106201 14’ W x 8' 3" H x 16’ L
106202 14’ W x 8' 3" H x 20’ L
106203 14’ W x 8' 3" H x 24’ L
106204 14’ W x 8' 3" H x 28’ L
1
GROWSPAN™ ROUND PREMIUM GREENHOUSES
READ THIS DOCUMENT BEFORE YOU BEGIN
Thank you for purchasing this GrowSpan™ greenhouse.
When properly assembled and maintained, this product will
provide years of reliable service. These instructions include
helpful hints and important information needed to safely
assemble and properly maintain the greenhouse. Please
read these instructions before you begin.
If you have any questions during the assembly, contact
Customer Service at 1-800-245-9881 for assistance.
SAFETY PRECAUTIONS
• Wear eye protection.
• Wear head protection.
• Wear gloves when handling metal tubes.
• Use a portable GFCI (Ground Fault Circuit Interrupter)
when working with power tools and cords.
• Do not climb on the greenhouse or framing during or
after construction.
• Do not occupy the greenhouse during high winds,
tornadoes, or hurricanes.
• Provide adequate ventilation if the structure is
enclosed.
• Do not store hazardous materials in the greenhouse.
• Provide proper ingress and egress to prevent
entrapment.
ANCHORING INSTRUCTIONS
Prior to assembling this greenhouse, please read the
MUST READ document included with the shipment.
WARNING: The anchor assembly is an integral part
of the greenhouse construction. Improper anchoring
may cause greenhouse instability and failure of the
structure. Failing to anchor the greenhouse properly
will void the manufacturer’s warranty and may cause
serious injury and damage.
LOCATION
Choosing the proper location is an important step before
you begin to assemble the structure.
The following suggestions and precautions will help you
determine whether your selected location is the best
location.
• Never erect the structure under power lines.
• Identify whether underground cables and pipes are
present before preparing the site or anchoring the
structure.
• Location should be away from structures that could
cause snow to drift on or around the building.
• Do not position the greenhouse where large loads
such as snow and ice, large tree branches, or other
overhead obstacles could fall.
• Always check local building codes before you begin.
SITE
After choosing a location, proper preparation of the site is
essential. The following site characteristics will help ensure
the integrity of the structure.
• A level site is required. The site must be level to
properly and safely erect and anchor the structure.
• If the site is not level, use footings to provide a secure
base to assemble the structure. Pre-cast concrete
blocks, pressure-treated wood posts, or poured
footings are all acceptable when properly used. (Some
shelters use ground posts or rafter feet.)
• Drainage: Water draining o the structure and from
areas surrounding the site should drain away from the
site to prevent damage to the site, the structure, and
contents of the structure.
WARNING: The individuals assembling this structure
are responsible for designing and furnishing all
temporary bracing, shoring and support needed during
the assembly process. For safety reasons, those who
are not familiar with recognized construction methods
and techniques must seek the help of a qualified
contractor.
POLYCARBONATE PANELS
Do not allow panels to remain in direct sunlight with
protective film in place. Doing so will cause protective
film to become difficult if not impossible to remove before
installation.
Store panels indoors or cover with a light-colored
tarp until you are ready to install.
2
106201_02_03_04Revision date: 01.10.19
ASSEMBLY PROCEDURE
GROWSPAN™ ROUND PREMIUM GREENHOUSES
SHELTER CARE AND MAINTENANCE
Following instructions as presented will help ensure proper
assembly of your greenhouse. Failing to follow these steps
may result in an improperly assembled and anchored
greenhouse and will void all warranty and protection the
owner is entitled to.
Steps outlining assembly are as follows:
1. Verify all parts are included in shipment. Notify
Customer Service for questions or concerns.
2. Read these instructions, the Must Read document, and
all additional documentation included with shipment
before you begin.
3. Gather tools, bracing, ladders (and lifts), and assistants
needed to assemble greenhouse.
4. Check weather before installing roof cladding. Do not
install cladding on a windy or stormy day.
5. Re-evaluate location and site based on information and
precautions presented in documentation included.
