible to
push the trolley onto the beam flange from below. Afterwards, push the trolley together to correct gauge.
6 Secure the washers (6) and distance tubes (5) by
tightening the hexagon nuts (3) and the safety nuts (4).
CAUTION!
The distance "X" between the wheel flanges of the trolley wheels must exceed the flange width "B" of the beam by 2-3 mm (1-1,5 mm each side).
WARNING!
The hoist must always hang centrally under the beam or under its suspension point.
Illustration 3
6.4 Chain container installation
1 Chain container 2 Bolt 3 Safety clamp
suspend chain container (1) fix it by bolts (2) at the provided hole of box
and housing
protect it with safety clamps (3)
Illustration 4
CAUTION!
5.52.420.00.01.07
11
Page 12
If this is not observed it may damage the chain feed-in.
6.5 Tools
Tool Use
Load bar
7 Operation
Only people that are familiar with the operation of the lifting devices and cranes may be entrusted with their operation. They must be authorized by the employer for the operation of the equipment. The employer must ensure that the operating instructions are available near the equipment and that they are accessible for the operating personnel.
The shown control switches are only for the optical information. They can be different acc. the delivery.
Pendant control lifting/lowering direct control
1 Emergency-Stop 2 Lifting (slow - fast) 3 Lowering (slow - fast)
Illustration 5
Pendant control – 4 push buttons
1 Emergency stop 2 Selection switch (as option) 3 Lifting (slow - fast) 4 Lowering (slow - fast) 5 Trolley travel right side (slow - fast) 6 Trolley travel left side (slow - fast)
Illustration 6
12
5.52.420.00.01.07
Page 13
Radio control
1 Lowering (slow - fast) 2 Lifting (slow - fast) 3 Trolley travel left side (slow - fast) 4 Trolley travel right side (slow - fast) 5 Crane travel south (slow - fast) 6 Crane travel north (slow - fast) 7 no function 8 no function 9 start 10 start 11 emergency stop
Push button functions
Relieved push button = stand still push button half pushed = slow speed push button pushed completely = fast speed
Red Emergency-Stop button
button pushed = stand still turn the button clockwise = free functions
Illustration 7
Illustration 8
Illustration 9
CAUTION!
Run in of chain into the chain container for hoist with double lifting mechanism For a correct run in of chain into both chain containers, the lowering operation must be carried out, without
load, at certain intervals, until both chain container are empty.
For motorized devices with operating limit switches "lowering" Lower until the operating limit switch is released.
Non-observance can lead to device damages!
8 Operation
The following, important points must be observed when operating the equipment:
Read the safety instructions. Never load the devices beyond their working load limit. When changing the motor turning direction, allow the motor to come to a standstill first. The prescribed maintenance intervals must be adhered to. Observe the duty cycle, i.e. intermittent operation S4-40% ED (as per VDE 0530) means that in a period
of 10 minutes the motor can operate – no matter the height of the load – for 4 minutes. It is therefore irrelevant whether the 4 minutes are continuous (i.e., in case of very high lifting heights) or are made in intervals.
The lifting tackle or the load must be securely attached to the hook and be seated at the bottom of the
hook. The safety catch must always be closed.
5.52.420.00.01.07
13
Page 14
DANGER!
It is not allowed:
pulling loose of stuck loads, dragging of loads and inclined pulling is not allowed. in explosive atmosphere, except the unit is especially modified for it and marked by an indication label In reactor containment vessels. to transport people The device is not suitable for use on stages and in studios persons must not stand under a suspended load
9 Commissioning
9.1 General
Should the unit be used in Germany: Please observe the validated, national accident prevention regulations. For other countries: Inspections as above. Please observe the national rules and regulations and the instructions in this manual!
NOTICE!
Hoists up to 1000 kg capacity and without motor-driven trolleys of hoisting unit must be tested by a “qualified person” before putting into operation for the first time.
