GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
LOCATION
Choosing the proper location is an important step before
you begin to assemble the structure.
The following suggestions and precautions will help you
determine whether your selected location is the best
location.
• Never erect the structure under power lines.
READ THIS DOCUMENT BEFORE YOU BEGIN.
Thank you for purchasing this GrowSpan™ greenhouse.
When properly assembled and maintained, this product will
provide years of reliable service. These instructions include
helpful hints and important information needed to safely
assemble and properly maintain the greenhouse. Please
read these instructions before you begin.
If you have any questions during the assembly, contact
Customer Service at 1-800-245-9881 for assistance.
SAFETY PRECAUTIONS
• Wear eye protection.
• Wear head protection.
• Wear gloves when handling metal tubes.
• Use a portable GFCI (Ground Fault Circuit Interrupter)
when working with power tools and cords.
• Do not climb on the greenhouse or framing during or
after construction.
• Do not occupy the greenhouse during high winds,
tornadoes, or hurricanes.
• Provide adequate ventilation if the structure is
enclosed.
• Do not store hazardous materials in the greenhouse.
• Provide proper ingress and egress to prevent
entrapment.
ANCHORING INSTRUCTIONS
Prior to assembling this greenhouse, please read the
MUST READ document included with the shipment.
• Identify whether underground cables and pipes are
present before preparing the site or anchoring the
structure.
• Location should be away from structures that could
cause snow to drift on or around the building.
• Do not position the greenhouse where large loads
such as snow and ice, large tree branches, or other
overhead obstacles could fall.
• Always check local building codes before you begin.
SITE
After choosing a location, proper preparation of the site is
essential. The following site characteristics will help
ensure the integrity of the structure.
• A level site is required. The site must be level to
properly and safely erect and anchor the structure.
• If the site is not level, use footings to provide a secure
base to assemble the structure. Pre-cast concrete
blocks, pressure-treated wood posts, or poured
footings are all acceptable when properly used. (Some
shelters use ground posts or rafter feet.)
• Drainage: Water draining off the structure and from
areas surrounding the site should drain away from the
site to prevent damage to the site, the structure, and
contents of the structure.
WARNING: The individuals assembling this structure
are responsible for designing and furnishing all
temporary bracing, shoring and support needed during
the assembly process. For safety reasons, those who
are not familiar with recognized construction methods
and techniques must seek the help of a qualified
contractor.
WARNING: The anchor assembly is an integral part
of the greenhouse construction. Improper anchoring
may cause greenhouse instability and failure of the
structure. Failing to anchor the greenhouse properly
will void the manufacturer’s warranty and may cause
serious injury and damage.
2
ASSEMBLY NOTE: Install Tek screws using a clutched
drill driver running approximately 750 RPM while applying
approximately 50 lbs of force.
Do not use an impact driver to install Tek screws!
SQUARE TUBING INSTALLATION
Use the 102897 square tubing for all end wall framing. Use
the 104779 square tubing (plain ends) to secure overlap
seam between roof panels.
Revision date: 05.29.19
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
ASSEMBLY PROCEDURE
Following the instructions as presented will help ensure
proper assembly of your greenhouse. Failing to follow
these steps may result in an improperly assembled and
anchored greenhouse and will void all warranty and
protection owner is entitled.
Steps outlining the assembly process are as follows:
1. Verify all parts are included in shipment. Notify
Customer Service for questions or concerns.
2. Read these instructions, the Must Read document, and
all additional documentation included with shipment
before you begin assembling.
3. Gather the tools, bracing, ladders (and lifts), and
assistants needed to assemble greenhouse.
4. Check weather before you install roof and
polycarbonate panels. Do not install panels on windy or
stormy days.
5. Re-evaluate location and site based on information and
precautions presented in documentation.
PANEL AND RIDGE CAP INSTALLATION NOTE
Depending on available equipment, it may be necessary to
construct a support structure to allow a person to reach top
of greenhouse from outside.
If a support structure has to be used, design structure to
support both the weight of structure and the person using it.
Use of a lift is strongly recommended.
CAUTION: Under no circumstances should support
structure allow any force or weight to be applied directly
to polycarbonate sheets! All supports must span
from rafter-to-rafter.
Consult a contractor if needed for additional information.
Take the necessary steps to protect polycarbonate panels.
POLYCARBONATE PANELS ARE NOT DESIGNED TO
SUPPORT WEIGHT.
NOTE: Position supports so they span from rafter-to-rafter
to protect panels. DO NOT use materials that will damage
or scratch panels. Cover panels to protect panel surface.
6. Prepare site (if applicable).
7. Assemble frame components in the order they are
presented.
8. Assemble frame including struts (if equipped).
9. Consult MUST READ document and properly anchor
assembled frame.
10. Install end wall framing.
11. Install, tighten, and secure end panels and doors.
12. Install main roof panels.
13. Read the care and maintenance information in next
column.
CAUTION: DO NOT place support structure directly
on polycarbonate panels; serious injury may occur.
Polycarbonate panels are not designed to support
excess weight.
POLYCARBONATE PANELS
Do not allow panels to remain in direct sunlight with
protective film in place. Doing so will cause protective
film to become difficult if not impossible to remove before
installation.
Store panels indoors or cover with a light-colored
tarp until you are ready to install.
Revision date: 05.29.19
3
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
REQUIRED TOOLS
BASEBOARDS FOR FRAME — RECOMMENDED
The following list identifies main tools needed to
assemble shelter. Additional tools and supports may also
be required.
• Tape measure or measuring device; marker to mark
locations on the pipes
• Variable speed drill and power driver (cordless with
extra batteries works best)
• Metal-cutting saw; drill and drill bits
• Wrenches and socket set, or adjustable wrenches
• Scissors, utility knife, or tin snips; flat bar or putty knife
• Chalk line & caulk gun to apply sealant
• Hammers and gloves; adjustable and self-locking pliers
• Ladders, work platforms, and other machinery for lifting
designed to work safely at height of building
• Rope/cable for cover installation
UNPACK AND IDENTIFY PARTS
The following steps will ensure you have the necessary
parts before you begin.
1. Unpack the contents of the shipment and place where
you can easily inventory the parts. Refer to the Bill of
Materials/Spec Sheets.
These instructions describe installing a baseboard
(recommended) at ground level along each side of the
frame. Baseboard runs from front to back of frame.
This baseboard is not included and is customer supplied.
When installed properly the baseboard helps prevent
ground posts from sinking when anchored. Depending
on building, it also provides a surface to attach struts or
other building components. Secure baseboard using the
supplied FAH009B (1/4" x 4") bolts and FALB01B (1/4")
nuts.
Consult these instructions, or contact Customer Service for
additional information regarding baseboards.
ANTI-BILLOW ROPE INSTALLATION
TO PREVENT DAMAGE AND POSSIBLE INJURY,
INSTALL THE ANTI-BILLOW ROPES IN SHORT
LENGTHS ALONG EACH SIDE OF THE FRAME.
DO NOT INSTALL AS A SINGLE LENGTH TIED AT
EACH END OF THE BUILDING. DOING SO WILL
RESULT IN A LOOSE SIDE PANEL IF THE SINGLE
ROPE BREAKS DURING STRONG WINDS.
2. Verify that all parts listed on the Bill of Materials/Spec
Sheets are present. If anything is missing or you have
questions, consult the Pictorial Parts Guide and all
diagrams for clarification, or contact Customer Service.
NOTE: At this time, you do not need to open the plastic bags containing smaller parts such as fasteners or
washers (if equipped).
Rope
#1
Rope
#2
Dotted line represents the anti-billow rope.
Example: Circles identify the ends of Rope #1.
Rope
#3
4
Revision date: 05.29.19
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
The following graphics and photos will help you identify the
different parts and show you how they are used. (Not all
parts are shown.)
ASSEMBLY NOTE: Install Tek screws using a clutched
drill driver running approximately 750 RPM while applying
approximately 50 lbs of force.
Do not use an impact driver to install Tek screws!
FA4482B
Tek Screw
102570
Aluminum
Channel
104213
Aluminum
U-Channel Profile
CC6212
Fabric Clip
103544
Mounting Plate
Aluminum 8'
H-Channel Profile
104548
End Cap Profile
Doors/Fans/Vents
111928 and
111929
H-Channel Clear
104211
Double
U-Channel
102569
Bearing
102717
Gearbox
Drive
QH1402 & QH1404
Band Clamps
FAH009B & FALB01B
Carriage Bolt & Hex Nut
102547
Cross Connector
102921 & FA4484B
Neo-bonded Galvanized
Washers and Long Tek Screws
FAH320B & FALB32B
Carriage Bolt & Hex Nut
102857
End Clamp
104074
Square-to-Round Tube
Connect Bracket
103496
Gear Box
102198
U-Channel Spring
Revision date: 05.29.19
QH1330
Angle Bracket
104624
Square Tube Fitting
Unswaged
Swaged
Swaged and Unswaged Rafter Sections
(not all pieces are shown)
5
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
H-CHANNEL INSTALLATION INSTRUCTIONS
The new H-channel design requires installation of the at side facing out with channel side toward
the building. Some diagrams and photos in this document show installation of original H-channel with
channel side facing out. Design of new H-channel does not allow channel-side out installation.
Use the diagrams on this page to install H-channel with at side facing out.
ATTENTION: Use only 1-1/2" Tek screws to attach H-channel to building frame. Do not use
shorter screws. They will not hold. Do not use washers on Tek screws when installing
H-channel.
Flat
Side
Channel
UV-protected side
toward sun.
Flat side toward the sun.
Install 1-1/2" Tek screws through
H-channel into building frame.
Center Groove
H-Channel
ATTENTION: Install all twin-wall polycarbonate panels with UV-protected side toward the sun.
