Grunbeck FE-Z 25/13, FE-Z 40/17, FE-Z 20/10, FE-Z 30/14, FE-Z 40/18 Operation Manual

...
 
Operation Manual
GENO-mat FE-Z
Deferrisation system
Deferrisation
GENO-mat FE-Z Deferrisation System
Table of contents
A General .................................................................................
1 Preface
2 How to use this operation manual 3 General safety information 4 Shipping and storage 5 Disposal
B Basic information ................................................................ 10
1 Laws, regulations, standards
2 Intended use/field of application 3 Function
C Product description ............................................................. 12
1 Type plate
2 Technical specifications 3 Intended use 4 Scope of delivery 5 Optional accessories 6 Consumables
D Installation and operation ................................................... 17
1 General installation information
2 Preliminary works 3 How to connect the system
E Start-up ................................................................................. 22
1 How to start up the system
F Operation .............................................................................. 23
1 How to operate the control unit
G Maintenance and care ......................................................... 26
1 Basic information
2 Inspection (functional check) 3 Maintenance 4 Spare parts 5 Operation log
5
Order no. 025 153 940-inter Edited by: nkes-mrie G:\BA-153940-INTER_025_GENO-MAT_FE-Z.DOC
2
Deferrisation
GENO-mat FE-Z Deferrisation System
 
All rights reserved.
© Copyright by Grünbeck Wasseraufbereitung GmbH
Printed in Germany Effective with the date of edition indicated on the cover sheet.
-We reserve the right to modifications, especially with regard to technical progress-
Reprints, translations into foreign languages, electronic storage or copying - even in part - of this operation manual are only permitted with the explicit written approval of Grünbeck Wasseraufbereitung GmbH.
Any type of duplication not authorised by Grünbeck Wasseraufberei­tung is a copyright violation and subject to legal action.
Responsible for contents:
Grünbeck Wasseraufbereitung GmbH Josef-Grünbeck-Str. 1  89420 Hoechstaedt/Do., Germany Tel. +49 (0) 9074 41-0 Fax +49 (0) 9074 41-100 www.gruenbeck.de service@gruenbeck.de
Print: Grünbeck Wasseraufbereitung GmbH Josef-Grünbeck-Str.1, 89420 Hoechstaedt/Do., Germany
Order no. 025 153 940-inter Edited by: nkes-mrie G:\BA-153940-INTER_025_GENO-MAT_FE-Z.DOC
3
Deferrisation
GENO-mat FE-Z Deferrisation System
EC Declaration of Conformity
This is to certify that the systems designated below meets the safety and health requirements of the applicable European guidelines in terms of its design, construction and execution.
If the systems are modified in a way not approved by us, this certificate is void.
Manufacturer: Grünbeck Wasseraufbereitung GmbH
Josef-Grünbeck-Str.1 89420 Hoechstaedt/Do., Germany
Responsible for documentation: Markus Pöpperl
Description of the device: Deferrisation system
Device type: GENO-mat FE-Z
Device no.: Refer to type plate
Applicable guidelines: Low Voltage (2014/35/EU)
EMC (2014/30/EU)
Applied harmonised standards in particular:
Applied national standards and technical specifications, in particular:
Place, date and signature: Hoechstaedt, 10.09.2018 p.p.
Function of signatory: Head of Technical Product Design
DIN EN 61000-6-2:2006-03 DIN EN 61000-6-3:2011-09
DIN 19636-100:2008-02
M. Pöpperl
Dipl.-Ing. (FH)
Order no. 025 153 940-inter Edited by: nkes-mrie G:\BA-153940-INTER_025_GENO-MAT_FE-Z.DOC
4
A General
Deferrisation
GENO-mat FE-Z Deferrisation System
1 | Preface
Thank you for opting for a Grünbeck product. Backed by decades of
experience in the area of water treatment, we provide solutions for all kind of processes.
Drinking water is classified as food and requires particular care. Therefore, always ensure the required hygiene in operating and maintaining systems involved in the drinking water supply. This also applies to the treatment of water for industrial use if repercussions for the drinking water cannot completely be excluded.
All Grünbeck systems and devices are made of high-quality materials. This ensures reliable operation over many years, provided you treat your water treatment systems with the required care. This operation manual assists you with important information. Therefore, please read the complete manual before installing, operating or maintaining your system.
Customer satisfaction is our prime objective. Providing customers with qualified advice is crucial to Grünbeck. If you have any ques­tions concerning this system, possible extensions or general water and waste water treatment, our field staffs, as well as the experts at our headquarters in Hoechstaedt, are available to help you.
For help and advice
please consult the representatives responsible for your region (see www.gruenbeck.de) or get in touch with our service centre which can be reached during office hours:
Phone: +49 9074 41-333
Fax: +49 9074 41-120
Email: service@gruenbeck.de
We can connect you with the appropriate expert more quickly if you provide the required system data. In order to have the required data handy at all times, please copy it from the type plate to the overview in chapter C-1.
Order no. 025 153 940-inter Edited by: nkes-mrie G:\BA-153940-INTER_025_GENO-MAT_FE-Z.DOC
5
Deferrisation
GENO-mat FE-Z Deferrisation System
2 | How to use this operation manual
This operation manual is intended for the operators of our systems.
It is divided into several chapters (a letter is assigned to each of them) which are listed in the “Table of contents” on page 2 in alpha­betical order. In order to find the specific information you are looking for, check for the corresponding chapter on page 2.
The headers and page numbers with chapter information make it easier to find your way around in the manual.
3 | General safety information
3.1 Symbols and notes
Important information in this operation manual is characterised by symbols. Please pay particular attention to this information to ensure the hazard-free, safe and efficient handling of the system.
Danger! Failure to adhere to this information will cause serious or life-threatening injuries, extreme damage to property or inadmissible contamination of the drinking water.