Hoists of 1000 kg capacity and up or with more than one motor-driven hoist movement; i.e. lifting and trolley movement, must be tested by a “licensed qualified person” before putting in operation.
An exception is “hoists ready for operation” acc. validated national regulations with EU-declaration of conformity.
Definition “qualified person” (former expert)
A “qualified person” has learned, due to occupational training and experience and the job that the person has done, the skills needed to tests the material for one’s work.
Definition “licensed qualified person” (former approved expert)
A “licensed qualified person” has, due through special occupational training, knowledge about testing of the material for one’s work and knows the national accident prevention regulations and other prescriptions and technical regulations. This person must test the material for one’s work regularly with regard to design and kind of use. The license will be given to qualified person be the approved supervision authorities (ZÜS).
9.2 Power supply
9.2.1 Mains connection
Hoist motor technical data can be found it in the "Technical data" chapter. The following tables show the assignment of the fuses at 400 Volt 3-phase current.
Select connection cross-sections as per VDE 0100. Put sleeves on the ends of the cables. Insert the connection cable into the connection plug without strain. Secure lines as per VDE 0100.
9.2.2 Control line connection
Pendant with cable and plug-in connection. Plug-in before use. Any changes of the power supply cable must only be effected by qualified personnel.
9.2.3 Power connection of the brake
The low-maintenance D.C. spring-pressure brakes are connected at the factory according to the wiring diagram.
14
5.52.420.00.01.07
Page 15
9.2.4 Wiring diagram
Wiring diagrams are situated in the terminal box or can be requested from HADEF by metioning of serial number.
9.2.5 Assigning line cross-sections and fuses
Motor output
up to
kW
3,9 10 58 97 155 232 388 620 969 5,9 16 36 60 97 145 242 388 606 8,4 20 29 48 77 116 194 310 485
8,9 25 23 38 62 93 155 248 388 11,9 32 18 30 48 72 121 194 303 18,5 35 16 27 44 66 110 177 277
-- 50 11 19 31 46 77 124 194
-- 36 9 15 24 37 61 98 154
9.3 Load chain
slow-blow
fuse
A
Cable cross-section mm2
Cable length up to …m
1,5 2,5 4 6 10 16 25
Before commissioning the load chain must be aligned and oiled. For the first commissioning of motorized hoists, chain oil is supplied with the delivery. Move safety note and fixing wire away from the chain.
9.4 Power operated hoists with chain container:
Due to the transport and / or installation of the hoist on the beam, the position of the load chain in the chain container can change unfavorably.
WARNING!
It is mandatory before the first commissioning:
that the complete load chain without load with the utmost care from the chain
container is driven
i.e. when lowering, pay special attention to the load chain on the chain container side,
so that the load chain can run properly through the hoist without being twisted
only after the chain container is completely empty, the load chain without load, can
be returned to the chain container
during the running in of the load chain, lubricate it over its entire length
CAUTION!
Do not use grease for lubrication of load chain. Without lubrication, manufacturer's warranty and/or liability will be void.
NOTICE!
Continuous, thorough lubrication will increase the life of the chain considerably.
5.52.420.00.01.07
15
Page 16
9.5 Adjustment - limit switch for lifting
If desired the chain hoist can be fitted with a limit
switch for lifting GTES 51-67 or GTES 51-180.
It allows to adjust any switching point desired, for
example the limit positions of upper and lower hook position. The slipping clutch incorporated in the hoist serves as emergency stop.
If the chain hoist is supplied with switch included,
a switching point for upper and lower hook position is preset.
