Preparing the ground
In order to properly prepare the foundation for the anchor a hole of 70cm length x 50cm wide x 60cm deep has to be created. The anchor is then placed in the middle of the hole.
Anchor
70cm
50cm
60cm
Please note that the size of the hole depends on the consistency of the ground. If the ground has debris or is extremely soft the holes need to be prepared in slightly bigger dimensions of approximately 70cm x 70cm x 70cm
Tools needed for the holes
Pickaxe and Hoe Drilling Tools
Filling the hole with concrete
Slowly start filling the hole with concrete until it reaches ground level. Make sure that
you use ready made C20-25 concrete. For filling up the foundation of all the holes you would require approximately 1,5m³.
Make sure that the equipment fixing bolts are not covered by the
concrete.
(Fixing bolts)
Properly positioning the anchor and placing the main pole
In order to ensure an exact upright position (of the main pole), make sure that the anchor is in an absolute horizontal position using a level while concrete casting.
Please leave approximately 16 to 40 hours (depending on the climatic conditions) for the concrete to fully strengthen before attempting to place the main pole.
Prior to installing the main pole completely remove any remaining concrete or soil from the anchor’s surface.
Attach the main pole on the surface and tighten the bolts of the anchor.
Finalize the procedure by placing the yellow bottom cover over the base of the main pole.