6
Revision date: 05.29.19
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
OVERVIEW
See illustration below to identify main parts of greenhouse.
1. Locate required parts for each assembly procedure.
2. Assemble rafters and frame. Anchor frame.
3. Assemble and install end walls.
GrowSpan™
Gothic Pro Greenhouses
and Systems
4. Prepare and attach end panels.
5. Prepare and attach roof panels.
6. Attach roll-up side panels and anti-billow ropes.
7. Install doors.
Chord
ATTENTION: Position purlins evenly during the
frame assembly. Use the rafter pipe joints as
guides when installing the end clamps, cross
connectors, and purlins.
End Rafter
Interior
Rafter
Purlins
Revision date: 05.29.19
Ground
Post
Baseboard is
supplied by
customer.
Ground
Level
7
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
LAY OUT THE BUILDING SITE
After the site is prepared, lay out the building site.
Taking these steps before assembling the shelter saves
time and ensures that the structure is positioned as
desired.
Ground posts must be driven to the proper depth. Width of
the shelter is measured from the center of one ground post
to the center of the remaining ground post.
SQUARE THE SITE
Gather the Parts:
• Ground Posts
• 5/16" x 2-1/2" Machine Bolts
• 5/16" Nuts
1. Identify a corner where a ground post will be positioned
and drive the first ground post into the ground.
NOTE: Insert the ground post driver into the top of
the ground post to protect the post and drive the post
into the ground. The top of the post will be one (1) foot above the finished grade when properly driven.
Ground
Post
3. Use a transit or line level to drive the second corner
4. Sting a line at least as long as the building from the first
5. After squaring the position of the building, measure
post to the same depth as the first ground post.
stake at 90°.
NOTE: A transit can be used to ensure an accurate 90°
angle, or the 3-4-5 rule can be used. Refer to diagram.
Using multiples of 3-4-5 such as 6-8-10 or 12-16-20
helps to maintain an accurate 90° angle.
the length (center-to-center) and drive the next corner
ground post.
Outside of
Shelter
Inside of
Shelter
ATTENTION: Position the pre-drilled holes facing to the
inside/outside of the shelter so they can be aligned with
the bolt holes in the rafter legs.
To align the bolt holes in the ground posts with those
in the rafter after driving the ground posts, insert a
tapered rod or pry bar into a ground post bolt hole and
turn the post using the rod or pry bar.
2. After the first corner ground post is in place, string a
line the width of the building (center-to-center) and
drive the second ground post into the ground just
enough to hold it in place.
6. Repeat the same step for the last corner post.
NOTE: The distance measured diagonally between
corner posts must be equal for the building to be
square.
7. Check all dimensions (and adjust if needed) before
driving the remaining posts to the required height.
8. After all corner posts are accurately installed, tie a
string line between the tops of the corner ground posts
on the same side of the shelter. The string is used to
identify the tops of all remaining ground posts. The
string must remain tight and level.
9. Use a tape measure to mark the 48" on-center
locations of the remaining ground posts.
10. Drive the remaining ground posts into the ground at the
required 48" on-center width and the height identified
by the string.
NOTE: Verify that the holes in the ground posts are in
the proper position and that each post is plumb and
driven to the correct depth.
11. Continue with the Rafter Assembly steps that follow.
8
Revision date: 05.29.19
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
ASSEMBLING THE GOTHIC PRO GREENHOUSE
FRAME COMPONENTS
After the site is prepared and an inventory of parts is
complete, continue with the rafter assembly.
NOTE: All rafter assemblies consist of rafter tubes and
purlin clamps. Consult the rafter diagram in the Quick
Start section of these instructions before and during the
rafter assembly process.
Assistance is required to assemble the greenhouse frame.
RAFTER ASSEMBLY
Gather the Parts:
2. Slide six (6) end purlin clamps (three on each side of
the peak) over the rafter pipes. Position all end clamps
at the rafter pipe joints. Position the end clamps as
shown.
• Rafter pipe (#34G190SS403)
• Rafter pipe (#34G190SS401D)
• Rafter pipe (#190S081)
• Chord pipe (#166P120)
• Band clamps (#QH1402 & #QH1404)
• End clamps (#102857)
• Tek screws (# FA4482B)
• Nut setter 3/8'' x 2-9/16 magnetic
END RAFTER ASSEMBLY
The end rafters include purlin end clamps and band
clamps. Install the purlin end clamps before the different
pipes of the rafters are connected. The band clamps for the
side struts are installed when the two (2) end rafters are set
onto the ground posts.
1. Select the seven (7) pipes needed to assemble the first
end rafter and arrange on a level surface.
End clamp as seen from inside the assembled frame.
NOTE: Position all purlin clamps at the rafter pipe
joints. Consult the Quick Start section for additional
information.
3. After slipping the clamps over the rafter pipes, insert
the swaged end of the rafter pipes into the plain ends
of the pipes to assemble the rafter.
4. Once the rafter is assembled, reposition the purlin
clamps over the pipe joints and install a Tek screw
through the rafter pipes to secure each joint.
Revision date: 05.29.19
(#34G190SS403)
(#190S081)
(#34G190SS401D)
End clamp as seen from inside the assembled frame.
IMPORTANT: To prevent damage to the cover and end
panels (if equipped), position the Tek screws so the
heads do not contact the cover when it is installed.
5. Repeat steps for to assemble the remaining end rafter
and set both end rafters aside.
9
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
RAFTER ASSEMBLY (continued)
FRAME ASSEMBLY
INTERIOR RAFTER ASSEMBLY
IMPORTANT: If rafter support kits were purchased
for all or some of the interior rafters, do not install
the 116P120 chord pipe at the peak (see below)
during the assembly of the interior rafters. These
are not used when support kits are installed.
Review the support kit instructions to install those
components during rafter assembly.
Complete the following steps for the interior rafters.
1. Select the pipes for the first interior rafter assembly.
(#34G190SS403)
(#166P120)
(#190S081)
(#34G190SS401D)
IMPORTANT: Install cross connectors during the frame
assembly. End clamps are not used for interior rafters.
2. Slide one (1) band clamp (#QH1404) onto each of the
upper straight pipes on both sides of the peak pipe.
3. Connect rafter pipes and secure each joint with a Tek
screw.
4. Center the chord at the peak of the assembled rafter,
add a band clamp (#QH1402) to each end, and attach
these band clamps to the band clamps on the rafter.
Secure the band clamps to the pipes using a Tek screw
when the chord is in position.
Band Clamp
(#QH1404)
166P120
Interior Rafter
Band Clamp
(#QH1402)
ATTENTION: ATTACH CHORD TO INTERIOR
RAFTER ONLY. Do not install chords on end rafters.
5. Once rafters are assembled, assemble the frame.
After all ground posts are driven in place and rafters are
assembled, assemble the frame.
NOTE: The baseboards (strongly recommended) shown in
the diagrams throughout these instructions are not included
and must be supplied by the customer. Contact Customer
service at 1-800-245-9881 to purchase baseboards, or for
additional information.
ASSEMBLE AND PRE-MARK THE PURLINS
The following steps describe one way to speed the
assembly process and eliminate the need to measure each
purlin as it is installed. Pre-marking the purlins ensures that
an accurate spacing of the rafter assemblies is achieved
and maintained during assembly.
Gather the Parts:
• Pipe 1.315'' x 75'' swaged (#131S075)
• Pipe 1.315'' x XX'' plain (#131P0XX)
• Marker and tape measure
NOTE: The purlins are part of the assembled frame and
run perpendicular to the rafter assemblies. Each purlin
consists of 1.315" x 75" (#131S075) swaged pipes (number
is determined by shelter length) and one (1) 1.315" x XX"
(#131P0XX) plain pipe.
ATTENTION: The XX" represents the remaining length
required to reach the end of the shelter. Consult the Spec
Sheet for part identification.
1. Select the required pipe sections for one purlin and
connect these by inserting the swaged ends of the
pipes into the plain ends until the entire purlin is
assembled.
NOTE: Assemble the purlins in a location that is
accessible during the assembly of the frame, but will
not interfere with the process of lifting and setting the
rafters.
2. Verify that each pipe joint is properly seated.
NOTE: These pipes must be separated during the
assembly procedure. Do not fasten them together at
this time.
3. For the 48" rafter spacing, measure forty-eight and
three-quarters inches (48-3/4") from one end of the
assembled purlin and mark the distance on the pipe.
NOTE: This first measurement is three-quarters (3/4)
of an inch longer than the on-center rafter spacing
to account for the length of purlin pipe that extends
through the end purlin clamp of the first end rafter.
10
Revision date: 05.29.19
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
FRAME ASSEMBLY (continued)
1. From the location marked in the previous step,
measure forty-eight inches (48") and make another
mark on the assembled purlin.
2. Continue to mark the purlin in 48" intervals until all
locations are marked. These marks help to maintain
the 48" on-center rafter spacing of the shelter during
assembly.
3. Repeat this procedure until all assembled purlins are
marked.
4. After assembling all rafters and pre-marking the purlins,
assemble the frame.
ASSEMBLE THE FRAME
After all ground posts are driven in place, rafters are
assembled and purlins pre-marked, assemble the frame.
Gather the Parts:
• All rafter assemblies and pre-marked purlins
• Band clamps (#QH1404)
2. Secure the leg pipes to the ground posts using the
5/16" x 2 1/2" machine bolts and nuts.
Rafter
Band
Clamp
Outside of
Shelter
Ground
Post
Inside of
Shelter
3. Use rope or cable to keep the rafter in position.
• Cross connector (#102548)
• 5/16" x 2-1/2" Machine bolts and 5/16" nuts
• Lifts, ladders, and assistants
• Rope or cable
1. Carefully stand the first end rafter, slide a band clamp onto each rafter leg, and place the leg pipes on the first
set of ground posts.