6. Prepare site.
7. Assemble frame components in the order presented.
8. Assemble frame including struts (if equipped).
9. Consult MUST READ document and properly anchor
frame.
10. Install end wall frame.
11. Install end wall cladding and door.
12. Install roof cladding.
13. Read the care and maintenance information in next
column.
14. Complete and return all warranty documents as
instructed.
Proper care and maintenance of the shelter is important.
Check these items periodically to properly maintain shelter:
• Regularly check all polycarbonate panels to see these
are secure and in good condition. Replace damaged
panels immediately.
• Check connections and all fasteners to verify these
remain tight.
• Do not climb or stand on greenhouse at anytime.
• Inspect anchoring system to verify all components
remain tight and in good condition.
• Remove debris and objects that accumulate on
greenhouse. Use tools that will not damage panels
cover when removing debris.
• Remove snow to prevent excess accumulation. Use
tools that will not damage polycarbonate panels when
removing snow.
• Check contents of shelter to verify that nothing is
touching panels that could cause damage.
• If greenhouse is disassembled and moved, inspect all
parts and connections before reassembly.
• Depending on contents, construction of shelter,
shelter materials, and shelter location, the potential
for condensation exists. GrowSpan™ oers several
items that can be used to help alleviate a condensation
condition.
Please contact a GrowSpan™ representative for
additional information.
• For replacement or missing parts, call 1-800-245-9881
for assistance.
Revision date: 01.10.19 106201_02_03_04
3
GROWSPAN™ ROUND PREMIUM GREENHOUSES
REQUIRED TOOLS
SPECIAL NOTE: Baseboards for Frame
The following list identies the main tools needed to
assemble the shelter. Additional tools and supports may be
needed.
• Tape measure or measuring device
• Marker to mark locations on the pipes
• Variable speed clutched drill driver (cordless with
extra batteries works best)
• Saw to cut metal and polycarbonate panels
• Wrenches and impact socket set, or an adjustable
wrench
• Scissors, utility knife, or tin snips
• Hammers, rubber mallet, and gloves
• Flat bar or putty knives for panel installation
• Drill bit set that includes a 5/16" bit
• Chalk line
• Caulk gun to apply sealant
• Adjustable pliers and self-locking pliers
• Ladders, work platforms, and other machinery for lifting
designed to work safely at the height of the building
These instructions describe installing a baseboard
(recommended) at ground level along each side of the
frame. The baseboard runs from the front to the back of the
frame.
This baseboard is not included with the shipment and must
be supplied by the customer. Treated or recycled plastic
lumber works well for a baseboard.
The baseboard, when installed properly, helps prevent the
ground posts from sinking into the ground when anchored.
Depending on the building, it also provides a surface to
attach struts (if equipped) or other building components.
If used, the baseboard is installed after the roof panels.
Suggested baseboard dimensions: 2" x 6" (minimum).
Length determined by greenhouse. See page 32 for
additional baseboard comments.
QUICK START GUIDE
For a quick overview of the building and its components,
consult the information and diagrams in the Quick Start
section near the back of these instructions.
• Rope for temporary rafter bracing during frame
assembly
ASSEMBLY NOTE: Install Tek screws using a clutched
drill driver running approximately 750 RPM while applying
approximately 50 lbs of force.
Do not use an impact driver to install Tek screws!
UNPACK AND IDENTIFY PARTS
The following steps will ensure that you have all the
necessary parts before you begin to assemble the shelter
frame.
1. Unpack the contents of the shipment and place where
you can easily inventory the parts. Refer to the Bill of
Materials/Spec Sheets.
2. Verify that all parts listed on the Bill of Materials/Spec
Sheets are present. If anything is missing or you have
questions, consult the Pictorial Parts Guide and all
diagrams for clarication, or contact Customer Service.
NOTE: At this time, you do not need to open the plastic bags containing smaller parts such as fasteners or
washers (if equipped).
4
106201_02_03_04Revision date: 01.10.19
The following graphics and photos will help you identify
the dierent parts. (Some parts are not shown.)