The setting can be adjusted at the set screws 1
and 2 with a screw driver ø 4mm or 4mm hexagon socket screw key. The table shows the hook path for one turn of the set screw.
chain falls type of limit switch f or
1 GTES 51 - 67 <=9m 92 <=12m 130 2 GTES 51 - 67 <=4m 46 <=6m 65
125 kg/1 up to 1000 kg/2 1000 kg/1 and 2000 kg/2
lifting
GTES 51 - 180 >=9m 250 >=12m 350 GTES 51 - 180 >=4m 125 >=6m 175
hook path hook path per
turn of set screw
1 and 2
mm
A Adjustment with screw driver ø 4mm B set screw C Adapter D Chain sprocket shaft E Control cams
hook path
hook path per
turn of set screw
1 and 2
mm
9.6 Setting of the switching points
set screw 1 "switching point 1 (lifting)"
The switching point can be set at any desired point between upper and lower hook path limit. In order to adjust move the load hook to the desired position, which is possible by turning the set screw 1 to the left side. Afterwards turn the set screw 1 as far to the right side until the switching contact switches audible. 114 turns of the set screw mean 360° at the cam.
Drive two times into the desired hook position (1 creep speed, 2 main speed) and check the switching point, adjust if necessary. The load attaching device may not touch the housing and thereby activate the slipping clutch.
switching point 1 (lifting)
114 = 360°
switching point 2 (lowering)
114 = 360°
set screw 2 "switching point 2 (lowering)"
The switching point can be set at any desired point between upper and lower hook path limit. In order to adjust move the load hook to the desired position, which is possible by turning the set screw 2 to the right side. Afterwards turn the set screw 2 as far to the left side until the switching contact switches audible. 114 turns of the set screw mean 360° at the cam.
Drive two times into the desired hook position (1 creep speed, 2 main speed) and check the switching point, adjust if necessary. The chain attaching part may not touch the housing and thereby activate the slipping clutch.
10 Safety check
Before putting into service initially or when putting back into service, it must be checked whether:
All fastening screws (if existent), socket pins, flap socket and safety devices are tightened and secured. The oil levels in the gear boxes are sufficient. All movements of the load comply with the symbols on the control switch. The chains are correctly placed, oiled and in good condition.
11 Functional test
16
5.52.420.00.01.07
Page 17
11.1 Checks before the initial start-up
Lifting gear
Load chains must not be twisted. Lubricate the load chain with gear oil or suitable chain lubricant before first loading.
Trolley drive
The open-lying teeth of the trolley drive must be lubricated.
Hand gear for hand geared trolley
Ensure correct fit of the hand chain, it must not be twisted and must hang freely.
11.2 Functional test
Lifting gear
Check lifting and lowering functions, initially without a load. The buttons of the control switch are marked with the symbols for lifting and lowering. The movement direction of the load (lifting or lowering) must correspond with the push buttons (lifting or lowering). This is the factory setting.
If the device lowers when the “lift” button is operated and lifts when the “lower” button is operated, the two phases of the net connection must be swapped.
The function of the end switch is to be checked initially by operating the end switch by hand. Then carefully move to the end position. If required, adjust end switch.
Then check the brake function under load. After releasing the buttons of the control switch, the load must be securely held.
Trolleys
Carefully move the trolley to the end positions and check the positions of the end stops.
NOTICE!
The limit switch function will only work if the movement direction of the load (lifting - lowering) corresponds to the push buttons of the control switch.
12 Maintenance
12.1 General
All monitoring, servicing and maintenance operations are to ensure correct functioning of the equipment; they must be effected with utmost care.
Only “qualified persons” may do this work.
Servicing and maintenance work must only be done when the hoist is not loaded.
Records must be kept of all test results and measures taken.
12.2 Monitoring
The monitoring and servicing intervals stated are valid for operation under normal conditions and single-shift operation. In case of severe operating conditions (e.g. frequent operation with full load) or special environmental conditions (e.g., heat, dust, etc.), the intervals must be shortened correspondingly
12.3 Replacing the load chain
CAUTION!
If there is any visible damage and when the conditions for replacement are reached (i.e. one or several dimensions in the table have been reached, there is corrosion or elongation), the chain must be replaced.
When replacing the chain, also check the chain wheels.