Brace the rafter in place to keep it straight. Depending
on the frame size, a lift and additional assistants may
be needed. Consult Quick Start section for details.
Rafter shown differs in design.
4. Carefully position the first interior rafter in place and
secure the leg pipes to the ground posts.
End Rafter
1st Interior Rafter
Rafter shown differs in design.
ATTENTION: Stand the rafter so the nuts and bolts of
the end clamps are to the inside of the frame.
Revision date: 05.29.19
Rafter shown differs in design.
11
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
FRAME ASSEMBLY (continued)
5. As the second rafter is steadied, remove one section of
pipe from one assembled purlin.
NOTE: Work from the end of the purlin where the
first measurement was taken during the pre-marking
procedure.
6. Insert the purlin pipe through an upper end clamp of
the end rafter and through a cross connector placed in
the same position on the interior rafter. Consult Quick
Start section for purlin location per frame.
Interior Rafter
End Rafter
7. Align the plain end of the purlin with the center of the
end rafter and rotate the purlin pipe so that the first
mark is visible (near the clamp of the interior rafter).
Do not allow the
purlin to extend
beyond the end
rafter.
10. Move to the interior rafter and align the mark on the
11. Verify that the rafter spacing is forty-eight inches (48")
12. Secure the cross connector to the rafter using a Tek
13. Repeat Steps 6-12 to install the first section of each
purlin with the center of the rafter to maintain the proper
spacing.
Interior Rafter
Purlin
Align mark with
center of rafter.
on-center (adjust as needed) and tighten the cross
connector.
screw. See Quick Start section if needed.
purlin assembly for the first two rafters.
End rafter view
Interior rafter view
8. Tighten the end clamp and secure it to the rafter with a
Tek screw.
9. Install Tek screw through end clamp and into the purlin
pipe.
End Rafter
Purlin
12
34' wide
(center-to-center)
14. Choose another interior rafter assembly and set it
in position. DO NOT USE THE REMAINING END
RAFTER.
15. Secure the rafter legs to the ground posts as previously
described and steady the rafter.
16. Remove another section of purlin pipe from each premarked purlin assembly and attach these to the rafter.
17. Verify that the distance between the rafters is 48"
center-to-center. Adjust the rafter forward or backward
as needed to maintain this dimension.
Revision date: 05.29.19
FRAME ASSEMBLY (continued)
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
BASEBOARD INSTALLATION (RECOMMENDED )
18. Secure the purlin pipe joint with a Tek screw.
19. Repeat the above steps as needed to stand and secure
the remaining interior rafters and purlins to complete
the frame assembly.
20. Slide a band clamp onto each leg of the remaining
end rafter, secure the rafter to the ground posts, and
attach the purlins to it. Verify that the end clamps are
positioned with the nut and bolt to the inside of the
assembled frame. Refer to the Quick Start section and
previous diagrams if needed.
NOTE: If the last end rafter is plumb and the purlin
extends beyond the end of the rafter, cut the last
section of purlin pipe to the required length.
Gather parts:
• 2" x 6" (minimum) treated or recycled plastic lumber
(supplied by customer).
• 1/4" x 4" Carriage bolts and 1/4" Nuts (included)
The following procedure describes one way to install the
baseboards. Size and type of baseboard may require
additional installation steps.
General installation steps:
1. Position baseboard as shown and clamp or hold in
place against ground posts.
Inside of
Shelter
Dashed line shows
ground level.
Frame length may differ from actual frame.
21. Once all rafters are set and all purlins are in place and
secure, return to each pipe splice of each purlin and
verify that a Tek screw is installed. Install a Tek screw if
needed.
22. Remove any temporary bracing (if needed) and install
the baseboards and the side struts.
BASEBOARD INSTALLATION — RECOMMENDED
After installing all panels, installing a baseboard is
recommended. Minimum size is 2" x 6". Length
determined by building length. Materials for
baseboards are supplied by the customer.
Fasteners to secure baseboards to frame are included
with building.
Outside of
Shelter
Ground
Level
ATTENTION: Never attach two boards to the same ground
post. All baseboard splices should be between rafters as
shown above.
Use a short section of baseboard to secure separate
baseboards at a splice. Customer supplies all materials
to secure all baseboard splices.
2. From inside the greenhouse, drill 5/16" holes through
ground posts, panels, and baseboard. (Ground posts
may come pre-drilled.)
3. Secure with 1/4" x 4" carriage bolts and nuts. Insert
from outside.
Depending on baseboard dimensions, countersink bolt
holes in baseboard as needed to allow bolts to reach
through all components.
A baseboard (2" x 6" minimum) helps keep ground posts
properly seated after anchors are installed.
Revision date: 05.29.19
4. Continue by installing side struts. See next page.
13
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
SIDE STRUT INSTALLATION
There are four (4) side struts for the shelter. These struts
are positioned between the end rafters and the first interior
rafter on each side of the shelter.
Complete these steps to install the four (4) side struts:
3. Attach the remaining end of the strut to the baseboard
using a lag screw or nut and bolt (not included). See
the diagram that follows for location.
Photo shows the strut attached
to the inside of the customersupplied baseboard.
End
Rafter
Gather the Parts
• Struts
• Band clamps (#QH1404)
• Lag screw or nut and bolt (supplied by customer)
1. Locate one strut and position it between one end rafter
leg and the leg of the first interior rafter as shown
below.
Strut
End Rafter
Baseboard is required
for this procedure.
Customer supplies the
baseboard.
Ground Level
Interior
Rafter
2. Attach one end of the strut to the band clamp as shown
in the diagram below.
Attach strut
as shown.
Baseboard
Ground Level
NOTE: A baseboard provides a place to attach each
strut and helps keep the ground posts at the required
depth. The customer is responsible for providing a
baseboard for this frame. If no baseboard is present,
attach the strut to the ground post using a Tek screw or
other customer supplied fasteners.
4. Repeat the above steps to attach the remaining side
struts to the shelter.
5. After securing the struts, verify that all clamps are
secured with a Tek screw to the rafters.
6. Verify that each pipe splice (purlin and rafter) is
secured with a Tek screw.
7. Complete the next procedure to anchor the assembled
frame.
End Rafter
Band Clamp
Strut
NOTE: Head of bolt on the band clamp must face the
toward the outside of the shelter.
14
ANCHOR THE ASSEMBLED FRAME
At this point, anchor the greenhouse frame. Consult the
MUST READ document for anchoring information and
suggestions. Please call customer service at 1-800-2459881 for additional anchoring information.
CAUTION: The anchor assembly is an integral part of
the greenhouse construction. Improper anchoring may
cause instability and failure of the structure to perform
as designed. Failing to anchor the shelter properly
will void the manufacturer’s warranty and may cause
serious injury and damage.
Revision date: 05.29.19
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
END WALL INSTALLATION
The steps to install the end walls for the greenhouse
include the following:
1. Install end wall framing. (See the diagrams in the Quick
Start section at the back of these instructions. Read the
installing accessories note below.)
2. Prepare polycarbonate end panels and attach.
3. Assemble doors and attach.
INSTALL END WALL FRAMING (Front and Back)
• DO NOT REPOSITION THE END WALL VERTICALS
USED AT THE SEAM OF TWO (2) POLYCARBONATE
PANELS.
• Always consult the installation guides that shipped
with the accessory for additional precautions,
recommendations, and safety requirements.
• Before installing any electrical accessory, consult a
professional electrician for precautions and additional
assistance.
• For gas heaters, a professional, qualified service
technician must install the unit.
Site variations and different methods for anchoring the
greenhouse may require slight changes to be made to
these instructions. It is the responsibility of the owner/
builder to adapt these instructions as needed to adjust for
these and other differences.
A NOTE ABOUT INSTALLING THE END WALL
FRAMING FOR OPTIONAL HEATERS, VENT FANS, AND
MOTORIZED SHUTTERS (if equipped):
Optional accessories such as heaters, vent fans and
motorized shutter units are typically installed in the end
walls of this greenhouse. Additional horizontal framing
(included) is installed between the vertical end wall frame
tubes to mount these accessories. The spacing shown for
the end wall supports on the end frame diagrams may be
too narrow for the installation of some larger accessories.
Diagrams do not show framing for the accessories.
When framing the end wall, consult the installation
instructions for the accessories (if equipped), or measure
the width of the accessory to accurately space and position
the end frame tubes.
Consult the panel installation diagrams in the Quick Start
section to identify the verticals that can be moved.
MOVE ONLY THE VERTICAL SUPPORTS LABELED
AS NON-CRITICAL.
Before installing any greenhouse accessory, adhere to the
following:
• Consult the end frame diagrams before installing the
accessory horizontal framing.
Complete these steps to install the accessory framing:
1. Based on the installation requirements and precautions
of the accessory, choose a location in the end wall to
mount the accessory, and cut a 1.5" x 1.5" frame tube
to the required length for framing.
2. Attach these horizontal frame tubes between the
vertical frame tubes of the end wall (at the required
height determined by the installation instructions
included with that accessory) using angle brackets.
INSTALL THE END WALL FRAME
Refer to the end frame diagrams (Quick Start section).
The materials and parts needed to assemble the end wall
frame include:
• Square tube (#102897): Full and cut-to-length.
• Angle brackets (#QH1330) & Band clamp (#QH1404)
• Square tube fitting (#104624)
• Square-to-round tube connect bracket (#104074)
• Carriage bolt (#FAH320) and Nut (#FALB32B)
• Tek screws (#FA4482B)
1. Locate the square metal tubing for the base tube of the
end wall. The base tube consists of 99" swaged tubes
and one (1) short section cut from a 102897square
tube. See Quick Start section for clarification.
2. Insert the swaged ends of the tubing into the plain ends
to connect the pieces, measure, and cut to length.