GROWSPAN™ ROUND PREMIUM GREENHOUSES
FA4482B
Tek Screw
QH1330
Angle Bracket
Aluminum 8'
H-Channel Prole
FAH320B & FALB02B
Carriage Bolt & Hex Nut
FAH009B & FALB01B
Carriage Bolt & Hex Nut
102855
End Clamp
104548
End Cap Prole
Doors/Fans/Vents
102479
Cross Connector
104213
Aluminum
U-Channel Prole
108553 Wafer
Head Screws
111929 & 111928
H-channel Clear Plastic
102921 & FA4484B
Neo-bonded Galvanized
Washers and Long Tek Screws
104074
Square-to-Round Tube
Connect Bracket
QH1400
Band Clamps
104624
Square Tube Fitting
Revision date: 01.10.19 106201_02_03_04
QH1072
Post Driver
DE4007 Sealant
Plain
Swaged/Tapered
Swaged and Plain Rafter Sections
5
GROWSPAN™ ROUND PREMIUM GREENHOUSES
H-CHANNEL INSTALLATION INSTRUCTIONS
The new H-channel design requires installation of at side facing out with channel side toward building. Some diagrams and photos in this document may show installation of original H-channel with
channel side facing out. Design of new H-channel does not allow channel-side out installation.
Use the diagrams on this page to install H-channel with at side facing out.
ATTENTION: Use only 1-1/2" Tek screws to attach H-channel to building frame. Do not use
shorter screws. They will not hold. Do not use washers on Tek screws when installing
the 113236Z096 H-channel.
Flat
Side
Channel
UV-protected side
toward sun.
Flat side toward the sun.
Install 1-1/2" Tek screws through
H-channel into building frame.
Center Groove
H-Channel
ASSEMBLY NOTE: Install Tek screws using a clutched drill driver running
approximately 750 RPM while applying approximately 50 lbs of force.
Do not use an impact driver to install Tek screws!
ATTENTION: Install all twin-wall polycarbonate panels with UV-protected side toward the sun.
6
106201_02_03_04Revision date: 01.10.19
OVERVIEW
This section describes assembling your greenhouse. For
details, please see Assembling Frame Components. See
illustration below to identify main parts of greenhouse.
GROWSPAN™ ROUND PREMIUM GREENHOUSES
GrowSpan™ Round
Premium Greenhouses
ATTENTION: Position purlins evenly during the frame assembly.
Use the rafter pipe joints as guides when installing the end
clamps, cross connectors, and purlins.
1. Locate required parts for each assembly procedure.
2. Assemble rafters and frame.
3. Anchor frame.
4. Assemble and install end walls.
5. Install door.
6. Prepare and attach end panels.
7. Prepare and attach roof
panels.
Interior Rafter
End Rafter
Purlins
Revision date: 01.10.19 106201_02_03_04
Customersupplied
Baseboard
Ground
Post
Frame length may dier from actual frame.
7
GROWSPAN™ ROUND PREMIUM GREENHOUSES
LAY OUT BUILDING SITE
After the site is prepared, lay out building site.
Taking these steps before assembling the shelter saves
time and ensures that the structure is positioned as
desired.
Drive ground posts to the proper depth. Width of the shelter
is measured from the center of one ground post to the
center of the remaining ground post.
SQUARE THE SITE
Gather the parts:
• Ground posts
• 5/16" x 2-1/2" machine bolts
• 5/16" nuts
1. Identify a corner where a ground post will be positioned
and drive the rst ground post into the ground.
NOTE: Insert the ground post driver into the top of
the ground post to protect the post and drive the post
into the ground. The top of the post will be twelve (12) inches above the nished grade when properly driven.
3. Use a transit or line level to drive the second corner
post to the same depth as the rst ground post.
4. String a line at least as long as the building from the
rst stake at 90°.
NOTE: A transit can be used to ensure an accurate 90°
angle, or the 3-4-5 rule can be used. Refer to diagram.
Using multiples of 3-4-5 such as 6-8-10 or 12-16-20
helps to maintain an accurate 90° angle.