5.52.420.00.01.07
17
Page 18
Procedure: Only insert new chains in an unloaded state and as the chains that are currently in the device – i.e. not
twisted.
Remove chain from its fastening at the end and attach a chain link which is open at the side. A chain link which is open at the side, can
easily be produced by grinding out a small piece. The opening must have the same thickness as the chain link.
Hang a new original chain (same size and oiled) in the side opened chain link and insert it. Make sure the chain is not installed twisted. Make sure the chain links are aligned in one direction. Assemble the chain to the end fastening.
Running of the chain into the chain container: Always run chains into the chain container by using the motor.
CAUTION!
Fill in the chain always motor driven. Never run the chain in by hand, as there is a risk of knotting which can cause malfunctions and damage to
the device.
Hoists – 1 or 2 fall version
1 sideways open chain link 2 chain welding seam 3 cylindrical pin 4 chain bolt 5 chain stop 6 split pin 7 pull-in aid (e.g. cable strap)
A chain fixing point
Pay attention of the position of welding seam (2) Use pull-in aid (7)
1-fall version (1/1)
open bottom block lay in the last chain link safe with cylindrical pin (3) assemble bottom block again
Tightening torque of screws for bottom block: M5 10.9 – 8Nm / M6 10.9 – 15 Nm
Illustration 10
Illustration 11
Illustration 12
18
5.52.420.00.01.07
Page 19
2-fall version (2/1)
put the chain through the bottom block, more
and more
fix the last chain link with bolt (4) at the fixing
point (A)
protect chain stop (5) by split pin (6) install chain container
The chain does not be twisted!
Tightening torque of screws at chain fixing point: M6 12.9 – 12 Nm
NOTICE!
Every chain replacement needs a replacing of the chain bolt/pin (3 or 4). Use only original bolts.
12.4 Brake motor
Illustration 13
Brake: 85 V DC
Nominal air gap
(mm)
0,2 0,6 8,5/5,5
Air gap
max. (mm)
Brake disc compl.
new / min.
(mm)
12.4.1 Assembling the brake
1 Insert the retaining ring (1) into the shaft slot. 2 Insert the feather key (2) into the motor shaft. 3 Fix hub (3) with retaining ring (1). 4 Assemble the friction plate (4) if existent. 5 Push the rotor (5) onto the hub (3). 6 Lock the magnet body with the 3 fastening
screws (6).
7 Set air gap “a” (refer to “adjusting the air gap”) 8 Assemble the dust-protection ring (7) if
existent.
9Electric connection
Illustration 14
12.4.2 Disassembly of the brake
Disassembly is performed in reverse order to the assembly.
5.52.420.00.01.07
19
Page 20
12.4.3 Adjusting the air gap
View "X" on the brake. 1 Loosen the locking screws (6) by half a turn. 2 Turn the cap screws (8) into the magnetic body
(9) anti-clockwise.
3 By turning the locking screws (6) clockwise,
move the magnetic body (9) towards the anchor plate (10) using a feeler gauge until nominal air gap “a” is reached (see table).
4 Unscrew the cap screws (8) from the magnetic
body clockwise.
5 Tighten the locking screws (6).
Illustration 15
6 Check the air gap again and re-adjust if
necessary.
12.5 Overload protection
If the hoist does not lift the permitted load, the overload protection must be adjusted. Adjustment may only be done by a service company, authorised by the manufacturer!
DANGER!
The factory setting of the overload protection is secured by a seal. Any guarantee becomes invalid if this setting is changed. Should maintenance be necessary, please contact a service company that is authorised by the manufacturer.
Depending on the type of hoist, the following variants are possible:
12.5.1 Slipping clutch
Illustration 16
12.5.2 Electronic hoisting power limiter (as option, except serial AT)
Power consumption of the hoist motor is measured during lifting movement of a load by an adjustable power measuring device (overload guard). The setting is made via a separate relay for main and creep lifting speed. Power consumption of the motor is load-dependent and increases with the load. If the set value is exceeded, the relay responds immediately and switches the motor off via switching elements. After the overload protection has been activated the LOWER button must be pressed first so that the LIFT function can be activated again. Before lifting again the load must be
Illustration 17
reduced to the nominal load!