Warning! Failure to adhere to this information may cause injuries, damage to property or contamination of the drinking water.
Caution! Failure to adhere to this information may result in damage to the system or other objects.
Note: This symbol characterises information and tips to make your work easier.
Tasks with this symbol may only be performed by Grünbeck's tech­nical service/authorised service company or by persons expressly authorised by Grünbeck.
Tasks with this symbol may only be performed by qualified electrical experts according to the VDE guidelines or according to the guide­lines of a similar local institution.
Tasks with this symbol may only be performed by water companies or approved installation companies. In Germany, the installation company must be registered in an installation directory of a water company as per §12(2) AVBWasserV (German Ordinance on Gen­eral Conditions for the Supply of Water).
Order no. 025 153 940-inter Edited by: nkes-mrie G:\BA-153940-INTER_025_GENO-MAT_FE-Z.DOC
6
3.2 Operating personnel
3.3 Designated application
3.4 Protection from water damage
Deferrisation
GENO-mat FE-Z Deferrisation System
Only persons who have read and understood this operation manual are permitted to work with the system. The safety guidelines are to be strictly adhered to.
The system may only be used for the purpose outlined in the product description (chapter C). The guidelines in this operation manual as well as the applicable local guidelines concerning the drinking water protection, accident prevention and occupational safety must be ad­hered to.
In addition, appropriate application also implies that the system may only be operated when it is in proper working order. Any malfunctions must be repaired at once.
Warning! In order to properly protect the installation site from water damage:
a) a sufficiently dimensioned floor drain system must be available or
3.5 Indication of specific dangers
b) a water stop device (see chapter C Accessories) must be in-
stalled.
Danger due to electrical energy!  Do not touch electrical parts with wet hands! Disconnect the system from mains before starting work on electrical parts of the system. Have qualified experts replace damaged cables immediately.
Danger due to mechanical energy! System parts may be subject to overpressure. Danger of injury and damage to property due to es­caping water and unexpected movement of system parts. Check pressure pipes regularly. Depressurise the system before starting repair or maintenance work on the system.
Hazardous to health due to contaminated drinking water! The system may only be installed by a specialist company. The operation manual must be strictly adhered to! Ensure that there is sufficient flow. The pertinent guidelines must be followed for starting-up after extended periods of standstill. Inspections and maintenance must be performed at the intervals specified!
Note: By concluding a maintenance contract, you ensure that all of the required tasks are performed on time. You may perform the inter­im inspections yourself.
Order no. 025 153 940-inter Edited by: nkes-mrie G:\BA-153940-INTER_025_GENO-MAT_FE-Z.DOC
7
Deferrisation
GENO-mat FE-Z Deferrisation System
4 | Shipping and storage
Caution! The system may be damaged by frost or high tempera-
tures. In order to avoid damage of this kind:
Protect from frost during transportation and storage! Do not install or store the system next to objects which radiate a lot of heat.
The system may only be transported and stored in its original pack-
ing. Ensure that it is handled with care and placed the right side up (as indicated on the packing).
5 | Disposal
5.1 Packaging
5.2 Product
Comply with the applicable national regulations.
Dispose of the packaging in an environmentally sound manner.
If this symbol (crossed out waste bin) is on the product, Euro­pean Directive 2012/19/EU applies to this product. This means that this product and the electrical and electronic components must not be disposed of as household waste.
Find out about local regulations on the separate collection of electrical and electronic products.
Use the collection points available to you for disposing of your product.
For information on collection points for your product, contact your municipality, the public waste disposal authority, an au­thorised body for the disposal of electrical and electronic prod­ucts or your waste collection service.
Order no. 025 153 940-inter Edited by: nkes-mrie G:\BA-153940-INTER_025_GENO-MAT_FE-Z.DOC
8
Deferrisation
GENO-mat FE-Z Deferrisation System
B Basic information
1 | Laws, regulations, standards
In the interest of good health, rules cannot be ignored when it comes
to the processing of drinking water. This operation manual takes into consideration the current regulations and stipulates information that you will need for the safe operation of your deferrisation system.
Among other things, the regulations stipulate that
only approved companies are permitted to make major modifica-
tions to water supply facilities.
and that tests, inspections and maintenance on installed devices
are to be performed at regular intervals.
2 | Intended use/field of application
The GENO-mat FE-Z deferrisation systems are used for the oxida-
tion of dissolved iron in the raw water. The systems are used for pri­vate water supply plants up to maximum values of 3.0 mg/l of iron. If the systems are applied and operated according to the instructions, pure water values with a concentration of less than 0.1 mg/l of iron can be obtained.
The following requirements must be observed in order to obtain op­timum results:
Hydrogen sulphide and oil may not be detected in the water to be
deferrised.
Organic compounds should preferably not be contained in the
water; however, the maximum allowable value is 4 to 5 mg/l above the COD.
The oxygen concentration should be proportionally 15 % of the
existing iron concentration and the pH value must be higher than
7.0.
However, should ammonium (> 0.1 mg/l) be detected in the raw
water, an additional treatment step is required.
Should humic acids be contained in the well water, the pure wa-
ter quality to be expected might be affected.
Order no. 025 153 940-inter Edited by: nkes-mrie G:\BA-153940-INTER_025_GENO-MAT_FE-Z.DOC
9
Deferrisation
GENO-mat FE-Z Deferrisation System
3 | Function
3.1 Filters
3.2 Backwashing
3.3 First filtrate
The GENO-mat FE-Z deferrisation systems for the removal of iron work with an active insoluble catalytic filter material. A central control valve automatically controls the operating cycle’s filtration, backwash and first filtrate.
The raw water enters the exchanger tank via the raw water inlet and flows through the catalytic filter material from top to bottom. Thus the reaction of the oxygen with the iron contained in the water is accel­erated.
