2.3 Symb ol s in trod uction on the
SPH inve rt er
Growatt SPH seri es i nverter
3. 1
3. 2 Labe l Ex planation
3.3 Size a nd w ei ght
3. 4 The ad va ntage of the unit of
Growatt SPH
4 Unpacking
5 Installation
Basic in st al lation requirements
5.1
Instal la ti on req uire s to ols and
5. 2
RJ 45 term in al s equence of the
LAN line
5. 3 Inst al lation Instruct io ns
5.4 SPH Sy st em C onnection Mod e
6 Commissioning
6. 1
Commis si on ing of SPH
6. 2 Oper at ion modes
6. 3 Coun tr y setting
6. 4 Disp la y and button
6.5 Comm un ic ation
11 Decommissio ning
11.1 Dis ma nt ling the energy s to ra ge
11.2 Pac ki ng t he SPH inverter
11.3 Sto ri ng S PH inverter
11.4 Dis po si ng of theSPH inve rt er
7
Start-up and shut down
system
SPH
8 Attention of the installation
environment, maintenance
and cleaning
9 Fault removal
10 EU Declaration of Conformity
7. 1 Star t- up the SPH system
7. 2 Disc on nect the SPH system
12 Product specification
13 Certificate
14 Contact
Growatt SPH seri es e nergy
14.1
storag e ma ch ine product specifica ti on
14.2 DC in pu t te rminal parame te r
14.3 Torque
14.4 App en di x
1 Brief Introduction
1.1 Preface
This man ua l wi ll pro vide the users who us e th e Grow at t SPH TL3 BH Series o f Sh en zhen
Growatt New Ener gy Tec hnology Co.,LTD(Short for Growatt as bel ow ) with the detailed
product inform at ion and the install at ion instruction s. P lease re ad this manual carefull y
and put th is m an ual on some place w he re is co nv enient to install at ion, operation, o bt ain.
Any modi fi ca tions of Growatt new ener gy, we will not not if y the user.
1.2 Target Group
Growatt SPH TL3 BH i nv erter must be insta ll ed by prof essional elec tr ic al personnel who
have obt ai ne d the certifica ti on o f the re levant departme nt s. We ha ve t wo kinds of
energy s to ra ge machine for di fferent batt er y on e is for lithium ba tt er y and the other is
for lead -a ci d battery, we s ug gest: custome r sh ou ld decide which k in d of e nergy storage
machin e yo u wa nt, Growatt can provide only li th iu m battery with en er gy s torage
machin e, c us tomer can choos e le ad -acid energy st or ag e machine with no b at te ry pro vide
by Growatt while t he y can buy these batte ry f ro m ma rk et easily. Es pe cially if custome r
choose e ne rg y storage syste m wi th l ithium batter y( wh ich must be provide by Growatt)
but used f or l ea d-acid batter y or u se d lead-acid bat te ry f or lithium batt er y mo del, it will
be dange rous. In st aller can install e ne rgy storage machi ne o f Grow at t SPH TL3 BH Series
rapidl y an d trou bl eshooting, buil d co mmunication sys te m thro ug h re ad t hi s manual
carefully.If you have any quest io ns in the process of installa ti on, you can login in
www.growatt.c om a nd leave some messa ge .Or you can call our 24 -h our service
hotlin e+ 86 0 755 2747 1942.
1.3 Additional information
Growatt SPH TL3 BH S er ies is used to store energy g en er ated by the photovo lt aic cell
panels o r en er gy fro m grid if it is allowed i n th e battery, al so e ne rgy can be sent to po we r
grid through SPH T L3 B H for self consumpt io n or when Grid power is l os t, SPH TL3 BH can
be used as b ac ku p power.
SPH seri es h as s ix kinds of type:
Note: we d es cr ibe this series a s “S PH ” as below.
1
Overvi ew :
Chart 1. 1
Positi onDescri pt io n
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
LED of sta tu s di splay
LCD screen
Functi on b ut ton
Ground point
EPS outp ut (o ff g ri d connection)
RSD(do n ot o pe n except by Professiona l st aff)
AC Grid (o n gr id c onnection)
Rj45 int er fa ce of DRMs(used o nl y in A ustralia)
NTC: Lea d- ac id temperature sensor t er minal
RS485 co mm un ication inter fa ce o f meter2(Rese rv ed )
RS485 co mm un ication inter fa ce o f Lithium batte ry
Rs485 co mm un ication inter fa ce o f meter1
CAN comm un ic ation interfa ce o f Li thium battery
RS232/ Wi-Fi/shi ne link cover board
Antenn a
PV switc h
PV input
Batter y te rm inal
Breathable val ve
USB inte rf ac e
DIP swit ch (s et safety stand ard)
Dry cont ac t
2
1.4 Safety Instructions
1.Plea se b e cl ear which kind of b at te ry system you wan t, l it hium battery sy st em o r lead-
acid bat te ry s ystem, if you cho os e th e wron g system, SPH can't w or k normally.
2.Plea se read th is m anual carefully before the inst al lation, The compa ny h as t he right not
to quali ty a ss urance,If not a cc ordi ng t o the instruction s of t his manual for inst al lation
and caus e eq ui pment damage.
3.All th e op er ation and conne ct io n please professional e le ctrical or mechan ic al engineer.
4.Duri ng i ns tallation, Pl ea se d on't touch the ot he r pa rts within the bo x.
5.All th e el ec trical instal la ti on must comply wi th t he l ocal electric al s af ety standards.
6.If equ ip me nts needs to main ta in , Please contac t wi th l ocal specify sy st em i nstallation
and main te na nce personnel .
7.Use th e eq ui pment to combin ed t o gr id needs to obtai n th e pe rmission of loc al p ow er
supply d ep ar tment.