13 Inspection
13.1 General Overhaul for motor-drive n units
The validated, national accident prevention regulations must be observed and the measures to reach "safe working periods (S.W.P.)" according to FEM 9.755.
After the "theoretical working time D" has been elapsed, the owner/user must take motor driven devices out of operation and effect a General Overhaul.
Further use of the equipment is only allowed after a licensed qualified person has proofed that further use is possible without doubt
and
the conditions for further use have been determined
20
5.52.420.00.01.07
Page 21
These conditions have to be written down in the test book.
The owner/user is responsible to make sure that these conditions are observed.
13.2 Periodic checks
Independently from the regulations of the individual countries, lifting devices must be checked at least yearly by a qualified person or licensed qualified person regarding its functional safety.
13.2.1 Components to be checked
The following must be checked:
Dimensions of load chain, load hooks, pawls, bolts, ratchet wheels, brake linings.
The dimensions must be compared to the dimensions in the tables.
A visual inspection for deformations, cracks and corrosion must be carried out.
13.2.2 Inspection intervals
Inspection of the equipment by a qualified person (periodic inspection) screw connections X X brake function - brake discs X X overload protection as slipping clutch (if relevant) overload protection by current cut-off (electric hoist) (if relevant) X X overload protection by air relieve valve (pneumatic hoist) (if relevant) load chain, clean and oil X X*) X X load chain, elongation and wear X load hook, cracks and deformation X Bearings of chain pulleys, check and lubricate Hoist gear, oil change X*) Trolley wheels, wear X Trolley wheels, lubricate toothed wheels X*) X*) X*) *) see chapter "maintenance"
at
commissioning
X
X X
X X
X
daily
checks
1st maintenance
after
3 months
Inspection
and
maintenance
every
3 months
Inspection
and
maintenance
every
12 months
Inspection
and
maintenance
every
36/60 months
13.3 Checking the load chain
CAUTION!
The load chain must be tested over its entire length! The measure of the load chain must be carried out especially in the areas which are subject to the highest
wear. Through the lifting movement, these are the contact points of the chain with sprocket wheel and deflection pulleys.
acc. DIN 685-part 5
L11 = pitch increase over 11 chain links
L1 = pitch increase over 1 chain link
Illustration 18
dm= detected link diameter (d1+d2)/2
Illustration 19
Chain dimensions
Dimension
5x15 7x21 9x27 11,3x31 16x45 23,5x66
mm L11 171,4 238,8 300,8 348,1 505,6 743,0
L1 16,0 22,4 28,1 32,7 47,4 69,5
dm 4,6 6,5 8,2 10,2 14,4 21,2
5.52.420.00.01.07
Chain dimension
21
Page 22
WARNING!
When the dimensions listed in the table are reached due to wear or deformation, the chain must be replaced!
13.4 Checking the load hook
Load hook
X = measuring distance hook mouth width Y = measured length from hook no. 6 H = thickness of hook saddle
Dimensions for load and suspension hook
Dimension
0,125-0,25 0,5 1 2
mm
Hook No. X resp. Y 24 28 37 40
H
012 025 05 1
19 24 31 40
Capacity in t
Illustration 20
Please fill in the measured
values before commissioning:
Capacity t
X bzw. Y mm
H mm
CAUTION!
When the dimension of hook opening width is deformed more than 10% or when the dimension of the hook bottom thickness is fallen short of by 5% due to wear, the hook must be replaced.
13.5 Checking the suspension eye
Dimensions for suspension eye
Dimensions
mm
Eye Ø 36 36 36 52 G min.