Bivalent iron is transformed into insoluble, filterable, trivalent iron (adding air sparingly might be required in order to improve the oxida­tion process). The filtered pure water is then directed via the lower distributing nozzle and the rising pipe through the pure water outlet into the piping system.
During the backwash process, the filter bed is forcibly flushed from bottom to top and thus loosened up. Impurities retained during the filtration process are washed out via the drain outlet at the control valve. The GENO-mat FE-Z deferrisation system must be back­washed every 6 days at the latest (for the setting refer to chapter F).
By an automatic switch-over of the central control valve, the filter bed will forcibly be flushed from top to bottom. This first filtrate is discharged to the drain and afterwards the deferrisation system is ready for operation once again.
3.4 Regeneration/ disinfection
3.5 Control unit
For operating and hygienic reasons, the deferrisation system must be regenerated every 6 months with the special granulate GENO­Spezialgranulat or GENO-oxi plus.
The GENO-mat FE-Z deferrisation systems are time-controlled via an electrical timer.
In order to properly use the automatic timer control, the time interval between two filter sequences (backwash interval in days) must be set.
Order no. 025 153 940-inter Edited by: nkes-mrie G:\BA-153940-INTER_025_GENO-MAT_FE-Z.DOC
10
Deferrisation
GENO-mat FE-Z Deferrisation System
C Product description
1 | Type plate
The type plate is located on the GENO-mat FE-Z control valve. Que-
ries and orders will be processed faster if you are able to provide the information listed on your system's type plate. Please copy the indi­cated information to the table below in order to have it readily avail­able whenever necessary.
GENO-mat FE-Z Deferrisation system
Serial number:       /
Order no.:      
Fig. C-1: Type plate GENO-mat FE-Z deferrisation system
Order no. 025 153 940-inter Edited by: nkes-mrie G:\BA-153940-INTER_025_GENO-MAT_FE-Z.DOC
11
Deferrisation
GENO-mat FE-Z Deferrisation System
2 | Technical specifications
The GENO-mat FE-Z deferrisation system is a single system with
integrated bypass for the supply of raw water during the backwash process. It is equipped with a timer control. The backwash is re­leased after a set time interval.
All system data are summarized on the reverse in table C-1. The data refers to the standard versions of the GENO-mat FE-Z deferri­sation systems. Possible deviations in case of special versions are listed separately, if applicable.
Caution! Electrically operated valves. In case of a power failure dur­ing the backwash, water may enter the drain. In case of power fail­ure, check the system and shut-off the water supply, if necessary.
Table C-1: Technical specifications GENO-mat FE-Z deferrisation system 20/10 25/13 30/14 40/17 40/18 50/19 60/20
Connection data
Nominal connection diameter DN 25 (1") DN 40 (1½“) Min. drain connection DN 50 DN 70 Nominal flow rate (depending on the iron
concentration) Power supply [V]/[Hz] 230/50 Connected load [VA] 10 Protection/protection class IP 54/
Performance data
Nominal pressure PN 10 Min./max. operating pressure [bar] 2.5/6.0 Pressure loss at nominal flow [bar] 0.5 1.1 1.0 1.1 1.0 0.8 1.1
Dimensions and weights1)
Total height [mm] 1360 1620 1620 1900 1900 1870 2100
Exchanger tank
Regeneration tank Height regeneration tank [mm] 840 1010 Connection height/raw water piping [mm] 1160 1420 1420 1710 1710 1680 1910 Connection height/pure water piping [mm] 1210 1470 1470 1735 1735 1705 1935 Distance to wall [mm] 200 230 280 280 300 365 405 Depth of foundation [mm] 400 450 500 500 550 600 650 Length of foundation [mm] 1850 1950 2050 2050 2100 2250 2350 Operating weight (incl. water) [kg] 50 85 150 200 240 425 580
Filling volumes and consumption data1)
Bottom filter layer I, quartz gravel 3.0 - 5.6T [kg] - - 25 25 25 50 50 Bottom filter layer I, quartz gravel 3.0 - 5.6T Bottom filter layer I, quartz gravel 3.0 - 5.6T
(dimension a)
Top filter layer II GENO-Ferrocat [l] 28 52 72 100 112 224 308 Top filter layer II GENO-Ferrocat
(dimension b)
Free board [l] 5 8 15 18 36 45 88
[m³/h] 1.5 2.0 3.0 4.0 5.0 6.0 8.0
[mm] 210 260 340 370 420 550 620
[mm] 465 680
[l]
- - 18 18 18 36 36
[mm] - - 1100 1400 1430 1320 1570
[mm] 290 360 270 460 570 390 520
Order no. 025 153 940-inter Edited by: nkes-mrie G:\BA-153940-INTER_025_GENO-MAT_FE-Z.DOC
12
Deferrisation
GENO-mat FE-Z Deferrisation System
Amount of regeneration agent required
Preparation amount [l] 302) 502) 602) 1002) 1002) 2002) 3002) GENO-oxi plus [l] 5 9 11 17 17 35 53 GENO-Spezialgranulat (special granulate) [g] 105 175 210 350 350 700 1050 Regeneration/disinfection interval Regeneration as required / disinfection
at the latest after 6 months Concentration of preparation [%] 0.35 Total waste water volume per regeneration
at 3 bar approx. Duration of washing out (regeneration) [min.] 30 Duration of backwash [min.] 10 Backwash capacity [m³/h] 1.6 3.4 5.7
Ambient data
Max. water temperature [°C] 30 Max. ambient temperature [°C] 40
Order no. 153 … 210 220 230 240 250 260 270
[m³]
1 1.3 1.7 2 2.7 3.4 5.4
Order no. 025 153 940-inter Edited by: nkes-mrie G:\BA-153940-INTER_025_GENO-MAT_FE-Z.DOC
13
Deferrisation
GENO-mat FE-Z Deferrisation System
Continuation Table C-1:
Spare filter fillings1)
GENO-Ferrocat (28 l per bag) 1x
170170
GENO-Ferrocat (4 l per bucket) - 6x
Quartz gravel SB 3.0 - 5.6 T (25 kg per sack)
1)
All indications are approximate.
