To install the slide rails, chassis rails, and mounting brackets to the switch, you can
choose the installation positions for these accessories. 利用滑道、滑道导轨配合挂耳将交换机安装到19英寸机柜时,可以根据需要调整附件在交换机上的安装位置。
Primary grounding point
(near the power modules)
主接地点(靠近电源侧)
The S6800-32Q provides a grounding sign at the primary grounding point, but does not
!
Auxiliary grounding point
(near the network ports)
备用接地点(靠近端口侧)
provide it at the auxiliary grounding point. S6800-32Q主接地点标有接地标识,备用接地点
上无接地标识。
The two grounding screws at the primary grounding point also apply to the auxiliary
grounding point.S6800-32Q主接地点上的两个接地螺钉同样适用于备用接地点。
1
2
Page 2
Attaching the accessories to the switch 安装附件到交换机
The installation positions of the accessories in the following figure are only for
illustration. Select proper installation positions based on the installation requirement.
以下图中附件的安装位置仅供参考,请根据实际安装场景的需要选择合适的安装位置。
Install the grounding cable before installing the switch to the rack. 为了防止机箱安装到
机柜后无法安装接地线,因此请先将接地线安装到交换机的侧面接地点上。
Installing the switch in a 19-inch rack 安装交换机到19英寸机柜
2
Install slide rails to the rack安装滑道到机柜
3
Mount the switch to the rack (two options) 安装交换机到机柜(二选一)
Near the power modules
挂耳在靠近电源侧安装位
Connect the other end of the grounding
cable to the grounding point on the rack
接地线另一端连接到机柜接地点
1
Install the cage nuts to the square holes of the rack 安装浮动螺母到机柜方
孔条上
Near the network ports
挂耳在靠近端口侧安装位
Connect the other end of the grounding
cable to the grounding point on the rack
接地线另一端连接到机柜接地点
3
4
Page 3
Airflow direction of the switch 交换机的风向设计
The S6800-32Q adopts the front-to-back airflow design. You can choose different fan
trays to direct airflow from port side to power module side or from power module side to
port side for different installation sites.
S6800-32Q采用前后风道设计,通过配置不同的风扇模块,可提供“端口侧到电源侧”
和“电源侧到端口侧”两种气流方向,满足不同环境下的散热要求。
Uses the LSWM1HFANSC fan tray
采用LSWM1HFANSC风扇模块
Uses the LSWM1HFANSCB fan tray
采用LSWM1HFANSCB 风扇模块
Installing and removing a fan tray 风扇模块的安装与拆卸
Before installing the fan tray, make sure the airflow direction marked on the fan tray meets
the ventilation requirement of the installation site. 安装风扇模块前,请根据风扇模 块的风
向指示,确认气流方向和安装环境的通风要求一致。
The switch comes with the two fan tray slots empty. You must install two fan trays of the
same model on the switch. Do not power on the switch when no or only one fan tray is
installed.交换机出厂时两个风扇插槽均为空,为保证设备的正常散热,用户必须安装两个
相同型号的风扇模块,否则禁止交换机上电运行。
If both fan trays fail when the switch is operating, finish replacing the fan trays within 2
minutes.交换机运行过程中,如果两个风扇模块均出现故障,则必须在2分钟内完成故障风
扇模块的更换。
If one fan tray fails when the switch is operating, replace the fan tray within 24 hours when
the ambient temperature is below 27°C (80.6°F). Do not remove the failed fan tray before
replacement. Replace the failed fan tray immediately when the ambient temperature is
above 27°C (80.6°F).交换机运行过程中,如果一个风扇模块出现故
Install a filler panel to the empty power module slot to ensure good ventilation and prevent
dust from entering the chassis.若电源模块插槽没有安装电源模块,请及时安装假面板,
以保证设备的良好通风散热并防止灰尘进入交换机。
Install and remove a fan tray风扇模块的安装与拆卸
2
1
Install a fan tray安装风扇
1
2
Remove a fan tray拆卸风扇
Install and remove a power module 电源模块的安装与拆卸
1
2
Install a power module安装电源Remove a power module拆卸电源
Install and remove a filler panel 假面板的安装与拆卸
Install a filler panel 安装假面板
Remove a filler panel 拆卸假面板
5
6
Page 4
Connecting the power cord 连接电源线
Before connecting the power cor d, connect the grounding cable and make s ure the switch is
!
reliably grounded. 在连接电源线前,需先连接保护地线,保证交换机正确接地。
Connect the power cord to the switch firs t a nd then to the power source to avoid b od ily inju ry .
连接电源线时,请先完成电源线与交换机侧的连接,再进行电源线与供电系统的连接,以免造
成人身伤害。
Connect the DC power cord
连接直流电源线
Connect the AC power cord
连接交流电源线
Use a cable tie to secure the power cord. The method for securing AC and DC power cords
are the same. The following figure uses the AC power cord as an example.