125-250 500/1 1000/2
12,5 12,5 12,5 22
Capacity in kg
1000/1 2000/2
If the dimension “G” will be underrun or cracks or damages are visible, interchange the suspension eye.
Please fill in the measured values before commissioning:
Capacity kg
Eye Ø mm
G
mm
14 Service
14.1 Load chain
Wear at the links is mainly due to insufficient maintenance of the chain. To ensure optimal lubrication of the links, the chain must be lubricated at regular intervals, depending on
usage.
Lubricate the chain with oil that creeps. Always lubricate the chain when it is not under load so that the oil can wet the links affected by wear. It is
not sufficient to lubricate the chain from the outside, as this will not ensure the formation of a lubricating film within the links. The adjacent link points must always be lubricated to prevent excessive wear.
If the same lifting operations are carried out constantly, the switching area from a lifting to a lowering
movement must be given special attention.
Thoroughly effected lubrication of the chain will prolong the life of the chain by approx. 20 times,
compared to dry run with unlubricated chain.
Wash dirty chain with petroleum or a similar cleaner, under no circumstances heat the chain. If there are environmental influences that foster wear, such as sand, a dry lubricant should be used, e.g.
graphite powder.
When lubricating the chain’s condition of wear should be checked.
22
5.52.420.00.01.07
Page 23
Use
Recommendation
oil for example: FUCHS RENOLIN PG 220
Load chain
or special chain lubricant Use NO grease!
CAUTION!
Do not use grease for lubrication of load chain. Without lubrication, manufacturer's warranty and/or liability will be void.
14.2 Pulleys
Use
Pulleys
Recommendation
FUCHS RENOLIN PG220
14.3 Load hook
Check bearings and pulleys yearly Clean and lubricate the bearings of hooks and pulleys with grease Slight bearings are maintenance free When bearings resp. slight bearings are worn of, change the complete pulley
Interval
0,2 l 3 month
Interval
Acc. to demand 12 month
Use
Load hook bearing
Recommendation
FUCHS RENOLIN PG220
Interval
Acc. to demand 12 month
14.4 Hoist gear
Low maintenance. Oil and grease life of the gear and of ball bearings is designed for the first safe operating period (S.W.P.)
of the chain hoist.
Shorter maintenance intervals for particularly difficult operating conditions, e.g. increased dust and
pollution loads or constant operation of the hoist with the highest load
Lubricant: synthetic, viscosity VG 220
A = Oil fill in or drain plug
Use
Spur gear
Illustration 21
Recommendation
FUCHS RENOLIN PG 220
125kg/1 = 1,1 l 250kg/1 = 1,1 l
500kg/1 = 1,1 l 1000kg/2 = 1,1 l 1000kg/1 = 1,6 l 2000kg/2 = 1,6 l
Interval
Exchange
lubricant
all 3 years
5.52.420.00.01.07
23
Page 24
4
4
Flub
A h
athe
4
oSta
4
D
L
u
5
e
o
o
obra
s
uGe
a
a
l
e
e
o
a
T
a
o
r
n
v
n
v
n
v
e
Alv
r
e
e
u
e
a
d
e
o
T
c
r
r
p
c
s
d
c
S
u
u
u
-
-
o
a
a
m
n
a
r
s
e
o
r
e
p
ARAL
S
S
S
t
o
a
p
t
t
o
a
a
0
0
0
2
K
t
0
0
1
M
b
r
a
n
u
n
h
e
d
c
a
2
t
p
p
m
i
e
.
o
T
2
n
m
O
A
G
e
e
,
e
r
t
Ü
n
n
n
e
-
g
e
l
1
.5 Trol
Trolleys ar
Lubricate g
U
e
P
lleys
ar rim
ive pinion
Dr
Tr
velling gea
If
vailable
1
.6 Elec
or the mot
rication stat
igh temper
ey
lifetime lub
ar rim and
tric motor
r it is suffi
us.
ture fat mu
icated, Refil
inion drive
ient to kee
t be used if
l lubricant is
ach ¼ year
the coolin
he roller be
normally no
or if require
Recom
FUCHS RENOLI
SHELL Tivela S3
g airways
ring is repl
t necessary.
more ofte
mendation
FEP2
0
lean and
ced.