2)
If the liquid product GENO-oxi plus is used, the GENO-oxi plus amount bust be subtracted from the preparation amount.
- - 1x
GENO-mat FE-Z deferrisation system
20/10 25/13 30/14 40/17 40/18 50/19 60/20
1x
170170
153610
Filter layer III Top
2x
170170
4x
153610
170208
3x
170170
4x
153610
1x
170208
4x
170170
- - -
1x
170208
8x
170170
2x
170208
11x
170170
2x
170208
Filter layer I Bot-
tom
Fig. C-2: Filling of filter layers
3 | Intended use
The system is adjusted to the water demand to be expected at the
installation site. It is not suitable for considerably differing perfor­mances. The maximum flow must not be exceeded under any cir­cumstances.
The system may only be operated if all components are installed properly. Safety devices must never be removed, bridged or other­wise tampered with.
Designated application of the system also implies that the infor­mation contained in these operating instructions and all safety guide­lines applying at the installation site be observed. Furthermore, the maintenance and inspection intervals have to be observed.
Order no. 025 153 940-inter Edited by: nkes-mrie G:\BA-153940-INTER_025_GENO-MAT_FE-Z.DOC
14
4 | Scope of supply
Deferrisation
GENO-mat FE-Z Deferrisation System
4.1 Basic configuration
Exchanger tank in double walled plastic housing.
Filter materials (gravel, GENO-Ferrocat, quartz gravel).
Control valve made of red bronze with integrated timer control.
Water test kit for iron.
Operation manual.
5 | Optional accessories
Note: It is possible to retrofit existing systems with optional compo-
PE tank 100 litre or 300 litre with litre scale and hand mixer to pre-
nents. Please contact your local Grünbeck representative or Grünbeck’s headquarters in Hoechstaedt for details.
pare the regeneration solution. Tank has integrated suction device.
Regeneration device 100 litre
(FE-Z 20/10 – FE-Z 40/18)
Regeneration device 300 litre
(FE-Z 50/19 – FE-Z 60/20)
153 094
153 095
Mounting kit 1:
for convenient hydraulic connection, Compact valve block R 1’’ internal thread, integrated bypass with shut-off valve, shut­off valves for hard and soft water, outlet for raw water (e.g. garden hose), 2 connection hoses
Mounting kit R 1“ (up to size 30/14) 125 845
6 | Consumables
6.1 Oxidising agents for the regeneration/disinfection of deferrisation systems
Only use genuine consumables in order to ensure the reliable opera­tion of the system.
GENO-Spezialgranulat1) (1 kg) 170 016
GENO-Spezialgranulat1) (5 kg) 170 017
GENO-oxi plus (20 kg/19.7 litre) 170 029
1)
Note: Registration by the Federal Surveillance Authority for Opium
according to the Controlled Substances and Precursors Act required.
Order no. 025 153 940-inter Edited by: nkes-mrie G:\BA-153940-INTER_025_GENO-MAT_FE-Z.DOC
15
Deferrisation
GENO-mat FE-Z Deferrisation System
6.2 Test device for iron measuring range 0.0 mg/l - 0.8 mg/l or 1.0 mg/l - 10.0 mg/l respectively
For the quantitative, colorimetric determination of dissolved iron in the measuring range of 0.0 mg/l – 0.8 mg/l respectively
1.0 mg/l – 10 mg/l. Quick test kit consisting of:
Iron test device 1 test glass with 3 chambers and scale;
Test tablets (0.0 mg/l-0.8 mg/l) 30 tablets;
Test tablets (0.1 mg/l-10 mg/l) 30 tablets;
6.3 Spare filter filling, complete
Refer to table C-1 „Technical specifications“
6.4 Wearing parts
In case of heavy duty, seals and control pistons are subject to a cer­tain wear and tear. Wearing parts are listed below.
Note: Although these are wearing parts, we grant a limited warranty
period of 6 months. The same applies for electrical components.
Seals, control piston, injector, actuator
170 150
Fig. C-3: Control valve Nominal connection diameter DN 25 (1“)
Fig. C-4: Control valve Nominal connection diameter DN 40 (1½“)
Order no. 025 153 940-inter Edited by: nkes-mrie G:\BA-153940-INTER_025_GENO-MAT_FE-Z.DOC
16
D Installation and operation
1 | General installation instructions
Deferrisation
GENO-mat FE-Z Deferrisation System
The installation site must provide adequate space. A foundation of a sufficient size and adequate carrying capacity must be provided. The required connections must be provided prior to the installation. For dimensions and connection data, please refer to table D-1.
Table D-1: Installation data GENO-mat FE-Z deferrisation system
Connection data
Nominal connection diameter DN 25 (1") DN 40 (1½“) Min. drain connection DN 50 DN 70 Nominal flow rate (depending on the iron
concentration) Power supply [V]/[Hz
Connected load [VA] 10 Protection/protection class IP 54/
Dimensions and weights1)
Total height [mm] 1360 1620 1620 1900 1900 1870 2100
Exchanger tank
Regeneration tank Height regeneration tank [mm] 840 1010 Connection height/raw water piping [mm] 1160 1420 1420 1710 1710 1680 1910 Connection height/pure water piping [mm] 1210 1470 1470 1735 1735 1705 1935 Distance to wall [mm] 200 230 280 280 300 365 405 Depth of foundation [mm] 400 450 500 500 550 600 650 Length of foundation [mm] 1850 1950 2050 2050 2100 2250 2350 Operating weight (incl. water) [kg] 50 85 150 200 240 425 580
1)
All indications are approximate.