Ground Post
Outside of
Shelter
Inside of Shelter
ATTENTION: Position the pre-drilled holes facing to the
inside/outside of the shelter so they can be aligned with
the bolt holes in the rafter legs.
To align the bolt holes in the ground posts with those
in the rafter after driving the ground posts, insert a
tapered rod or pry bar into a ground post bolt hole and
turn the post using the rod or pry bar.
2. After the rst corner ground post is in place, string a
line the width of the building (center-to-center) and
drive the second ground post into the ground just
enough to hold it in place.
5. After squaring the position of the building, measure
the length (center-to-center) and drive the next corner
ground post.
6. Repeat the same step for the last corner post.
NOTE: The distance measured diagonally between
corner posts must be equal for the building to be
square.
7. Check all dimensions (and adjust if needed) before
driving the remaining posts to the required height.
8. After all corner posts are accurately installed, tie a
string line between the tops of the corner ground posts
on the same side of the shelter. The string is used to
identify the tops of all remaining ground posts. The
string must remain tight and level.
9. Use a tape measure to mark the 48" on-center
locations of the remaining ground posts.
10. Drive the remaining ground posts into the ground at the
required 48" on-center width and the height identied
by the string. See Step 1 if needed.
NOTE: Verify that the holes in the ground posts are in
the proper position and that each post is plumb and
driven to the correct depth.
11. Continue with the Rafter Assembly steps that follow.
8
106201_02_03_04Revision date: 01.10.19
ASSEMBLING FRAME COMPONENTS
GROWSPAN™ ROUND PREMIUM GREENHOUSES
After site is prepared and an inventory of parts is complete,
continue with the rafter assembly.
NOTE: All rafter assemblies consist of rafter tubes and
purlin clamps. Consult the Front Prole diagram in the
Quick Start section of these instructions before and during
the rafter assembly process.
Assistance is required to assemble the greenhouse frame.
RAFTER ASSEMBLY
Gather the parts:
• Rafter pipe (#14R1301D)
• Rafter pipe (#14R1302)
• Rafter pipe (#14R1303)
• End clamps (#102855)
• Tek screws (#FA4482B)
• Magnetic nut setter 3/8'' x 2-9/16"
END RAFTER ASSEMBLY
The end rafters include purlin end clamps. Install the purlin
end clamps before the dierent pipes of the rafters are
connected.
2. Slide three (3) end purlin clamps over the rafter pipes.
End clamp as seen from outside the assembled rafter.
NOTE: Consult the Front Prole diagram in the Quick
Start section for proper end clamp placement and
position.
3. After slipping the clamps over the rafter pipes, insert
the swaged end of the rafter pipes into the plain ends
of the pipes to assemble the rafter.
1. Select the four (4) pipes needed to assemble the rst
end rafter and arrange on a level surface.
(#14R1302)
(#14R1301D)
(#14R1303)
ASSEMBLY NOTE: Install Tek screws using a clutched
drill driver running approximately 750 RPM while applying
approximately 50 lbs of force.
4. Once the rafter is assembled, install a Tek screw
through the rafter pipes to secure each joint. See the
diagram above.
IMPORTANT: Verify that you are installing the screw
through the pipe that contains the swaged end of the
adjacent pipe. To prevent damage to the cover and end
panels (if equipped), position the Tek screws so the
heads do not contact the cover when it is installed.
5. Repeat steps to assemble the remaining end rafter and
set both end rafters aside.
Do not use an impact driver to install Tek screws!
Revision date: 01.10.19 106201_02_03_04
9
GROWSPAN™ ROUND PREMIUM GREENHOUSES
RAFTER ASSEMBLY (CONTINUED)ASSEMBLE FRAME
INTERIOR RAFTER ASSEMBLY
Complete the following steps for the interior rafters.
1. Select the pipes for the rst interior rafter assembly and
position these on the ground as shown.
Gather parts:
• All rafter assemblies and cross connectors (102479)
• Purlin pipe 1.315'' x 75'' swaged (131S075)
• Purlin pipe 1.315'' x XX'' plain (131P0XX)
• 5/16" x 2-1/2" machine bolts and 5/16" nuts
• Tek screws (FA4482B)
(#14R1302)
(#14R1301D)
(#14R1303)
IMPORTANT: Interior rafters do not use end clamps.