• Move only those verticals labeled as "NON-CRITICAL"
on the end frame diagrams when deciding where to
install the additional horizontal framing for accessories.
• Consult the diagrams in the Quick Start section
showing the polycarbonate panel locations and the
locations of the aluminum trim and profile before
repositioning any end wall vertical.
Revision date: 05.29.19
3. Position this assembled base tube on the ground
between the legs of the end rafter at the front of the
greenhouse and anchor it in place. This base tube will
be directly below and in line with the end rafter.
15
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
INSTALL THE END WALL FRAME (continued)
4. Secure the base tube between the legs of the end
rafter using an angle bracket and Tek screws.
The bracket
shown in this
diagram can
be installed
with either its
short section
(as shown) or
Ground
Post
Base Tube
the long section
attached to the
ground post.
9. Measure the distance between the top of the base tube
10. Choose one (1) square tube (#102897), insert the
11. On this assembled frame member, mark the length
and band clamp (Step 7) to determine the length of the
first vertical section of the door frame tube.
swaged end of the long tube into the plain end of
another tube and tap with a hammer to properly seat
the tubes at the joint.
determined in Step 9 (above) and subtract the amount
needed to account for the square-to-round tube
connect bracket, which is attached to the top of the
frame tube. See the diagram that follows.
End Rafter
5. On the base tube surface facing the inside of the
greenhouse, install a short Tek screw at each joint and
then locate and mark the center of the base tube.
6. Consult the End frame diagram (Quick Start section)
and mark the rough opening for the width of the double
door assembly.
7. Place the band clamps on the end rafter above the
door as shown below. DO NOT TIGHTEN THE BOLTS
AT THIS TIME.
ATTENTION: The frame shown below may differ from
the end wall frame. Consult the diagrams in the Quick
Start section to view the frame for this shelter.
8. Select the tubing for the two vertical frame supports for
the sides of the double door. Each support includes:
• One (1) long 99" section of square tubing (#102897
swaged end)
• One (1) short section of square tubing. This is cut
from a swaged end tube (#102897).
Front (or outside)
of the greenhouse
Square-toRound Tube
Connect
Bracket
Vertical Door
Frame Tube
12. Select a square-to-round tube connect bracket and
attach the bracket to one end of the vertical frame
member. Use a 5/16" drill bit to drill a hole through the
tube and attach the bracket to the tube using a nut and
carriage bolt.
13. Repeat Steps 9-12 for the remaining vertical frame
member for the door.
14. With the square-to-round tube connect bracket
attached to the top of each vertical door frame tube,
use the bolt in the band clamp to attach the bracket to
the band clamp. DO NOT TIGHTEN AT THIS TIME.
NOTE: The heads of the bolts for each clamp are to the
outside (or front/back) of the greenhouse. At this point,
the two vertical door frame members should be loosely
attached to the end rafter assembly.
• One (1) square-to-round tube bracket (#104074)
16
Revision date: 05.29.19
INSTALL THE END WALL FRAME (continued)
15. Using the marks on the base tube for the rough
opening for the door, attach the bottom of each vertical
frame member to the base tube using an angle bracket.
Consult the end frame diagram.
Center of
Door Frame
Tube
Door Opening
Angle Bracket
Base Tube
Mark
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
17. Using a level (or other means), verify that one vertical
door frame tube is plumb and tighten the band clamp
bolt to lock the first door frame member in place.
18. Choose the square tube for the door frame header and
cut the swaged end to the proper length for the width of
the rough door opening.
19. Using two angle brackets, attach the header tube to
the end wall assembly between the vertical door frame
tubes as shown.
Header
16. With the vertical door frame tubes attached at the
bottom and loose at the top, measure each frame
member to locate the height of the rough door opening
and mark the location on the inside of the door frame.
Consult the End Frame Diagrams Quick Start section
located at the back of these instructions.
Mark Here
92-1/4"
Height of rough
door opening
92-1/4"
92-1/4"
Height of rough
door opening
96-3/4"
Width
Inside dimensions are shown. Diagrams may show a
different frame used for illustration purposes only.
20. Verify that both door frame verticals are plumb and
recheck the width of the rough door opening at the top
and bottom. Adjust if needed.
21. Cut the metal tube for the short, end wall supports
(positioned between the header and the end rafter) and
attach as shown in the following diagram.
Frame shown may differ from actual frame.
Revision date: 05.29.19
17
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
INSTALL THE END WALL FRAME (continued)
22. Use the end frame diagram to determine the number of
remaining vertical end frame supports and place one
band clamp on the end rafter for each of the remaining
vertical supports. Use the diagram for the location of
these clamps.
23. Using the end frame diagrams (Quick Start section),
measure and mark (on the base tube) the locations of
the remaining vertical end wall supports.
24. Choose the parts for each remaining vertical support
for the end wall framing. Each vertical support consists
of the following parts:
• Square tube: Longer verticals may require an
additional shorter length cut from a longer tube.
• One (1) square tube fitting (#104624) to attach the
support to the base tube of the end wall assembly.
• One (1) square-to-round tube connect bracket
(#104074) to attach the tubing to the band clamp
on the end rafter.
25. Use the steps presented earlier in these instructions
and the end frame diagrams to measure and cut each
section of square tubing for the remaining vertical
frame members.
ATTENTION: Remember to subtract the amount
needed to account for the square-to-round tube
connect bracket that will be attached to the top of each
remaining frame member.
27. With the square-to-round tube connect bracket
28. Align the center of the assembled frame member with
29. Verify that the vertical end wall frame member is plumb
30. Tighten the top band clamp and install a short Tek
attached to the top of the frame member, place a
square tube fitting on the bottom of the frame member.
the center mark on the base tube and attach the top of
the frame member to the band clamp on the rafter. Do
not tighten.
and use the short Tek screws to secure the square tube
fitting to the base tube.
Center Mark
screw through the clamp and into the rafter.
26. Choose a square-to-round tube connect bracket and
attach the bracket to one end of the vertical frame
member. Use a 5/16" drill bit to drill a hole through the
tube and attach the bracket to the tube using a nut and
carriage bolt.
Position all screws, bolts
and clamps so they will
not damage the end wall
panels when panels
are attached to the
end wall frame.
Band Clamp
Square-toRound Tube
Connect
Bracket
End Rafter
Front (or outside)
of the greenhouse
Inside view
of end rafter
31. Repeat the procedure as needed to assemble and
install the remaining vertical end wall supports.
32. Return to the bottom of each frame member and install
a short Tek screw through the backside of each tube
fitting to secure the end frame support to the tube
fitting.
33. Once each end wall is assembled, return to each band
clamp and pipe splice of each base tube and verify that
a Tek screw is installed. Install a Tek screw if needed.
18
Revision date: 05.29.19
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
END WALL FRAME TUBE
END WALL FRAME TUBE
INSTALL END WALL FRAMING (BACK)
The greenhouse end walls (front and back) are identical
except as noted below and on the end frame diagrams.
If the back wall includes the optional double door kit
(additional purchase required), repeat the End Wall
Installation procedure and install the framing for the
remaining end wall.
If the back wall does not include an optional double door
kit, consult the end frame diagram to install the vertical
frame members.
Ground Level
Secure all polycarbonat panels as shown in the diagrams
and photos below.
Vertical dashed lines show where additional frame tubes
are installed when the optional double door is not used.
Consult the end frame diagram for additional information.
1. Read the note regarding the installation of optional
accessories at the beginning of the end wall installation
section.
2. Cut the 102897 tubes to the required length and attach
to the end wall framing.
3. Attach the frame supports at the top and bottom as
previous described.
Use a Tek screw and washer to secure panel to end wall
frame. Do not crush panel when installing screws.
TEK SCREW
PANEL SPLICE "H" CHANNEL
Revision date: 05.29.19
TEK SCREW & NEO-BONDED WASHER
8MM POLYCARBONATE
GLAZING PANEL
Diagram shows basic panel installation and fasteners used
to secure polycarbonte panels.
19
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
EXCESS
TRIMMED AND
USED HERE
EXCESS
TRIMMED AND
USED HERE
END PANEL INSTALLATION
After the end wall framing is attached to the greenhouse,
attach the polycarbonate panels to the end wall framing.
The steps that follow describe one way to complete the end
wall panel installation.
The materials and parts needed to assemble the End
Panels include:
• Polycarbonate panels and white vent tape
• Aluminum U-Channel profile (#104213)
• Aluminum 8' H-Channel profile
• Tek screws (#FA4484B)
Complete the following general steps to install the end wall
panels.
1. Consult the panel location diagrams, select one
polycarbonate panel, begin at the edge of the opening
for the double door, and work to the outside edge of the
end wall.
See the X in the diagram below for the first panel.
• Neo-bonded galvanized washers (#102921B)
Read the following information before starting:
• U-Channel profile is used to finish the roll-up side
edges of the polycarbonate panels.
• H-Channel profile is used to join two (2) separate
polycarbonate panels at the seam.
• Tek Screws and galvanized washers are used to
secure aluminum channel and panels to end wall
frame.
• Install the polycarbonate panels with the UV-protected
side to the outside. Mark this side with a marker if
needed after removing the protective film.
ATTENTION: The protective film must be removed
from the polycarbonate panels. Allowing the film to
remain intact and in direct sunlight will make the film
difficult if not impossible to remove.
• During preparation, rest the edges of the panels on
cardboard or other material to protect them from dirt
and damage.
X
Dashed line and small arrows (above) show where to
install the white vent tape. Do not install tape in any
other location on any other end panels.
NOTE: Remove the protective film. When needed, an
upper panel is cut to length after attaching it to the end
wall frame and rafter.
Always remove the protective film and mark and install
the UV-protected side to the outside of the greenhouse.
Mark UV Side
X
• Seal the bottom edge of the panels with white vent
tape.