[m³/h] 1.5 2.0 3.0 4.0 5.0 6.0 8.0
20/10 25/13 30/14 40/17 40/18 50/19 60/20
230/50
]
[mm] 210 260 340 370 420 550 620
[mm] 465 680
Note: For the installation of systems with optional accessories (see
chapter C, item 5), also observe the operation manuals supplied with these components.
Order no. 025 153 940-inter Edited by: nkes-mrie G:\BA-153940-INTER_025_GENO-MAT_FE-Z.DOC
17
Deferrisation
GENO-mat FE-Z Deferrisation System
1.1 Water installation
When installing the GENO-mat FE-Z deferrisation system, certain rules must be strictly complied with. Additional recommendations are given in order to facilitate the handling of the systems. The installa­tion information described below is also illustrated in fig. D-2.
Binding rules
The installation of the GENO-mat FE-Z deferrisation system repre­sents a major interference with the drinking water system. Therefore, only authorised experts may install such systems. In Germany, the installation company must be registered in an installation directory of a water company as per §12(2) AVBWasserV (German Ordinance on General Conditions for the Supply of Water).
1.2 Electrical installation
Observe local and general installation guidelines.
Provide a drain connection to discharge the backwash water.
The installation room must have a floor drain (DN 100). If no floor
drain is available, a corresponding water stop device has to be in­stalled.
Observe the flow direction!
Recommendations
Provide a sampling valve and a pressure gauge directly upstream
and downstream of the GENO-mat FE-Z deferrisation system (0 ­10 bar). This simplifies the sampling for the regular determination of the iron concentration (functional check).
A shock-proof plug is adequate for the electrical connection. Howev­er, it must comply with the specifications given in table D-1, may not be further than 1.20m away from the GENO-mat FE-Z deferrisation system and must carry constant voltage (do not couple with light switch)!
Order no. 025 153 940-inter Edited by: nkes-mrie G:\BA-153940-INTER_025_GENO-MAT_FE-Z.DOC
18
2 | Preliminary Work
Deferrisation
GENO-mat FE-Z Deferrisation System
1. Unpack all system components.
2. Check for completeness and perfect condition.
3. Place the filter tank at the designated location.
Extract from Table D-1
Table D-2: Fill volumes
Filling volumes and consumption data
Bottom filter layer I, quartz gravel 3.0 - 5.6T [kg] - - 25 25 25 50 50 Bottom filter layer I, quartz gravel 3.0 - 5.6T Bottom filter layer I, quartz gravel 3.0 - 5.6T
(dimension a) Top filter layer II GENO-Ferrocat [l] 28 52 72 100 112 224 308 Top filter layer II GENO-Ferrocat (dimension
b) Free board [l] 5 8 15 18 36 45 88
1)
All indications are approximate.
1)
GENO-mat FE-Z deferrisation system
20/10 25/13 30/14 40/17 40/18 50/19 60/20
[l]
- - 18 18 18 36 36
[mm]
[mm] 290 360 270 460 570 390 520
- - 1100 1400 1430 1320 1570
Centre rising pipe, Fill with filter material
Remove protective cap, secure control valve
Filter layer III Top
Filter layer I Bottom
Fig. D-1: Filling of filter layers
1. Fill filter tank up to 50 % with water.
2. Check whether the rising pipe is covered by a protective cap, plug on the protective cap, if necessary. The protective cap prevents material from entering the rising pipe.
3. Centre the filter tank in the rising pipe.
4. Centre the rising pipe in the filter tank. Use the funnel supplied with the system (refer to figure). Refer to Table D-2 for fill volumes.
5. Fill up the filter tank with water
6. Centre the rising pipe properly and exactly.
7. Clean the filter tank’s screw thread and the sealing surface for the connection of the control valve from any filter material that might be clinging to them.
8. Remove the protective cap from the rising pipe.
9. Put the control valve from above onto the rising pipe and fasten it by turning it to the right.
Order no. 025 153 940-inter Edited by: nkes-mrie G:\BA-153940-INTER_025_GENO-MAT_FE-Z.DOC
19
Deferrisation
GENO-mat FE-Z Deferrisation System
3 | How to connect the system
1. Establish water connection as described in the erection drawing (fig. D-2 (a) (b) while observing the guidelines and recommenda­tions given in section 1.
Raw water
Pure water
Grünbeck‘s limits of supply diagram
Pump (provided by others)
Membrane expansion vessel
(provided by others) Pressure gauge inlet pressure
(by others on site)
Fig. D-2 (a) : Erection drawing GENO-mat
Dimensions in Fig. D-2 (a); Extract from table D-1
Dimensions and weights1)
A Total height [mm] 1360 1620 1620 1900 1900 1870 2100
B Exchanger tank
C Regeneration tank D Height regeneration tank [mm] 840 1010 E Connection height/raw water piping [mm] 1160 1420 1420 1710 1710 1680 1910 F Connection height/pure water piping [mm] 1210 1470 1470 1735 1735 1705 1935 G Distance to wall [mm] 200 230 280 280 300 365 405 H Foundation depth [mm] 400 450 500 500 550 600 650 I Foundation length [mm] 1850 1950 2050 2050 2100 2250 2350 K Operating weight (incl. water) [kg] 50 85 150 200 240 425 580
1 )
All indications are approximate.
Regeneration tank
for deferrisation (option) Sampling valve
(by others on site) Control valve operating voltage
FE-Z deferrisation system
GENO-mat FE-Z deferrisation system
20/10 25/13 30/14 40/17 40/18 50/19 60/20
[mm] 210 260 340 370 420 550 620
[mm] 465 680
GENO-mat FE-Z deferrisation
system incl. filter material Pressure gauge outlet pressure
(by others on site)) Drinking water filter BOXER K
Order no. 025 153 940-inter Edited by: nkes-mrie G:\BA-153940-INTER_025_GENO-MAT_FE-Z.DOC
20
GENO-mat FE-Z Deferrisation System
Caution! Dirt and corrosion particles might damage the system (control valve). Flush the supply pipe prior to start-up.
