Users manual on how to
Install and set up a GymPark
outdoor fitness equipment
![](/html/b2/b2fe/b2fe78a6bc7767554eec7b741e46e1a518b2e9200ecd537dceb655465d9ffe57/bg2.png)
Preparing the ground
In order to properly prepare the foundation for the anchor a hole of 70cm length x
50cm wide x 60cm deep has to be created. The anchor is then placed in the middle of
the hole.
Anchor
70cm
50cm
60cm
Please note that the size of the hole depends on the consistency of the ground. If
the ground has debris or is extremely soft the holes need to be prepared in slightly
bigger dimensions of approximately 70cm x 70cm x 70cm
Tools needed
for the holes
Pickaxe and Hoe Drilling Tools
![](/html/b2/b2fe/b2fe78a6bc7767554eec7b741e46e1a518b2e9200ecd537dceb655465d9ffe57/bg3.png)
Filling the hole with
concrete
Slowly start filling the hole with concrete until it reaches ground level. Make sure
that
you use ready made C20-25 concrete. For filling up the foundation of all the holes
you would require approximately 1,5m³.
Make sure that the equipment fixing bolts are not covered by the
concrete.
(Fixing bolts)
![](/html/b2/b2fe/b2fe78a6bc7767554eec7b741e46e1a518b2e9200ecd537dceb655465d9ffe57/bg4.png)
Properly positioning the anchor
and placing the main pole
In order to ensure an exact upright position (of the main pole), make
sure that the anchor is in an absolute horizontal position using a level
while concrete casting.
Please leave approximately 16 to 40 hours (depending on the climatic
conditions) for the concrete to fully strengthen before attempting to
place the main pole.
Prior to installing the main pole completely remove any remaining
concrete or soil from the anchor’s surface.
Attach the main pole on the surface and tighten the bolts of the anchor.
Finalize the procedure by placing the yellow bottom cover over the
base of the main pole.
16 to 40 hr