, with greas
0,1
onitor the
.
kg
--
-
oller bearin
Interval
3 month
Life time
ubrication
and its
CAU
Br
ke linings
braking m
1
.7 Lub
FUCHS
Re
olin PG 220 Ti
Re
olin PG 320 Ti
Re
olin PG 460 Ti
R
nolit FEP2
Ren
lin B10 VG32 Te bylan 5006
1
.8 Lub
Gear G
riving gear G oad chain
Load hook
Pulley
Spur gear
Pinion
* m
st be mentioned
1
Tro
Pl
ase pay att
Troubles wi
Secure the
Put up a w
Secure the
Please rea
N
tes on the r
F
r the repair
ION!
nd surfaces ment consi
icant sele
SHELL E
ela S 20 Glycol ela S 320 Glygol ela S 460 Glygol ania EP2 Unire
llus Oil 32
--
icant for f
FUCHS
ralyn SF 220 C
ralyn SF 320 C
--
--
by order
ble
ntion to the th the equip unit against
rning note i
working are
the chapte
pair of fault f failures pl
must alway
s be clean
erably.
tion
SO
be 220 Degol G be 320 Degol G be 460 Degol G
x EP2 --
- --
- --
od indus
SHELL
ssida Fluid GL 220 ssida Fluid GL 220
--
FM Grease HD 2
following in
ent must o
unintended
dicating th
of moving
"Safety ins
are found i ase contac
MOBIL 220 Glygoyle 3 320 Glygoyle 32 460 Glygoyle 46
Mobilux EP
Chain lubricant O
y – selec
Glygoyle 22 Glygoyle 32
Lubricant FM
Mobilegrease F
case of pro
nly be repai
peration st
t the unit is
arts of the
ructions".
n the followi
our service
nd fat-free.
CARTER SY 2 0 -­0 --
MULTIS EP2
--
-­S 451
ion (as op
MOBIL
0 O 0 O
100 Opti
222
lems:
ed by qualif
rt.
ot to be us
nit.
ng table.
department
Even very s
TOTAL
0 --
--
--
Optimol Viscol
ion*)
CASTROL timol GT 220
timol GT 320 ol Viscoleb 1500
--
ed personn
d.
CASTR
lphasyn P
all amoun
L KL
-­ 460 Klübersy
--
-­b 1500 Klüberoil
Klübersynth Klübersynth
l.
Klübersy Klübersy
KLÜBER UH1 6-220 UH1 6-320
--
--
s of dirt can
ÜBER
th GH 6-220 th GH 6-320 th GH 6-460
--
--
4UH 1-1500
reduce
Tr
uble cause
ke parts, et
24
CAU
ION!
d by wear
., must be
r damage t
emedied by
parts suc
replacing th
as wire ro
parts with
pes, chains
riginal spar
chain whe
parts.
ls, axes, b
5.52.420
arings,
.00.01.07
Page 25
16 Remedy
Problem* Unit Cause Remedy
Unit cannot be switched on Electric Hoists
Electric Hoists
Hoist motor does not run
Pneumatic hoists and winches
For motor driven
Hoist motor runs – load is not lifted
chain hoists. and winches
Hoist motor is running – chain does not lower
Motor hums and uses excessive current
For motor driven chain hoists.
Electric hoists and winches
Electric hoists and winches
Motor does not brake or has excessive afterrunning.
For motor driven units.