2. Establish waste water connection as per DIN EN 1717. Shorten the rinse water hose to the correct length and guide it to the drain. Ensure there is a free outlet (min. 20mm) to the drain. Secure the hose with suitable fittings to prevent the hose from moving about (regeneration water is pressurised).
Caution! Danger of damage and malfunctions due to a waste water backflow. Therefore, do not bend the hose and do not lead it higher than the system height.
3. Connect the mains plug to the socket (cf. 1.2).
4. Water the system In order to prevent the filter material from being washed out, it must be watered for 24 hours.
Deferrisation
Fig. D-2 (b): GENO-mat FE-Z deferrisation system, rear view
Control valve
Filter tank
Drain connection
Raw water inlet
Raw water outlet
Order no. 025 153 940-inter Edited by: nkes-mrie G:\BA-153940-INTER_025_GENO-MAT_FE-Z.DOC
21
Deferrisation
GENO-mat FE-Z Deferrisation System
E Start-up
The work described below may only be performed by trained ex­perts. We recommend having the start-up performed by Grünbeck’s technical service/authorised service company.
Warning! Danger of contamination due to stagnation! According to VDI 6023, filling the system with drinking water before normal opera-
1 | How to start up the system
tion commences is prohibited.
The GENO-mat FE-Z deferrisation system must therefore must only first be connected to the drinking water system immediately prior to commissioning.
1. Open the valve at the raw water inlet.
2. Open the valve at the pure water outlet.
3. Perform a visual check. Ensure that no water leaks from the sys­tem anywhere.
4. Rinse out fine particles The filter material contains a small amount of fine particles which must be flushed by means of a backwash prior to start-up. Re­lease a manual regeneration (refer to chapter F, item 1.4).
Note: The backwash process must be repeated until the backwash
water that flows to the drain in the process step „first filtrate“ is clear.
5. Take a water sample at the sampling valve downstream of the system.
6. Determine the iron concentration by means of the water test kit.
7. Fill in the cover sheet and column 1 in the operation log.
Order no. 025 153 940-inter Edited by: nkes-mrie G:\BA-153940-INTER_025_GENO-MAT_FE-Z.DOC
22
F Operation
1 | How to operate the control unit
Deferrisation
GENO-mat FE-Z Deferrisation System
1.1 How to set the time
1.2 How to set the backwash interval
The control unit regulates the operation of the deferrisation system.
The GENO-mat FE-Z systems are factory-set in a way that the au­tomatic regeneration is always released at 02:00 (at night). Upon start-up or after a power failure, the current time must be set.
1. Loosen the screw at the housing cover (top right).
2. Open the housing cover.
3. Press and hold the red button (Fig. F-1, Item 6).
4. Turn the 24 hour disk until the reference arrow (Fig. F-1, Item 2) points to the current time.
5. Release the red button (Fig. F-1, Item 6).
Note: In case the preset time for the backwash (02:00) should be unfavourable for internal reasons, set a time which deviates from the current time at the 24 hour disk in order to adjust the starting time for the backwash.
Example: Desired starting time of the backwash: 22:00 Move clock forward 4 hours.
The maximum backwash interval is 12 days. Furthermore, an auto­matic backwash can be carried out after 6, 4, 3, 2 or 1 day(s) (fac­tors of 12). Fig. F-1 indicates the setting for a backwash to be car­ried out every 2 days.
1. Determination of the backwash interval.
For hygienic reasons, a backwash should be carried out every 6
days (factory-setting).
If the differential pressure of the filter is > 0.3 bar above normal
after 6 days due to a higher concentration of dirt in the water, a backwash process should be initiated every 4 days or at even shorter intervals.
The same applies in case of an early breakthrough of dirt parti-
cles.
Order no. 025 153 940-inter Edited by: nkes-mrie G:\BA-153940-INTER_025_GENO-MAT_FE-Z.DOC
23
Deferrisation
GENO-mat FE-Z Deferrisation System
Backwash wheel
Hour wheel
Reference arrow (red)
Day disk
Steel switching pin (in home position
moved to centre point, in switch position moved outwards)
Fig. F-1: Control unit and operating elements „front view“
2. Push the switching pin (Fig. F-1, Item 5) outwards for the 1st day.
 
3. Set the other switching pins as required. On all days where the switching pins are pushed outwards, the backwash is released. In order to set, for example, a backwash in­terval of 3 days, the switching pins in positions 1, 4, 7 and 10 on the day disk must be pushed outwards (Fig. F-1, Item 4).
Button to set the time
Reference arrow for current time and operating state (black)
Reference point for operating state (white)
Order no. 025 153 940-inter Edited by: nkes-mrie G:\BA-153940-INTER_025_GENO-MAT_FE-Z.DOC
24
1.3 Reading the operating status
Deferrisation
GENO-mat FE-Z Deferrisation System
The current operating state may be read from the position of the ref­erence point (Fig. F-1, Item 8) on the backwash wheel (Fig. F-1, Item
1).
The reference point (Fig. F­1, Item 8) lies opposite the reference arrow (Fig. F-1, Item 7).
All other settings from the reference point (Fig. F-1, Item 8).
The day disk (Fig. F-1, Item 4) turns counter-clockwise once in 12 days. The red reference arrow (Fig. F-1, Item 3) points to the posi­tion where a switching pin turned outwards releases a backwash. In the operating mode, the distance between the reference arrow (Fig. F-1, Item 3) and the following switching pin which is turned outwards is an indication for the number of days until the next backwash.
1.4 How to release a manual backwash
Manual regeneration should be released if
the differential pressure of the deferrisation system is more than
0.3 bar above normal before the timer control releases the back­wash.
Operating mode: pure water is available.
Backwash; the backwash wheel (Fig. F­1, Item 1) turns clockwise; the progress of the backwash can be read from the position of the reference point (Fig. F-1, Item 8).
the systems are restarted after longer periods of standstill.
maintenance or repair work has been carried out.