• Consult the polycarbonate panels (Quick Start section)
for the location and lengths of each panel. The
diagrams are located at the back of these instructions.
ATTENTION: Panels must be position as shown on the
panel diagrams. Using a panel in the incorrect place can
affect the placement of subsequent panels. In addition, the
amount of aluminum profile used between panels and to
finish the panel edges may not be adequate if additional
seams are created. Begin at the door end of the building.
NOTE: Install all accessories (fans, vents, heaters, etc.)
after installing all polycarbonate sheets.
20
2. Apply white vent tape to the bottom of the lower panel
and then install the aluminum U-channel profile to the
edge of the panel adjacent to the door as shown on the
Polycarbonate Panels diagram.
Revision date: 05.29.19
END PANEL INSTALLATION (continued)
3. Place the panel in position, attach it to the end wall
framing using Neo-bonded washers and the long Tek
screws.
Installed End Panels
with H-Channel
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
4. Continue installing the polycarbonate panels as
described for the front and back end walls.
ATTENTION: U-channel profile is installed along the
edges of the panels shown in the diagram below.
Install profile here.
H-Channel
NOTE: When attaching any profile, remember to
account for the areas where different sections of profile
intersect so that the profile is cut to the proper length.
Space the screws evenly at 16" when securing the
panels. DO NOT USE WASHERS WHEN SECURING
THE H-CHANNEL TO THE END WALL FRAMING.
The H-channel can be installed before the panel is
attached to the framing or after securing the panel to
the frame.
DO NOT install profile on the bottom of the end wall
panels. These edges are sealed with the white vent
tape.
Upper Panel
In this photo, the top of the panel is removed using a
power tool equipped with a round cutting bit. A utility
knife can also be used.
Cut upper panel
to proper length.
Ground Level
Frame shown above may differ from actual frame.
5. Continue with the Double Door Assembly procedures
that follow.
DOUBLE DOOR ASSEMBLY
The materials and parts needed to assemble the doors
include:
• Door frames and polycarbonate panels
• Door hinges and latch hardware
• Aluminum U-Channel profile (#104213)
• End cap profile (#104548)
• Tek screws (#FA4482B & FA4484B))
• Neo-bonded galvanized washers (#102921B)
ASSEMBLE AND ATTACH THE DOORS
NOTE: Install the polycarbonate panels with the UVprotected side to the outside.
1. Locate door frame (102923), assemble (if needed), and
place on a flat surface.
2. Select one polycarbonate panel (this will be one 4' x 8'
panel) and trim it so that the length is one-quarter inch
(1/4") shorter than the length of the door frame.
3. Trim width of panel (if needed) so that it is one-quarter
inch (1/4") narrower than width of door frame.
NOTE: Trimming the panels as instructed will keep the
panel flush with the edge of the door frame after the
aluminum profile is installed.
The greenhouse in this photo is used for illustration only. It is
of a different model.
Revision date: 05.29.19
4. Center the panel on the door frame.
21
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
DOUBLE DOOR ASSEMBLY (continued)
5. Using the long Tek screws and neo-bonded galvanized
washers to attach the panel to the horizontal cross tube
of the door frame.
NOTE: Attach the panel in the locations shown in the
photo to hold the panel in place while installing the
aluminum profile to the perimeter of the panel.
6. Install aluminum U-Channel profile to all edges of the
polycarbonate panel.
Photo shows the polycarbonate panel installed on
the outside of the door frame and finished with the
aluminum U-Channel profile. Corners are cut at 45°
angles.
8. After assembling both doors, evenly space the hinges
9. With the hinges attached to the doors, use the short
along the door frame of each door and attach the
hinges to the assembled doors using the short Tek
screws.
Tek screws to attach the doors to the frame of the end
wall.
To keep the panel and profile in place, the long Tek
screws and neo-bonded galvanized washers are
installed so the screw drills through the longer edge of
the U-profile (underside of the polycarbonate panel)
and the washer overlaps the shorter edge of the
U-profile (top) as shown above.
7. Repeat the above steps to attach the polycarbonate
panel and to install the aluminum profile to the
remaining door frame.
22
Locations of door hinges may vary.
Revision date: 05.29.19
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
DOUBLE DOOR ASSEMBLY (continued)
10. Install the 6" chain bolt to the upper part of the inside
of one door and the main latch assembly to the other
door.
c. Dashed line identifies where to attach the end cap
profile. The end cap extends beyond the frame
members and into the rough opening to stop the
door in the frame and to help seal the gap between
the door and frame.
Inside
View
Outside
View
11. At the top and sides of the end wall door opening on
the inside of the frame, attach end cap and allow it to
extend below and into the door frame opening.
ATTENTION: This profile acts as a stop for the double
doors, which prevents undo stress on the hinges.
Consult the photos that follow.
a. Photo shows the end cap as attached to the door
frame tube. View shows the assembly from the
outside.
b. Cross section shows the end cap (dashed line)
attached to the inside/back of the door frame.
Door Frame
Tube
End Cap
(#104548)
End cap used for
door stop and seal.
Diagram may show a different frame used for illustration
purposes only.
12. After end cap profile is installed, install another section
of the same end cap on the inside frame of the door
that includes the chain latch.
Revision date: 05.29.19
Diagram may show a different frame used for illustration
purposes only.
NOTE: This length of end cap will act as a stop for the
remaining door of the double door assembly when both
doors are closed.
13. Check the operation of the latches and the doors.
14. Continue by installing the polycarbonate roof panels.
23
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
INSTALL ROOF PANELS: OVERVIEW
Install polycarbonate roof panels after installing end panels. These are the main steps to attach panels:
1. Set height of roll-up panel.
2. Prepare and install lower panels first along both sides for first two (2) bays (as shown).
3. Install upper panel for end bay. (Upper panel overlaps lower panel by six (6) inches.)
4. Install ridge cap.
5. Repeating Steps 1–3, work toward other end of frame until all panels and ridge cap sections are installed.
6. Attach aluminum profile to lower edge of upper panel and secure using Tek screws and washers.
7. Seal panels and profile.
8. Continue with baseboard installation if used.
INSTALL POLYCARBONATE ROOF PANELS
The diagram that follows shows locations of different
panels. Frame shown below may differ from actual frame.
NOTE: Install so upper panels overlap top edge of lower
panels approximately six (6) inches.
ASSEMBLY NOTE: Install Tek screws using a clutched
drill driver running approximately 750 RPM while applying
approximately 50 lbs of force.
Do not use an impact driver to install Tek screws!
Upper Panel: 116051
(47-1/4" x 144")
Cut to length.
Mid Panel: 116049
(47-1/4" x 96")
Full
Gather Parts:
• 116049 (47-1/4" x 96") & 116051 (47-1/4" x 144")
Panels
• 111928 (8') & 111929 (12') H-channel
• 104213 Aluminum U-channel and 104548 End Cap
Profile
ATTENTION: DO NOT store or allow polycarbonate panels
to remain in direct sunlight for an extended period of time
before installation. Doing so could cause protective film
to become difficult if not impossible to remove.
6" Panel Overlap —
Both Sides
Ridge Cap (CG96174)
NOTE: Dashed line shows tops
of lower panels; solid line shows
bottom of upper panels.
24
Lower Panels (both sides):
Full 47-1/4" x 96" Panels –
all building widths and lengths.
(116049)
Revision date: 05.29.19
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
SET HEIGHT OF ROLL-UP SIDE PANEL
The desired height for roll-up side panel is determined and marked before installing polycarbonate roof panels.
ATTENTION: Consult Main Cover Details diagram in the Quick Start section of this manual to verify height of roll-up side
panel.
Required distance from finished grade to bottom of roof panels is 42".
1. Measure and mark the height of roll-up side panel at 42" on the end rafter at one end of the greenhouse.
42"
Customer-Supplied Baseboard
Ground Level
2. Move to opposite end of the greenhouse (same side) and mark same height from finished grade on that end rafter.
3. Stretch a chalk line along the side between the two points. Use a line level to ensure marks are level.
4. Snap to mark bottom edge of polycarbonate roof panels.
5. Continue by installing roof panels.
Revision date: 05.29.19
25
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
POLYCARBONATE ROOF PANELS
There are different ways to install polycarbonate roof panels. Individuals familiar with the installation of these panels and
overall assembly of similar greenhouses may choose to install according to past experience. Since there are differences
between buildings, read through the procedure that follows to better understand panel installation for this greenhouse.
This procedure describes one way to install panels.
Complete these steps:
1. Take one 116049 panel (47-1/4" x 96"), mark UVprotected side, and remove protective film.
Mark here
NOTE: Mark UV-protected side using a piece of tape or
other means to ensure side is installed toward the sun.
4. Place panel on a covered surface and install 111928
H-channel (8') along both sides.
Install UV-protected
surface toward the sun.
X
Tape
NOTE: If needed, use a thin bar or putty knife to
carefully pry H-channel open for easier installation. Use
a rubber mallet to gently tap H-channel into place along
each panel side. Do not damage channel or panel.
2. Apply vent tape (104774) to cover one end of panel.
3. Move to opposite end of panel and cover open cells
using DH8007 foil tape.
NOTE: Panel end with vent tape is the bottom; panel
end capped with foil tape is the top.
5. After panel is prepared, carefully lift and move panel to
first bay at one end of assembled frame.
26
Revision date: 05.29.19
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
POLYCARBONATE ROOF PANELS (continued)
6. With assistance, place panel against frame and align center of H-channel with center of second rafter. Position end
with foil tape at top. Verify you have UV-protected surface of panel facing toward sun. (Panel was marked earlier
during preparation—Step 1.)
7"
Foil Tape
Top
Vent Tape Bottom
7. Using FA4484B Tek screws and 102921 neo-bonded
washers, attach panel to rafters. Use assistants and
hand clamps as needed to hold panel tight to rafters as
screws are installed.
