H3C S6800-32Q Installation, Quick Start

Page 1
H3C S6800-32Q Switch Installation Quick Start-6W106 H3C S6800-32Q交换机 快速安装指南-6W106
Tool list 工具参考
The installation tools are not provided with the switch. Prepare them yourself.
交换机不随机提供安装工具,请用户根据实际安装需求自己准备安装工具。
防静电腕带
Phillips screwdriver
十字螺丝刀
Installation accessories 安装附件介绍
Grounding cable
接地线
Chassis rail and slide rail
滑道和导轨
Grounding screw
接地螺钉
M4 screw
M4螺钉
Marker
记号笔
Mounting brackets
挂耳
Removable cable tie
可拆卸式扎带
Mounting bracket installatio n position( two options)挂耳安装位(二选一)
Near the network ports
安装在靠近端口侧
The switch provides three holes for installing mounting brackets near the network ports.
!
端口侧的挂耳安装孔只有三个。
Near the power modules
安装在靠近电源侧
Chassis rail installation position (two options) 滑道导轨安装位(二选一)
Near the power modules
靠近电源侧
Near the network ports
Grounding cable installation positio n (two options)接地线安装位(二选一)
靠近端口侧
Power module filler panel
电源假面板
Wear an ESD wrist strap, and make sure the wrist strap makes good skin contact and is
!
reliably grounded. 操作者需佩戴防静电腕带,确保防静电腕带与皮肤良好接触,并确认防
M6 screw and cage nut (user supplied)
M6 螺钉和浮动螺母(用户自备)
静电腕带已经良好接地。
Installation positions for accessories 附件安装位置介绍
To install the slide rails, chassis rails, and mounting brackets to the switch, you can choose the installation positions for these accessories. 利用滑道、滑道导轨配合挂耳 将交换机安装到19英寸机柜时,可以根据需要调整附件在交换机上的安装位置。
Primary grounding point
(near the power modules)
主接地点(靠近电源侧)
The S6800-32Q provides a grounding sign at the primary grounding point, but does not
!
Auxiliary grounding point
(near the network ports)
备用接地点(靠近端口侧)
provide it at the auxiliary grounding point. S6800-32Q主接地点标有接地标识,备用接地点 上无接地标识。
The two grounding screws at the primary grounding point also apply to the auxiliary grounding point.S6800-32Q主接地点上的两个接地螺钉同样适用于备用接地点。
1
2
Page 2
Attaching the accessories to the switch 安装附件到交换机
The installation positions of the accessories in the following figure are only for illustration. Select proper installation positions based on the installation requirement.
以下图中附件的安装位置仅供参考,请根据实际安装场景的需要选择合适的安装位置。
Install the grounding cable before installing the switch to the rack. 为了防止机箱安装到 机柜后无法安装接地线,因此请先将接地线安装到交换机的侧面接地点上。
Installing the switch in a 19-inch rack 安装交换机到19英寸机柜
2
Install slide rails to the rack安装滑道到机柜
3
Mount the switch to the rack (two options) 安装交换机到机柜(二选一)
Near the power modules
挂耳在靠近电源侧安装位
Connect the other end of the grounding cable to the grounding point on the rack
接地线另一端连接到机柜接地点
1
Install the cage nuts to the square holes of the rack 安装浮动螺母到机柜方 孔条上
Near the network ports
挂耳在靠近端口侧安装位
Connect the other end of the grounding cable to the grounding point on the rack
接地线另一端连接到机柜接地点
3
4
Page 3
Airflow direction of the switch 交换机的风向设计
The S6800-32Q adopts the front-to-back airflow design. You can choose different fan trays to direct airflow from port side to power module side or from power module side to port side for different installation sites. S6800-32Q采用前后风道设计,通过配置不同的风扇模块,可提供端口侧到电源侧电源侧到端口侧两种气流方向,满足不同环境下的散热要求。
Uses the LSWM1HFANSC fan tray 采用LSWM1HFANSC风扇模块
Uses the LSWM1HFANSCB fan tray 采用LSWM1HFANSCB 风扇模块
Installing and removing a fan tray 风扇模块的安装与拆卸
Before installing the fan tray, make sure the airflow direction marked on the fan tray meets the ventilation requirement of the installation site. 安装风扇模块前,请根据风扇模 块的风
向指示,确认气流方向和安装环境的通风要求一致。
The switch comes with the two fan tray slots empty. You must install two fan trays of the same model on the switch. Do not power on the switch when no or only one fan tray is installed.交换机出厂时两个风扇插槽均为空,为保证设备的正常散热,用户必须安装两个
相同型号的风扇模块,否则禁止交换机上电运行。
If both fan trays fail when the switch is operating, finish replacing the fan trays within 2 minutes.交换机运行过程中,如果两个风扇模块均出现故障,则必须在2分钟内完成故障风
扇模块的更换。
If one fan tray fails when the switch is operating, replace the fan tray within 24 hours when the ambient temperature is below 27°C (80.6°F). Do not remove the failed fan tray before replacement. Replace the failed fan tray immediately when the ambient temperature is above 27°C (80.6°F).交换机运行过程中,如果一个风扇模块出现故
障,则当环境温度不高于27℃时,必须在24小时内完成故障风扇模块的更换,且更换前必 须保持故障风扇模块在位;当环境温度高于27℃时, 请立即进行更换。
Install a filler panel to the empty power module slot to ensure good ventilation and prevent dust from entering the chassis.若电源模块插槽没有安装电源模块,请及时安装假面板,
以保证设备的良好通风散热并防止灰尘进入交换机。
Install and remove a fan tray风扇模块的安装与拆卸
2
1
Install a fan tray安装风扇
1
2
Remove a fan tray拆卸风扇
Install and remove a power module 电源模块的安装与拆卸
1
2
Install a power module安装电源 Remove a power module拆卸电源
Install and remove a filler panel 假面板的安装与拆卸
Install a filler panel 安装假面板
Remove a filler panel 拆卸假面板
5
6
Page 4
Connecting the power cord 连接电源线
Before connecting the power cor d, connect the grounding cable and make s ure the switch is
!
reliably grounded. 在连接电源线前,需先连接保护地线,保证交换机正确接地。 Connect the power cord to the switch firs t a nd then to the power source to avoid b od ily inju ry .
连接电源线时,请先完成电源线与交换机侧的连接,再进行电源线与供电系统的连接,以免造 成人身伤害。
Connect the DC power cord
连接直流电源线
Connect the AC power cord
连接交流电源线
Use a cable tie to secure the power cord. The method for securing AC and DC power cords are the same. The following figure uses the AC power cord as an example.
使用可拆卸式扎带固定电源线,以防止电源线脱落;直流电源线和交流电源线的固定方式相 同,此处以交流电源线为例介绍电源线的固定过程。
The information in this document is subject to change without notice.
Copyright © 2018 新华三技术有限公司 版权所有,保留一切权利
7
如需了解产品及安装方面的更多信息,请登录H3C网站 www.h3c.com
Copyright © 2018, New H3C Technologies Co., Ltd.
本文档中的信息如有更改,恕不另行通知
Loading...