Irrespective of the set backwash interval and the time, the backwash can be released manually at any time.
1. Check operating state.
Only in operating mode:
2. Turn backwash wheel (Fig. F-1, Item. 1) to the right by one catch (pay attention to the snap!).
The deferrisation system starts the backwash process, the back­wash wheel (Fig. F-1, Item 1) slowly turns clockwise. After approx. 3 hours, the backwash is terminated and the white reference point (Fig. F-1, Item 8) is located opposite of the black reference arrow for the current time again (Fig. F-1, Item 7).
Order no. 025 153 940-inter Edited by: nkes-mrie G:\BA-153940-INTER_025_GENO-MAT_FE-Z.DOC
25
Deferrisation
GENO-mat FE-Z Deferrisation System
G Maintenance and care
1 | Basic information
In order to guarantee the reliable function of the GENO-mat FE-Z deferrisation systems over a long period of time, some maintenance work has to be performed at regular intervals. This applies in particu­lar to the backwash in the drinking water sector where the required measures are defined in the pertinent regulations and guidelines. All regulations and guidelines which apply at the installation site must be strictly adhered to.
DIN EN 806-5 stipulates:
Inspection every 2 months
Maintenance every 6 months
Maintenance must be performed by the Grünbeck’s customer
service/authorised service company or by a specialised company.
An operation log must be kept in order to document the mainte-
nance work performed.
Note: A maintenance contract ensures that all the required mainte­nance work will be performed in due time.
The operation log is attached to this operation manual.
2 | Inspection (functional check)
You may perform the regular inspections yourself.
Summary: Inspection work
Determine inlet water (iron concentration).
(Water test kit)
Determine pure water (iron concentration).
(Water test kit)
Differential pressure of the system
Check controller settings:
a) Time b) Check backwash interval
Order no. 025 153 940-inter Edited by: nkes-mrie G:\BA-153940-INTER_025_GENO-MAT_FE-Z.DOC
26
Deferrisation
GENO-mat FE-Z Deferrisation System
Note: Minor deviations are normal and cannot be prevented techni-
cally. If you detect major deviations, please contact Grünbeck’s cus­tomer service/authorised service company.
3 | Maintenance
Check the entire system for outward tightness.
Check control valve to drain for tightness (in operating mode).
Maintenance work on the GENO-mat FE-Z deferrisation systems may only be performed by Grünbeck’s technical service/authorised service company or by an approved specialist.
An operation log must be kept for GENO-mat FE-Z deferrisation sys­tems. In this operation log, the customer service technician records all maintenance and repair work performed. In case of malfunctions, this log helps to identify possible sources of error. In addition the log documents the proper system maintenance.
Make sure that all maintenance work is recorded in the operation log.
Summary: Maintenance work
Read water pressure, flow pressure and if necessary water meter
reading.
Determine iron concentrations.
Check release of backwash.
Check control valve for tightness, replace wearing seals if neces-
sary, check the proper function of the drive motor of the control valve, clean injector and sieve.
Regenerate and disinfect the system.
Check the level of the filter material in the filter tank. Refill filter
material, if required.
3.1 Regeneration/disinfection of the GENO-mat FE-Z deferrisation system
Note: We recommend having the regeneration/disinfection per-
formed by Grünbeck’s authorised technical service/authorised ser­vice company.
Order no. 025 153 940-inter Edited by: nkes-mrie G:\BA-153940-INTER_025_GENO-MAT_FE-Z.DOC
27
Deferrisation
GENO-mat FE-Z Deferrisation System
3.1.1 Oxidising agents Designated area of application:
Oxidising agents are used for the regeneration and disinfection of GENO-mat FE-Z deferrisation systems. Furthermore, they are dosed upstream of GENO-mat FE-Z deferrisation systems in order to com­pletely oxidise iron II compounds.
The dosing and the dosing volumes depend on the iron concentra­tions contained in the raw water.
You can use either our GENO-Spezialgranulat1) agent or GENO-oxi plus (liquid).
3.1.2 Preparing the regeneration agent
Fill the regeneration tank with filtered water (for respective quanti-
ties refer to Table G-1). We recommend installing a filling tap in the pure water pipe for this purpose.
Pour the GENO-Spezialgranulat (special granulate)1) or GENO-oxi
plus into the tank and mix by means of the integrated hand mixer until the special granulate has dissolved completely.
Install a suction hose between the regeneration tank and the ball
valve at the control valve.
1)
Note: Registration by the Federal Surveillance Authority for Opium
Table G-1: Amount of regeneration agent
according to the Controlled Substances and Precursors Act required.
GENO-mat FE-Z deferrisation system
required
Preparation amount [l]
GENO-oxi plus [l] 5 9 11 17 17 35 53
GENO-Spezialgranulat1)
2)
If the liquid product GENO-oxi plus is used, the GENO-oxi plus amount must be subtracted from the prepara­tion amount.
20/10 25/13 30/14 40/17 40/18 50/19 60/20
2)
502) 602) 1002) 1002) 2002) 3002)
30
[g] 105 175 210 350 350 700 1050
Order no. 025 153 940-inter Edited by: nkes-mrie G:\BA-153940-INTER_025_GENO-MAT_FE-Z.DOC
28
3.1.3 Timer settings
Deferrisation
GENO-mat FE-Z Deferrisation System
For the regeneration/disinfection the corresponding regeneration
tank and the appropriate regeneration agent are required (refer to
3.1 preparation of the regeneration agent).
Flip the cover of the control valve to the side.
Release a manual regeneration (refer to chapter F, item 1.4).
Flip the timer to the right and wait for 10 minutes until limit switch
1 is free (Fig. G-1, picture 1) and the actuator of the control piston has stopped.
Unplug mains plug.