Ensure panel remains square on frame during
installation. Next panels will not align properly if first
panel is improperly installed.
If panel does not align, check that rafters are spaced at
48" on-center from ground post along one side to those
on opposite side. Adjust rafters as needed.
Install upper screws approximately 7" down from
top edge of panel to allow space for next panel to
overlap the lower panel. Install lower screws at
least 6" up from lower edge of panel to allow for
installation of ribbon board in a latter procedure.
See diagram; install screws between dashed lines.
Duct tape can be used in small pieces to hold
H-channel in place along panel edges. Do not allow to
work loose during installation. H-channel to remain tight
to panel edge.
IMPORTANT: Space screws at 16" on-center. Install
last screws at top of panel 7" from panel end to
allow space for upper panel to overlap when it is
installed. See Step 7 diagram.
6"
Step 7
IMPORTANT: Do not over-tighten Tek screws. Install
snug. Screws should not distort or crush panel cells or
H-channel.
Revision date: 05.29.19
27
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
POLYCARBONATE ROOF PANELS (continued)
8. After installing first lower panel, select another 116049
panel (47-1/4" x 96") and prepare for installation as
described in Steps 1-4.
9. Move to opposite side of frame (same bay) and install
panel in lower position for that side. Review previous
panel installation steps and information if needed.
Panel
Installed
ALTERNATIVE INSTALLATION FOR ROOF PANELS
During assembly, sometimes installing panel from the side
is challenging. An alternative method shows sliding lower
panels into H-channel from top. Review diagrams below for
another way to install lower panels.
10. Repeat steps 1-9 to prepare and install next two lower
panels for next frame bay.
ATTENTION: Do not install H-channel along panel
edge that will connect to previously installed panel.
Verify that panels align with center of rafters and that
each panel is fully inserted into H-channel of previously
installed panel.
If you are unable to install second set of panels due
to limited assistants or other reasons, review the
alternative installation steps in next column. If you
were able to install panels, continue with Step 11.
a. After installing lower panels of first frame bay,
prepare the next lower panel as previously
described but do not attach any H-channel along the edge.
b. With an assistant stationed along side and
someone near panel top, insert lower corner of
panel into H-channel of installed panel.
c. With someone pushing gently from the side to keep
panel in H-channel, have an assistant push panel
down from top. Lubricate H-channel and edge of
panel with water if needed.
d. Once panel is fully installed, attach a piece of
H-channel to panel edge and secure panel to frame
as previously described (See Step 7).
H-Channel
e. Continue with next step.
28
Revision date: 05.29.19
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
POLYCARBONATE ROOF PANELS (continued)
11. Take a 116049 panel (4' x 8'), peal back a corner of the
protective film, mark UV-protected side, and remove all
protective film. This is a mid panel.
12. Apply foil tape to cap cells at one end of panel.
NOTE: Upper end of all upper panels is closed with foil
tape. Lower ends are capped using 104213 aluminum
U-channel. Vent tape is not used.
13. Take a section of 8' H-channel (111928) and cut a piece that is 1" shorter than the panel length. Repeat step to
cut another section for the other panel edge
Top edge
of panel
1"
NOTE: This allows space for installation of the 104213
U-channel once panel is installed.
14. Mark a 6" overlap line on lower panel using a piece of
tape or other non-permanent means. See line below.
16. Align panel and center H-channel with center of end
rafter and first interior rafter.
17. Secure panel to rafters as previously described using
FA4484B Tek screws and 102921 washers.
Step 18
Mid Panel Install
ATTENTION: Install upper Tek screws approximately 7"
inches down from end of panel to allow for a 6" overlap
of next panel.
18. Repeat Steps 11-17 to prepare and install mid panel
(same frame bay) for other side.
Step 14
15. With assistant stationed inside and outside frame,
carefully set panel on frame and overlap top of lower
panel by 6" (previous step).
Revision date: 05.29.19
29
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
POLYCARBONATE ROOF PANELS (continued)
19. Next, measure from peak to top of mid panel and add
6" to allow for a 6" overlap of each lower panel.
Upper End of
Lower Panel
This distance
plus 6".
Installed mid
roof panel.
Installed lower
roof panel.
42"
20. Take a 116051 (4' x 12') panel and cut it to the
dimension determined in previous step. This panel is used to create two upper panels for the same bay.
ATTENTION: If half of panel will work, use half. Panel
can overlap mid panel a few inches more than what is
shown in diagrams. REMEMBER: Use remainder of
this panel for top panel on opposite side.
21. Take a section of 12' H-channel (111929) and cut a piece that is 1" shorter than the panel length. Repeat
step to cut another section for the other panel edge.
22. With assistant stationed inside and outside the frame,
23. Align panel and center H-channel with center of end
24. Secure panel to rafters as previously described using
25. Repeat steps to prepare and install the adjacent upper
carefully set panel on frame and overlap top of lower,
mid panel by 6".
rafter and first interior rafter.
FA4484B Tek screws and 102921 washers.
6"
Overlap
Line
ATTENTION: Install upper Tek screws a few inches
down from peak to prevent interfering with the
installation of ridge cap. (See diagrams on next page.)
Use a section of ridge cap to gauge placement of Tek
screws that secure panel.
panel (same frame bay).
Top edge
of panel
1"
NOTE: This allows space for installation of the 104213
U-channel once panel is installed.
30
Revision date: 05.29.19
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
POLYCARBONATE ROOF PANELS (continued)
26. Take a section of ridge cap (CG96174) and predrill mounting holes in cap lip using 1/4" drill bit. Set first and last holes
approximately 4" in from center of rafter at each end. Ridge cap length is 55", so it will extend beyond mid rafter.
Next cap overlaps first. Seal joint between ridge cap and panel.
Tek screw and washer driven
through pre-drilled hole, through
upper roof panel, and into 104548
end cap positioned inside the frame
under cap.
Do not over-tighten Tek screws.
Seal joint between ridge cap and
panel.
Rafter
Center
4"
27. Take a section of 104548 end cap profile and cut two
(2) pieces so each fits between rafters. These serve as
backers to attach ridge cap sections to.
28. Position prepared ridge cap in place on top of panels.
Have an assistant inside the frame hold a piece of
104548 end cap against panel and in line with the
mounting holes of ridge cap.
4"
Rafter
Center
Steps 22 & 23
104548 end cap cut
to fit between rafters
inside frame.
29. Attach ridge cap to 104548 end cap using FA4484B
Tek screws and 102921 neo-bonded washers. Repeat
to secure remaining side of ridge cap.
CAUTION: Hold end cap in place with a block of
wood to prevent driving Tek screws into hand.
Revision date: 05.29.19
31
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
POLYCARBONATE ROOF PANELS (continued)
33. After installing all panels, continue with the installation
IMPORTANT: BEFORE INSTALLING NEXT SET
OF UPPER PANELS, SKIP TO AND READ THE
SECTION THAT DESCRIBES THE INSTALLATION OF
U-CHANNEL AND OVERLAP BRACING (NEXT PAGE).
of overlap bracing and U-channel.
NOTE: If the overlap bracing and U-channel procedure
was completed during panel installation, skip the next
section and continue with ribbon board installation.
DEPENDING ON AVAILABLE LIFTS AND
ASSISTANTS, THAT PROCEDURE CAN HAPPEN AS
PANELS ARE INSTALLED, OR AFTER ALL PANELS
ARE INSTALLED. REVIEW THE PROCEDURE AND
PROCEED ACCORDINGLY.
30. Repeat steps to prepare and install the next set of mid
and upper panels (X). Ensure UV-protected side of
panels is installed toward the sun.
Lower edge
of panel
1"
ATTENTION: Align ends of all panels to allow for
the installation of 104213 aluminum U-channel in a
later step. (See diagram lower right.) Remember to
cut H-channel 1" shorter (Step 15) to allow for
U-channel installation.
Step 30 & 31
Step 32
x
x
X
X
A
A
31. Next, prepare and install next ridge cap as previously
described.
ATTENTION: Apply a bead of silicone where ridge
cap sections overlap to seal seam. Dashed line above
shows where to install silicone between cap sections.
32. Repeat steps as needed to prepare and install all
remaining panels and ridge cap sections and work
toward other end of frame.
Align ends of all upper panels. Solid line shows
lower end of all upper panels; dashed line shows
upper edge of all lower panels, which is capped
with foil tape during panel preparation.
Align Panel
Ends
32
Revision date: 05.29.19
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
INSTALL OVERLAP BRACING AND U-CHANNEL
If bracing and U-channel trim were installed during
panel installation, skip this section and continue with the
installation of ribbon boards.
IMPORTANT: Under no circumstances should a
support structure allow force or weight to be applied to
polycarbonate panels! Supports must span from rafter
to rafter when used. Consult a contractor if needed for
additional information. Take additional steps to protect
polycarbonate panel surface. Use of a lift is strongly
recommended.
Complete this procedure to finish panel installation:
1. Install 8' sections of aluminum profile (104213) along
lower edge of all mid and upper panels on both sides. Trim last section to length as needed.
2. Move inside the frame and measure between rafters at
point where upper and lower panels overlap.
3. Cut a piece of 104779 (1.5" x 1.5") square tubing to fit
between rafters. (All tubes should be same length.)
Upper
Panel
Foil tape at top of lower panel.
Aluminum profile attached
to bottom of upper panel
(outside of frame).
Lower Panel
NOTE: Diagram (above) shows where to measure to
determine length of 1.5" x 1.5" tube. Diagram shows
installed panels as seen standing inside greenhouse.
4. From inside the frame, align square tube as shown
over lower end of upper panel (dashed line). Hold tube
in place tight against panel.
View from
outside.
Install 8' aluminum profile
here along lower edge of
mid and upper panels.