Instead, cross connectors are attached during the
frame assembly.
2. Insert the swaged ends of the rafter pipes into the plain
ends of the pipes and secure each joint with a Tek
screw.
• Marker and tape measure
• Lifts, ladders, and assistants
• Rope or cable to temporarily brace rafters
NOTE: The purlins run perpendicular to rafter assemblies.
Each purlin consists of 1.315" x 75" (131S075) swaged
pipes (number is determined by shelter length) and one (1)
1.315" x XX" (131P0XX) plain pipe. Consult Side Prole
drawings for XX part identication.
Complete these steps to assemble frame.
1. Carefully stand rst end rafter and place leg pipes in
rst set of ground posts. Verify nuts and bolts of end
clamps are to the inside of the frame.
End Rafter
Toward inside the
greenhouse.
Purlin
NOTE: For longer frames, it may be easier to assemble
a few rafters at a time and then begin to assemble the
frame.
3. Once rafters are assembled, assemble the frame.
10
2. Secure leg pipes to ground posts using 5/16" x 2-1/2"
machine bolts and nuts.
Rafter
5/16" x 2-1/2"
machine bolt
and 5/16" nut
Inside of
Shelter
Outside of
Shelter
Ground
Post
106201_02_03_04Revision date: 01.10.19
3. Use rope or cable to brace rafter in position.
12' wide
center-to-center
4. Carefully position rst interior rafter in place and secure
leg pipes to the ground posts.
5. As second rafter is steadied, take one 131S075 pipe
and insert purlin pipe (plain end) through top end clamp
of end rafter and through a cross connector at top of
interior rafter. Consult Quick Start section for purlin
location per frame.
GROWSPAN™ ROUND PREMIUM GREENHOUSES
8. Move to the interior rafter, set rafter spacing at
forty-eight inches (48") on-center (adjust forward or
backward as needed), and tighten cross connector.
9. Secure cross connector to rafter and purlin using Tek
screws. See Quick Start section if needed.
Interior Rafter
Purlin
Tek
Screw
10. Repeat Steps 5 - 9 to install rst section of each purlin
assembly for rst two rafters.
Interior Rafter
End Rafter
6. Align plain end of purlin with outside edge of end rafter.
Do not allow pipe to extend beyond edge of rafter tube.
Do not allow
purlin to extend
beyond end rafter.
End Rafter
End
Rafter
Purlin
Ground Level
11. Choose another interior rafter assembly and set it
in position. DO NOT USE THE REMAINING END
RAFTER.
12. Secure rafter legs to ground posts as previously
described and steady the rafter.
13. Add another 131S075 pipe to top purlin pipe and
secure pipe joint using an FA4482B Tek screw.
7. Tighten end clamp and secure it to rafter and purlin
using an FA4482B Tek screw.
Revision date: 01.10.19 106201_02_03_04
Purlin
11
GROWSPAN™ ROUND PREMIUM GREENHOUSES
FRAME ASSEMBLY (CONTINUED)
14. Verify distance between rafters is 48" center-to-center.
Adjust rafter forward or backward as needed. Tighten
cross connector and secure connector to purlin and
mid rafter. (See Step 9.)
Frame length may dier
from actual frame.
Ground Post
15. Repeat steps as needed to add and attach next
sections of purlin pipes. See arrows in above diagram.
Dashed line shows
ground level.
ANCHOR THE ASSEMBLED FRAME
At this point, anchor the greenhouse frame. Consult the
MUST READ document for anchoring information and
suggestions. Please call customer service at 1-800-2459881 for additional anchoring information.
Rafter and
Ground Post
Anchor Assembly
(Additional Purchase
Required)
16. Stand and secure remaining interior rafters and purlins
to complete frame assembly.
17. Finally, stand and secure end rafter to ground posts
and attach purlins. Verify end clamps are positioned with the nut and bolt inside assembled frame. Refer
to the Quick Start section and previous diagrams if
needed.