Electric hoists and winches
Brake does not release
Pneumatic hoists and winches
Fuses burnt out or motor contactor is triggered
Electric hoists and winches
*) as far as applicable
No main power Check connection to mains supply Phase sequence not correct (with low voltage control)
exchange 2 phases
(see waring note at the plug)
Fuse burnt out Replace the fuse Defective switching unit in the control button switch Replace the switching unit Interruption in the control cable Check control cable and replace if necessary. Defect of capacitor (only for alternating current 1). Replace the capacitor Overheat protection has tripped* Allow engine to cool
Defective coil - mechanic or electric overload
Motor must be repaired by a specialist
If the unit is suitable for explosive atmosphere, the motor must be returned to the manufactuerer for repair!*
Operation pressure/ quantity of air is too low Check connection to mains supply After prolonged standstill See maintenance - pneumatic motor Overload protection is activated - (with overload) Reduce the load to nominal load
Overload protection is activated - (with =< nominal load)
No or incorrect power transmission
Blockage due to chain link pointing sideways in the feed from the chain container*
Defective coil Motor must be repaired by a specialist Rotor is rubbing
Check settings and reset if necessary Let the unit be repaired by en expert
For EX-hoists, please clarify with the manufacturer what to do!*
Check the chain - lubricate if necessary and/or select a larger chain container so that the chain can be properly arranged before the inlet
If the unit is suitable for explosive atmosphere, the motor must be returned to the manufactuerer for repair!*
Brake does not release See problem “Brake does not release” Defect of capacitor (only for alternating current 1). Replace the capacitor Defect of starter relay (only for alternating current 1). Replace the st arter relay Phase failure (only direct control) Find the cause and repair
Check the electric connection of the brake acc. to
Switching error after intervention in the electric circuit
the wiring diagram
Brake linings are worn or dirty.
Air gap is too large
Brake rectifier defective
Brake lining carrier must be changed completely
If the unit is suitable for explosive atmosphere, the brake must be returned to the manufacturer for repair!*
Re-adjust the air gap
If the unit is suitable for explosive atmosphere, the brake must be returned to the manufacturer for repair!*
Replace the brake rectifier
If the unit is suitable for explosive atmosphere, the brake must be returned to the manufacturer for repair!*
Brake current relay defective Replace the brake current relay Brake coil is defective
Replace the brake coil
If the unit is suitable for explosive atmosphere, the brake must be returned to the manufacturer for repair!*
Re-adjust the air gap and exchange the brake lining
Permissibe air gap is exceeded due to worn out brake lining
if necessary
If the unit is suitable for explosive atmosphere, the brake must be returned to the manufacturer for repair!*
Power drop in the mains power line > 10% Provide correct power supply voltage Operation pressure/ quantity of air is too low Check connection to mains supply Short circuit in component Eliminate the short circuit
Motor has a short circuit in the body or windings
Correct the problem by a specialist
For EX-hoists, please clarify with the manufacturer what to do!*
Motor is switched incorrectly Correct the switching Wrong type of fuse
Replace the fuse with correct one
(see table "fuses")
17 Decommissioning
WARNING!
It is essential that the following points are observed in order to prevent damage to the equipment or critical injury when the device is being decommissioned:
It is mandatory that all steps for decommissioning the machine are carried out in the indicated sequence:
First secure the working area for decommissioning, leaving plenty of space. Read the chapter "Safety instructions". Disassembly is carried out in reverse order to the assembly. Please make sure that all operating material is disposed of in accordance with environmental regulations.
5.52.420.00.01.07
25
Page 26
17.1 Temporary decommissioning
Measures are as above. Also read the chapter “Transport and storage”.
17.2 Final decommissioning/disposal
Measures are as above. After disassembly, ensure that the disposal of the equipment and any materials it contains is carried out
in accordance with environmental regulations.
18 Additional documents
18.1 Electric wiring diagrams
Electric wiring diagrams are attached to the consignment or included in the terminal box. Except for units supplied without control.
18.2 Radio control (as option)
Should the unit be fitted with radio control, a manual for radio control is attached to the consignment.
26