Install 104213
U-channel here.
Upper Panel
Mid Panel
View from inside the shelter.
Foil tape at top of lower panel.
1.5" x1.5" Tube
(104779)
ATTENTION: Align and install tube as shown to secure
upper and lower panels together at overlap seam.
View shows underside of panels as seen from inside
greenhouse.
Upper
Panel
U-Channel (bottom of
upper panel – outside)
Foil Tape (top
of mid panel
inside)
NOTE: Install long side of
profile on top of panel.
Do not use Tek screws or
washers when installing
aluminum U-channel at this
time.
Revision date: 05.29.19
Long Side
of Profile
104213 U-Channel
1.5" x 1.5" (104779)
Backer Tube
(inside greenhouse)
Mid
Panel
33
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
INSTALL OVERLAP BRACING AND U-CHANNEL — continued
5. With tube aligned and someone holding it in place
inside the greenhouse, drive FA4484B Tek screws with
neo-bonded washers through from the outside into the
1.5" x 1.5" backer tube.
View from outside of the shelter.
Upper Panel
Step 7
Installed 104213
U-Channel
Lower Panel
Drive FA4484B Tek screw with 102921 neo-bonded
washer through U-channel, both panels, and into the
1.5" x 1.5" square backer tube.
6. Repeat steps as needed to cut and attach additional
1.5" x 1.5" square tubes to secure overlap seam of all
panels. Install one tube per overlap as shown.
Space screws at 12" on-center.
Outside
Greenhouse
FA4484B Tek Screw &
Upper
102921 Neo-Bonded Washer
Panel
104779 Backer Tube
(inside greenhouse)
Inside
Greenhouse
104213
U-Channel
Mid
Panel
Actual frame may differ from example shown.
7. Install an additional Tek screw and washer at end of
H-channel if needed to secure channel to rafter. See
photo in Step 5.
8. Continue with next procedure.
FRAME CHECK
Before you attach the roll-up curtain, inspect the frame for
sharp edges or fasteners that could damage the curtain or
kit components.
1. Verify that all frame members are properly secured.
2. Verify that all bolts and clamps are tight.
3. Recheck the frame assembly for sharp edges or
clamps and bolts that may interfere with the installation
of the curtain. File or tape sharp edges as needed.
4. Reposition clamps and bolts as needed and tape all
rafter pipe joints with duct tape to protect the curtain.
5. Verify that the main building frame is properly and
adequately anchored.
Do not attach the roll-up curtain to an unanchored
frame.
NOTE: Do not climb on panels to install screws. Take
steps to protect panels during screw installation.
34
6. Continue with the next section.
Revision date: 05.29.19
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
INSTALL THE DOUBLE POLYLATCH U-CHANNEL
The double poly latch U-Channel (#104211) is attached to
each side of the frame and runs from the front to the back
of the greenhouse. Tek screws are used to secure the
U-Channel to each rafter and to secure the splice where
two separate U-Channel sections meet between two
rafters.
NOTE: When installed properly, the U-Channel is aligned
with the bottom of each polycarbonate panel.
Gather the parts:
• Aluminum U-Channel profile (#104213)
• Double poly latch U-Channel (#104211)
• Tek screws (#FA4482B)
ATTENTION: Consult the Main Cover Details diagram
in the Quick Start section of this manual to determine
where to install the double poly latch U-Channel. The
required distance from the finished grade to the bottom
of the double poly latch U-Channel is 42".
NOTE: Remove any Tek screws and washers that
interfere with the installation of the double U-channel.
The double U-channel must install at against the
polycarbonate panels.
3. Take additional 8' sections of double U-Channel, attach
these to the rafters, and work toward the other end of
the frame.
4. Measure and cut the last section of double U-Channel
so that it is flush with the end wall panel.
5. Repeat the steps to install the double U-Channel along
the remaining side of the greenhouse.
1. Take the first section of double U-Channel (#104211)
and cut a 6' length from that section.
Double
U-Channel
42"
Install the
#104213
U-Channel
here.
NOTE: The 2' remainder of the section is used to splice
the longer 8' sections together after they are attached
to the frame.
View shows a splice as seen from inside the
greenhouse. Dashed line indicates the ends of the
longer U-Channel sections attached to the rafters on
the outside.
6. Return to each double U-channel splice and secure
the splice using an 8" section of U-Channel cut from
the remaining U-Channel. Attach the 8" splice section
to the inside of the greenhouse as shown below. Install
Tek screws from outside shelter.
7. Return to each end panel attached to the end wall and
install a section of aluminum U-Channel (#104213)
along the edges between the double U-channel and
the ground. See the dashed line in the greenhouse
diagram near the top of the left column.
8. Continue by installing the roll-up side panels.
2. Position the 6' section of double U-channel ush with
the outside edge of the end wall panels at one end of
the frame, verify that the double U-Channel is level,
and using a Tek screw, secure the double U-channel to
the rst two rafters.
Revision date: 05.29.19
35
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
INSTALL ROLL-UP PANELS
ASSEMBLE THE ROLL-UP SIDE CONDUIT
This model includes a roll-up side panel for each side of the
greenhouse. The panel film material is typically shipped as
a single, 6' roll. Complete the following steps:
1. Locate the roll of side panel for the roll-up sides and
cut a length from the roll that is the length of the
greenhouse plus two (2) feet.
2. Stretch the roll-up panel out along the side of the
greenhouse and center it from end-to-end.
Gather the parts:
• Pipe 1.315'' x 75'' swaged 17 GA (#131S0075)
• Pipe 1.315'' x XX'' plain 17 GA (#131P0XX)
• Tek screws (#FA4482B)
The roll-up side conduit assembly is attached to the bottom
of the roll-up side cover material. This assembly runs the
length of the frame and serves as the center pipe that the
roll-up cover wraps around when it is opened to ventilate
the shelter. This conduit is identical to the purlins that were
assembled and attached to the frame.
NOTE: The number of pipes used in the roll-up conduit
assembly varies with the length of the greenhouse.
Roll-up conduit assemblies consist of multiple sections of
swaged 1.315" pipe at 75" in length (part #131S075) and
one (1) additional plain 1.315" pipe at a shorter length
(part #131P0XX) determined by the greenhouse, where
XX represents the remaining length required to complete
the roll-up conduit assembly and to reach the end of the
greenhouse.
Complete these steps to assemble the roll-up side conduit.
Photo are used for illustration purposes only. Frame shown
may differ from actual frame.
3. Using the upper channel of the double U-Channel and
the wire spring, secure the top edge of the film in the
channel.
4. With the top edge secured, spread the free end of the
panel out so that it hangs evenly from the secured
edge.
1. Locate all sections of pipe needed to assemble the
cover conduit.
2. Insert the swaged end of each pipe into the plain end of
another pipe until the conduit is assembled.
3. Secure each pipe joint with a Tek screw and tape over
the screw using duct tape.
4. Place the assembled conduit at the base of the rafters
along the outside of the greenhouse.
5. Repeat the steps to assemble the remaining cover
conduit.
6. Continue with the procedure that follows to attach the
conduit to the roll-up side panels.
5. Continue with the following roll-up procedures.
36
Revision date: 05.29.19
ATTACH CONDUIT TO ROLL-UP SIDE COVER
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
TWIST-OF-THE-WRIST ASSEMBLY
Gather the parts:
• Assembled conduits
• Fabric clips #CC6212 (Divide quantity in half.)
• Tek screws (#FA4482B)
To this point, the roll-up panels along both sides are
secured to and hanging down from the double U-Channel.
1. Unfold the remaining portion of the roll-up cover (if
needed) and evenly stretch it out on the ground along
the frame.
2. Working from the inside the frame, roll the assembled
cover conduit onto the edge of the cover.
3. Verify that the cover and conduit are evenly positioned
and tuck the cover edge under the conduit and begin to
turn the conduit in a clockwise direction.
NOTE: If the conduit begins to turn inside the cover
material and is unable to roll up the side evenly, secure
the cover material to the conduit with Tek screws and
fabric clips evenly spaced along the conduit.
Gather the parts:
• Aluminum channel
• Drive handle
• Gearbox and gearbox drive
• Mounting plate
• Bearing and threaded rod
• 3/8" nuts and washers
The Twist-of-the-Wrist Assembly is designed to roll up a
portion of the sides of the structure. The following steps
describe the assembly and its installation.
Threaded Rod
Purlin
Guide
Channel
Inside View
Diagram shows a different model and is used for illustration
purposes only.
4. Continue to roll the conduit until the excess cover
material is wound around the conduit.
5. Repeat these steps for the other side of the shelter.
6. With the excess cover material rolled up on the conduit
assemblies, continue with the Twist-of-the-Wrist Assembly procedure.
End
Rafter
Carriage
Bolt
Roll-up Side
Conduit
Bottom Purlin
1. Measure 1/2" in from the end of the cover conduit,
center-punch the location, and drill a 5/16" hole through
the cover conduit.
2. Insert a tubing adapter into the conduit and align
the holes of the adapter with the drilled holes in the
conduit.
Revision date: 05.29.19
37
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
TWIST-OF-THE-WRIST ASSEMBLY (continued)
3. Select the aluminum channel and drill a 3/8" hole
through the channel approximately 2" from the end and
attach a threaded rod using a 3/8" nut on each side of
the channel.
2"
6. Select the bearing bracket and attach the bearings as
7. Install the longer bolts with bearings on the side of the
8. For the spacers on the long bolts, insert a 5/16" nut
needed. (In some instances, the bearings may come
already attached.) Assemble as follows:
NOTE: Single bearings are attached to the sides of
the bracket and double bearings to the middle portion
of the bracket. Use 1/4" hex bolts and locknuts as
needed. Install a flat washer on both sides of each
bearing to insure proper operation of bearings and the
assembly.
bracket that has the two holes. Install these before
installing the double bearing assembles. See the
figures below.
over each bolt. These nuts are used as spacers only.