NOTE: If last end rafter is plumb and purlin extends
beyond end rafter, cut the last section of plain purlin
pipe (131P0XX) to required length.
Typically purlins do not require cutting. Verify you have
correctly assembled purlins using correct pipes before
cutting any pipe to length. Review Side Prole diagram
for you building in Quick Start section.
18. Return to each pipe splice of each purlin and each
rafter and verify that a Tek screw is installed to secure
the joint. Install a Tek screw if needed.
19. Remove any temporary bracing (if needed) and anchor
the frame.
Ground Level
CAUTION: The anchor assembly is an integral part of
the greenhouse construction. Improper anchoring may
cause instability and failure of the structure to perform
as designed. Failing to anchor the shelter properly
will void the manufacturer’s warranty and may cause
serious injury and damage.
ASSEMBLY NOTE: Install Tek screws using a clutched
drill driver running approximately 750 RPM while applying
approximately 50 lbs of force.
Do not use an impact driver to install Tek screws!
12
106201_02_03_04Revision date: 01.10.19
END WALL INSTALLATION
Steps to install end walls for greenhouse include:
1. Install end wall framing. (See diagrams in Quick Start
section at back of these instructions. Read installing
accessories note below.)
GROWSPAN™ ROUND PREMIUM GREENHOUSES
Complete these steps to install the accessory framing:
1. Based on the installation requirements and precautions
of the accessory, choose a location in the end wall to
mount the accessory, and cut a 1.5" x 1.5" frame tube
to the required length for framing.
2. Prepare polycarbonate end panels and attach.
3. Assemble doors and attach.
INSTALL END WALL FRAMING
Site variations and different methods for anchoring
greenhouse may require slight changes to these
instructions. It is the responsibility of the owner/builder to
adapt these instructions as needed to adjust for these and
other differences.
INSTALLING END WALL FRAMING FOR OPTIONAL
HEATERS, VENT FANS, AND MOTORIZED SHUTTERS
(if equipped):
Optional accessories such as heaters, vent fans and
motorized shutter units are typically installed or attached
to end walls. Additional horizontal framing (included) is
installed between vertical end wall frame tubes to mount
most accessories. Spacing shown for end wall supports
on end frame diagrams may be too narrow for some
larger accessories. Diagrams do not show framing for
accessories.
When framing end wall, consult installation instructions for
accessories (if equipped), or measure width of accessory
to accurately space and position end frame tubes. Consult
panel installation diagrams in Quick Start section.
Before installing any greenhouse accessory, adhere to the
following:
2. Attach these horizontal frame tubes between the
vertical frame tubes (at required height determined
by instructions included with accessory) using angle
brackets.
INSTALL END WALL FRAMES
Refer to Quick Start section for layout of frame. Materials
and parts needed to assemble end frame include:
• Square tube (102897)
• Square tube tting (104624)
• Angle brackets (QH1330) & band clamp (QH1400)
• Square-to-round tube connect bracket (104074)
• Carriage bolt (FAH320) and nut (FALB32B)
• Tek screws (FA4482B)
Complete these steps:
1. Locate square metal tubing for base tube. Base tube
consists of two (2) 99" swaged tubes joined and cut to
length. See Quick Start section for clarication.
2. Insert swaged end into plain end to connect tubes.
3. Position assembled base tube on ground between legs
of end rafter at front of greenhouse. Anchor it in place.
• Consult end frame diagrams before installing accessory
horizontal framing.
• Consult diagrams in Quick Start section showing
polycarbonate panel locations and locations of
aluminum trim and prole before repositioning any end
wall vertical.
• DO NOT MOVE END WALL VERTICALS USED AT
THE SEAM OF TWO (2) POLYCARBONATE PANELS.
• Always consult installation guides that shipped
with accessory for additional precautions,
recommendations, and safety requirements.
• All electrical work to be completed by a licensed
electrician and according to established codes.
• For gas heaters, a professional, qualied service
technician must install the unit.
Revision date: 01.10.19 106201_02_03_04
NOTE: This base tube will be directly below and in line
with the end rafter.