Open the ball valve on the back of the control valve and suck the
regeneration agent from the connected regeneration tank.
Close the ball valve again after the regeneration agent has been
completely sucked off.
Reconnect mains.
Wait until limit switch 1 is pressed again (Fig. G-1,
picture 2) and the actuator of the control piston has stopped.
Unplug mains plug.
Flush for at least 30 minutes in order to wash out all residues of
the regeneration agent from the filter bed.
Reconnect mains.
The deferrisation system is ready for operation again when the
limit switches 1 and 2 are free (fig. G-1, picture 3).
Screw cover back on.
Fig. G-1: Rear of timer
Order no. 025 153 940-inter Edited by: nkes-mrie G:\BA-153940-INTER_025_GENO-MAT_FE-Z.DOC
29
Deferrisation
GENO-mat FE-Z Deferrisation System
3.2 Operation log
4 Spare parts
You may order spare parts and consumables from your local
The operation log is located in chapter G, item 5 of this operation manual. When starting up the system, make sure to record all data on the cover sheet of the operation log and fill in the first column of the check list.
The customer service technician will fill in a column of the check list whenever maintenance is performed. This document provides evi­dence of proper maintenance.
Grünbeck representative (refer to www.gruenbeck.de).
Order no. 025 153 940-inter Edited by: nkes-mrie G:\BA-153940-INTER_025_GENO-MAT_FE-Z.DOC
30
5 Operation log
Deferrisation
GENO-mat FE-Z Deferrisation System
Customer
Name: ...............................................................................
Address: ............................................................................
..........................................................................................
..........................................................................................
GENO-mat FE-Z deferrisation system
(Please check appropriate box)
Serial number ................. .........................................
20/10
25/13
30/14
Installed by ...................... .........................................
Filter: Make/Type/ .......................
40/17
40/18
50/19
60/20
Connection data: Drain connection DIN EN 1717 yes no
(Please check appropriate box)
Floor drain available yes no
Order no. 025 153 940-inter Edited by: nkes-mrie G:\BA-153940-INTER_025_GENO-MAT_FE-Z.DOC
31
Deferrisation
GENO-mat FE-Z Deferrisation System
Maintenance work required on the GENO-mat FE-Z deferrisation system
Checklist
Please enter measured values. Confirm checks with OK or enter repair work performed.
Maintenance performed (date)
Measured values
Water pressure [bar] upstream and downstream of the system
Flow pressure [bar] upstream and downstream of the system
Water meter reading [m³]
Iron inlet (measured)
Iron pure water (measured)
Inspections and checks of control unit and control valve
Release of backwash checked
Injector and sieve cleaned
Start-up
Control valve checked for tight­ness
Function of driving motor checked
System "regeneration and disinfection"
System treated with special gran­ulate
Connections, hose connections, seals
Seals and hose connections checked
Miscellaneous
Notes
Customer service technician Company
Work time certificate (no.) Signature
Order no. 025 153 940-inter Edited by: nkes-mrie G:\BA-153940-INTER_025_GENO-MAT_FE-Z.DOC
32
Deferrisation
GENO-mat FE-Z Deferrisation System
Maintenance work required on the GENO-mat FE-Z deferrisation system
Checklist
Please enter measured values. Confirm checks with OK or enter repair work performed.
Maintenance performed (date)
Measured values
Water pressure [bar] upstream and downstream of the system
Flow pressure [bar] upstream and downstream of the system
Water meter reading [m³]
Iron inlet (measured)
Iron pure water (measured)
Inspections and checks of control unit and control valve
Release of backwash checked
Injector and sieve cleaned
Control valve checked for tight­ness
Function of driving motor checked
System "regeneration and disinfection"
System treated with special gran­ulate
Connections, hose connections, seals
Seals and hose connections checked
Miscellaneous
Notes
Customer service technician Company
Work time certificate (no.) Signature
Order no. 025 153 940-inter Edited by: nkes-mrie G:\BA-153940-INTER_025_GENO-MAT_FE-Z.DOC
33
Deferrisation
GENO-mat FE-Z Deferrisation System
Maintenance work required on the GENO-mat FE-Z deferrisation system
Checklist
Please enter measured values. Confirm checks with OK or enter repair work performed.
Maintenance performed (date)
Measured values
Water pressure [bar] upstream and downstream of the system
Flow pressure [bar] upstream and downstream of the system
Water meter reading [m³]
Iron inlet (measured)
Iron pure water (measured)
Inspections and checks of control unit and control valve
Release of backwash checked
Injector and sieve cleaned
Control valve checked for tight­ness
Function of driving motor checked
System "regeneration and disinfection"
System treated with special gran­ulate
Connections, hose connections, seals
Seals and hose connections checked
Miscellaneous
Notes
Customer service technician Company
Work time certificate (no.) Signature
Order no. 025 153 940-inter Edited by: nkes-mrie G:\BA-153940-INTER_025_GENO-MAT_FE-Z.DOC
34
Deferrisation
GENO-mat FE-Z Deferrisation System
Maintenance work required on the GENO-mat FE-Z deferrisation system
Checklist
Please enter measured values. Confirm checks with OK or enter repair work performed.
Maintenance performed (date)
Measured values
Water pressure [bar] upstream and downstream of the system
Flow pressure [bar] upstream and downstream of the system
Water meter reading [m³]
Iron inlet (measured)
Iron pure water (measured)
Inspections and checks of control unit and control valve
Release of backwash checked
Injector and sieve cleaned
Control valve checked for tight­ness
Function of driving motor checked
System "regeneration and disinfection"
System treated with special gran­ulate
Connections, hose connections, seals
Seals and hose connections checked
Miscellaneous
Notes
Customer service technician Company
Work time certificate (no.) Signature
Order no. 025 153 940-inter Edited by: nkes-mrie G:\BA-153940-INTER_025_GENO-MAT_FE-Z.DOC
35
Loading...