5/16" Nut
4. With lower end of the channel approximately 4" off the
ground, position the channel along the rafter at the end
of the building where the Twist-of-the-Wrist assembly
will be located.
5. Secure the upper end of the channel by drilling a 3/8"
hole through the end rafter and attach as shown. The
lower end of the channel will "float" and is not attached.
Top View
NOTE: Install a flat washer between the nut and the
end panel.
5/16" Nut
9. Slide the Twist-of-the-Wrist mounting plate over the
long bolts and secure the plate with two lock nuts.
Lock Nuts
10. Attach the Twist-of-the-Wrist gearbox to the mounting
plate using hex head bolts.
Photo shows a different model and is used for illustration
purposes only.
38
Revision date: 05.29.19
TWIST-OF-THE-WRIST ASSEMBLY (continued)
11. Using a carriage bolt, attach the square shaft to a
tubing adapter.
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
15. Attach the rolled conduit to the square shaft of the
assembly by inserting a carriage bolt through the hole
in the conduit and tubing adapter. Tighten the nut.
12. Slide the square shaft through the Twist-of-the-Wrist
gearbox.
13. Slide the Twist-of-the-Wrist assembly onto the
aluminum channel from the ground end. (This is the
free end of the channel.)
16. Attach the crank handle to the Twist-of-the-Wrist
assembly. (End panel is not shown in the above
diagram.)
17. Test the operation of the Twist-of-the-Wrist assembly
and repeat the steps for the remaining assembly.
NOTE: If the cover rolls in the desired direction, but
you want to turn the crank in the opposite direction for
the same result, unbolt, reposition the gearbox, and
remount it on the same side of the mounting bracket.
18. After installing both roll-up side panel assemblies,
continue with the next procedure.
14. Finish rolling the cover conduit in a clockwise motion
up to the Twist-of-the-Wrist assembly.
Revision date: 05.29.19
39
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
SEAL POLYCARBONATE PANELS
The following steps describe one way to seal the installed
panels.
NOTE: The amount of sealant needed to complete
the following steps will vary and depends on how
thick the sealant is applied. Call Customer Service at
1.800.245.9881 to purchase additional sealant if needed.
1. Open supplied sealant and apply a thin bead to outside
of upper panel to seal panel to U-channel.
5. Seal upper edge of both end walls with a bead of
6. Seal joint where ridge cap and panel meet if this was
sealant. See dashed line in diagram below.
Frame shown may differ from actual frame.
not done during assembly.
2. Seal seams between H-channel and ends of
U-channel.
3. Return to any holes in H-channel and repair these
using sealant.
Apply bead of
sealant here.
7. Cut a few pieces of foam gasket material (#104710)
and use to seal opening at peak of each end rafter.
Foam Gasket
Material
A scrap piece of sheet metal (not included) or similar
material can be cut to shape and sealed to flashing end
using silicone sealant.
4. Apply a bead of sealant along top of double poly latch
u-channel to seal joint at polycarbonate panels.
40
8. Read greenhouse care and maintenance information
that follows.
Revision date: 05.29.19
SHELTER CARE AND MAINTENANCE
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
Proper care and maintenance of the shelter is important.
Check these items periodically to properly maintain shelter:
• Regularly check all polycarbonate panels to see these
are secure and in good condition. Replace damaged
panels immediately.
• Check connections and all fasteners to verify these
remain tight.
• Do not climb or stand on greenhouse at anytime.
• Inspect anchoring system to verify all components
remain tight and in good condition.
• Remove debris and objects that accumulate on
greenhouse. Use tools that will not damage panels
cover when removing debris.
• Remove snow to prevent excess accumulation. Use
tools that will not damage polycarbonate panels when
removing snow.
• Check contents of shelter to verify that nothing is
touching panels that could cause damage.
• If greenhouse is disassembled and moved, inspect all
parts and connections before reassembly.
Space below is reserved for customer notes.
• Depending on contents, construction of shelter,
shelter materials, and shelter location, the potential
for condensation exists. GrowSpan™ offers several
items that can be used to help alleviate a condensation
condition.
Please contact a GrowSpan™ representative for
additional information.
• For replacement or missing parts, call 1-800-245-9881
for assistance.
Revision date: 05.29.19
41
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
QUICK START GUIDE
34' Gothic Pro Greenhouse
42
Frame shown may differ in length from actual frame.
Revision date: 05.29.19
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
Pipe
FRONT PROFILE
Pipe
IMPORTANT: If rafter support kits were
purchased for all or some of the interior rafters,
do not install the 116P120 chord pipe at the peak.
These are not used when support kits are installed.
Review the support kit instructions to install those
components during rafter assembly.
Revision date: 05.29.19
43
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
Ground
Level
44
SIDE PROFILE - 106314R
Revision date: 05.29.19
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
Level
Ground
SIDE PROFILE - 106315R
Revision date: 05.29.19
45
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
Level
Ground
46
SIDE PROFILE - 106316R
Revision date: 05.29.19
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
SIDE PROFILE - 106317R
Revision date: 05.29.19
Level
Ground
47
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
48
CONNECTIONS
Revision date: 05.29.19
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
CONNECTION - FRAME DETAILS
Revision date: 05.29.19
49
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
2
ATTENTION: Use only the 102897 square
tubing to assemble the end wall frame.
VIEW
L
C
-
48"
L
C
L
C
-
48"
L
C
L
C
L
C
22 7/8"
VIEW 1
L
C
-
48"
L
C
L
C
L
C
25 1/8"
92 1/4"
INSIDE DIM
VIEW 3
L
C
L
C
98 1/4"
L
C
L
C
22 7/8"
L
C
-
48"
L
C
NOTE: COLUMNS NOT DIMENIONED HAVE A NON-CRITICAL PLACEMENT
AND ARE USED FOR POLYCARBONATE SUPPORT.
END FRAME DIAGRAM - FRONT VIEW
L
C
-
48"
L
C
ALL END FRAMING TUBES ARE FULL LENGTH OR CUT
FROM 1 1/2" X 1 1/2" SQUARE TUBING.
50
Revision date: 05.29.19
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
CONNECTION - END WALL DETAILS
Revision date: 05.29.19
51
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
ATTENTION: Use only the 102897 square
tubing to assemble the end wall frame.
L
C
-
48"
L
C
L
C
-
48"
L
C
L
C
L
C
22 7/8"
L
C
L
C
25 1/8"
L
C
L
C
47 15/16"
L
C
L
C
25 1/8"
L
C
L
C
22 7/8"
L
C
-
48"
L
C
END FRAME DIAGRAM - BACK VIEW
NOTE: COLUMNS NOT DIMENIONED HAVE A NON-CRITICAL PLACEMENT
AND ARE USED FOR POLYCARBONATE SUPPORT.
ALL END FRAMING TUBES ARE FULL LENGTH OR CUT
FROM 1 1/2" X 1 1/2" SQUARE TUBING.
52
L
C
-
48"
L
C
Revision date: 05.29.19
Flat
Side
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
Center Groove
Install 1-1/2" Tek screws through
H-channel into building frame.
H-Channel
Flat side toward the sun.
Channel
toward sun.
UV-protected side
H-CHANNEL INSTALLATION INSTRUCTIONS
ATTENTION: Use only 1-1/2" Tek screws to
attach H-channel to building frame. Do not use
shorter screws. They will not hold. Do not use
washers on Tek screws when installing
The new H-channel design requires installation of the at side facing out with channel side toward the building. Some diagrams
and photos in this document show installation of original H-channel with channel side facing out. Design of new H-channel
does not allow channel-side out installation.
Use the diagrams on this page to install H-channel with at side facing out.
Revision date: 05.29.19
H-channel.
ATTENTION: Install all twin-wall polycarbonate panels with UV-protected side toward the sun.
53
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
ONE
4' X 8'
POLY
4' X 10'
POLY
4' X 8'
POLY
HALF
4' X 8'
POLY
EXCESS
USED HERE
TRIMMED AND
EXCESS
USED HERE
TRIMMED AND
4' X 8'
POLY
4' X 8'
POLY
4' X 8'
POLY
ONE
HALF
4' X 8'
POLY
4' X 8'
POLY
4' X 8'
POLY
4' X 8'
POLY
H-CHANNEL
U-CHANNEL
NOTE: INSTALL UV-PROTECTED SIDE OF PANEL TO THE OUTSIDE.
54
POLYCARBONATE PANELS - FRONT VIEW
4' X 10'
POLY
4' X 8'
POLY
Revision date: 05.29.19
EXCESS
USED HERE
TRIMMED AND
4' X 8'
POLY
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
4' X 8'
POLY
4' X 10'
POLY
4' X 8'
POLY
4' X 8'
POLY
4' X 8'
POLY
4' X 8'
EXCESS
USED HERE
TRIMMED AND
POLY
POLYCARBONATE PANELS - BACK VIEW
4' X 8'
POLY
4' X 8'
POLY
4' X 8'
POLY
4' X 10'
POLY
H-CHANNEL
NOTE: INSTALL UV-PROTECTED SIDE OF PANEL TO THE OUTSIDE.
Revision date: 05.29.19
4' X 8'
POLY
55
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
Polycarb
Rafter
104213
Polycarb
H-Channel
56
MAIN COVER DETAILS
Cut to Fit.
(47-1/4" x 144")
Upper Panel: 116051
Full
(47-1/4" x 96")
Lower & Mid Panels: 116049
104213
4”-6” Overlap
104213
4”-6” Overlap
Revision date: 05.29.19
GROWSPAN™ GOTHIC PRO GREENHOUSES AND SYSTEMS
Space below is reserved for customer notes.
Revision date: 05.29.19
57
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.