13
GROWSPAN™ ROUND PREMIUM GREENHOUSES
END WALL INSTALLATION (continued)
4. Secure base tube to end rafter ground posts using
angle brackets and FA4482B Tek screws.
The bracket shown in this
diagram can be installed
with either its short section
(as shown) or long section
attached to ground post.
Baseboard is not shown.
10. Measure distance between top of base tube and band clamp (Step 7) to determine length of door jamb.
11. On this frame tube, mark length determined in Step 10
(above) and subtract the amount needed to account for the square-to-round tube connect bracket, which
attaches to top of jamb. See diagram below. Cut tube
accordingly at swaged end to t.
Ground
Post
Base Tube
5. On base tube surface facing inside the greenhouse,
install a short Tek screw at each splice joint.
6. Mark center of base tube.
7. Measure width of door that shipped with greenhouse.
Mark lines accordingly to determine position of vertical
frame tubes.
8. Place band clamps on end rafter above the lines as
shown below. DO NOT TIGHTEN BOLTS AT THIS
TIME.
End Rafter
Front (or outside)
of the greenhouse
Square-toRound Tube
Connect
Bracket
Door Jamb
12. Select a square-to-round tube connect bracket and
attach bracket to one end of door jamb. Use a 5/16"
drill bit to drill a hole through tube and attach bracket
using a nut and carriage bolt.
13. Repeat steps to cut remaining door jamb.
Door Jamb
Position
Width of
door
center
Mark lines.
9. Select tubing for two vertical frame tubes (jambs) for
sides of door. Each support includes one (1) long 99"
section of square tubing (102897 swaged end) and one
(1) square-to-round tube bracket (104074).
14
14. With square-to-round tube bracket attached to top of
each door jamb, use band clamp bolt to attach bracket
to the band clamp. DO NOT TIGHTEN AT THIS TIME.
NOTE: Position bolt heads for each clamp to the
outside. At this point, door jambs should be loosely
attached to end rafter.
106201_02_03_04Revision date: 01.10.19
INSTALL THE END WALL FRAME (continued)
15. Using marks on base tube for rough door opening
(Steps 6 & 7), attach bottom of each door jamb to base
tube using an angle bracket and Tek screws. Consult
end frame diagram if needed.
Center of
Door Frame
Tube
Door Opening
Angle Bracket
Base Tube
Mark (Step 6)
16. Verify both door jambs are plumb and recheck width.
Adjust if needed. Tighten top band clamp and install a
short Tek screw through clamp into rafter.
17. Using 24" on-center measurements, mark positions
of remaining vertical frame tubes. Place band clamps
on end rafter above lines on base tube. Do not tighten
bolts at this time.
GROWSPAN™ ROUND PREMIUM GREENHOUSES
19. Repeat Steps 10 -11 to cut each tube for the remaining
vertical frame members.
ATTENTION: Remember to subtract amount needed to
account for square-to-round tube bracket.
20. Choose a square-to-round tube bracket and attach
to one end of tube. Use a 5/16" drill bit to drill a hole
through tube. Attach bracket to tube using a nut and
carriage bolt.
Position all screws, bolts
and clamps so they will
not damage end
panels when
panels are
attached to
frame.
End Rafter
21. Place a square tube tting on bottom of frame tube.
Band Clamp
Square-toRound Tube
Connect
Bracket
Front (or
outside) of the
greenhouse
20"
On-Center
28"
On-Center
28"
On-Center
20"
On-Center
Mark lines.
18. Choose parts for each remaining vertical frame tube.
Each vertical support includes one (1) long 99" section
of square tubing (102897 swaged end), one (1) squareto-round tube bracket (104074), and one (1) square
tube tting (104624) to attach support to base tube.
22. Align center of frame tube with center mark on base
tube and attach top to the band clamp. Do not tighten.
104624
Center Mark
23. Verify that frame tube is plumb and use FA4482B Tek
screws to secure square tube tting to base tube.
Revision date: 01.10.19 106201_02_03_04
15
Loading...
+ 34 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.