![](/html/47/473e/473e4eb6e9ae65978c41339d12599322aebcc2ae784980b8a8d29da1534abfca/bg1.png)
Grundig SAT SystEms
Distribution Amplifi ers
AR 5218
AR 5298
A
KLASSE
CLASS
GSS
Grundig SAT Systems GmbH
Assembly Instructions
English
Beuthener Straße 43
D-90471 Nuremberg
Phone: +49 (0) 911 / 703 8877
Fax: +49 (0) 911 / 703 9210
Email: info@gss.tv
Internet: http://www.gss.tv
![](/html/47/473e/473e4eb6e9ae65978c41339d12599322aebcc2ae784980b8a8d29da1534abfca/bg2.png)
1 Important information on safety and assembly
• Mount the amplifi er …
- on a non-fl ammable surface (wall),
- in a dust-free, dry environment,
- protected from moisture and water (rain or splashing water),
- at a place protected from direct sunlight,
- away from the immediate vicinity of heat sources,
- taking the maximum permissible operating temperature into account.
• Do not perform installation and service work during thunderstorms.
• Only install the unit when disconnected from the 230 V mains power supply.
• Check the coaxial cables for short circuits before starting. Eliminate any.
• No liability is accepted for any damage caused by a faulty connections and /
or inexpert handling.
• Observe all applicable standards, guidelines and directives (VDE0100,
VDE0185, VDE0855, VDE0860, DIN18015, EN61319-1, EN50083).
•
• Only open the cover on the mains adapter if the amplifi er is disconnected from
Earth the system via the equipotential bonding connector belonging to the building.
the mains.
• Dispose of the product after use as electronic waste in compliance with the applicable disposal regulations.
2 Technical description
The interactive multimedia capability distribution amplifi ers built into a die-cast housing are
for supplying small building units and CATV house-networks. Beside the adjustable amplifi er
they contain the diplex fi lter and the return channel amplifi er. The levels of the input signal
and of the return channel signal can be adjusted from 0 … -20 dB and the level of the line
equalization from 0 … 18 dB. The power supply is integrated in the amplifi er housing.
3 Assembly
Mount the distribution amplifi er in such a way …
–
back of the housing.
– that the permissible ambient temperature is maintained (measured in the air-
.
•
(screws: Ø ≤ 4.8 mm).
• Fasten the earthing line (Cu ≥ 4 mm
• Connect HF input and HF output.
that the convection cooler is not obstructed by the vertical cooling fi ns on the
stream below the housing).
Screw the distribution amplifi er onto the wall according to the dimensions in Fig. 1
2
) to the earthing connection A securely.
- 2 -