8.When i ns ta ll PV modules in th e da yt ime, please tur n off th e PV switch, Othe rw is e it will
be dange rous as hi gh t erminal voltage o f mo dules in the sunshi ne .
As shown a bo ve , a complete grid -c on nected system o f SP H co nsists of PV modu le s, S PH
invert er, battery, ut ility grid and othe r co mponents.
Attent io n:
As the sys te m refe r to b attery use, We must make su re venti la tion of the service
environment an d te mperature control in order to prevent the dange r of b at tery
explos io n, B attery recommended in st allation environmen t mu st b e strictly in accordanc e
with the s pe ci fication,if the s pe ci fication is IP2 0 en vi ro nm ent, the pollutio n de gree o f
the unit i s PD 2, m eanwhile the te mp er ature should be control in the 0- 40℃ o f in door
ventil at io n and the humidit y sh ou ld be 5%-85%. If th e ch os en PV modules nee ds t o
positi ve o r ne gative ground connect io n, please contact w it h Grow at t for technical
suppor t be fo re i ns tallation.
2.2 Safety Measure
2 Safety
2. 1 UsePurpose
The syst em c ha rt of SPH:
PV Arr ay
Ele ctric al Grid
1
2
L1
L2
L3
N
Elec tic met er
L1
L2
L3
N
Elec tic met er
DC
Brea ker
AC
Brea ker
Bat tery
DAN GER
Risk of hi gh v ol tage!
Releva nt o pe ration for profession al p ersonnel.
Please n ot ic e children, disabled, l ay people do not close .
Hyb rid Inv erter
Hybrid
EPSGri d
Brea ker
AC
Brea ker
Sen sor
Loa d
5m
Rail Log
5m
10m
ATS-T
Hybrid
EPS
Loa d
Superv is e an d make sure children don't play n ea r th e installatio n po si tion of energy
storag e ma ch ine.
DAN GER
Risk of bu rns on the parts sh el l of SPH inverter!
During t he w or k, Cover, she ll a ro un d, radiator is like ly t o be h ot.
CAU TION
SPH inve rt er e xists radiati on m ay be aff ect health!
Don't st ay a l on g time within 20c m ra ng e from S PH inverter.
SPH inve rt er g round connect io n
Please e ns ure SP H in verter ground connect io n is rel ia ble for make sure people's sa fe ty.
2.3 Symbols introduction on the SPH inverter
Symbol
Descri pt io n
Cautio n: R is k of electrical s ho ck !
Chart 2. 1
Cautio n : ho t su rface!
3
4
Cautio n: r is k of danger!
Danger t o li fe d ue to high voltag e in S PH .
There is residual volt ag e in S PH, SPH requires 5 minutes to
discha rg e.
Please w ai t 5 mi nutes before you open the u pp er lid or the DC lid.
Protective con du ctor terminal
Direct Current(DC)
Alternating Current(AC)
The mach in e co mplies with the requirement s of t he a pplicable
CE guide li ne s
Refer to t he o pe rating instru ct io ns.
3 Product Description
3.1 Growatt SPH series inverter
Marks of S PH
3.2 Label Explanation
Label co nt ai ns the followin g in fo rmation: for ex am pl e SPH 10000TL3 BH s ho ws a s below:
Mark
5
Descri pt io n
Push-b ut to n
Status s ym bo l of SPH
Explan at io n
Operat io n of d isplay screen and set sys te m
Green light on
Red ligh t on
Green light blin ki ng
Red ligh t bl in king
SPH run no rm al ly
fault st at e
Alarm st at e
Softwa re updat in g
21
6
Descri pt io n of label:
The type o f produc t
PV input d at a
Max. PV vo lt ag e
3.3 Size and weight
Growatt SPH 1000 0T L3 BH
1000Vd c
PV volta ge r an ge
PV Isc
Max. inp ut c ur re nt
AC outpu t/ in put data
Max. out pu t po wer
Max. app arent po we r
Nomina l ou tp ut voltage
Max outp ut c ur re nt
Nomina l ou tp ut Fre quency
Power fa ct or r ange
Stand al on e da ta
Nomina l AC o ut put power
Nomina l AC o ut put voltage
Nomina l AC o ut put Frequency
Batter y da ta
Batter y vo lt age range
Max. cha rg e an d discharge cur rent
Type of batt er y
Others
160~10 00 Vd c
15A*2
12A*2
10000W
10000VA
3W/N/P E
230/40 0Va c
15.2A
50Hz/6 0H z
0.8 lead in g~ 0.8 lagging
6000W
230/40 0Va c
50Hz/6 0H z
160~55 0V dc
21A
Lithiu m / Le ad -acid
Chart 3. 1
A(mm)B(mm)C(mm)
Growatt SPH TL3 BH
45350519828
3.4 The advantage of the unit of Growatt SPH
weight (k g)
Safety l ev el
Ingress Protection
Operat io n Am bient Temperatu re
ClassⅠ
IP65
-25℃~+60℃
Features below :
ØAll in one d es ig n. Can improve self consu mp tion, back up and als o pi nch the valley.
ØSmart ma na ge ment, work mode c an b e se t.
ØSafe bat te ry u sed.
ØEasy ins ta ll ation.
Certif ic at es Number
7
( For Aust ra li an models)
ØTwo mp p tr ac ker input.
8
4 Unpacking and inspection
Installation 5
Before unpacking, please check whether there are any visible external dam ag es . A fter
unpack in g, pleas e c he ck wh ether there dam ag es or missi ng of the parts, if it happen,
please c on ta ct with supplie r.
Growatt SPH seri es a nd accessories sh ow s as follows:
Chart 4. 1
Item
A
B
C
D
E
F
G
H
I
J
K
L
M/N
O/P
9
Number
1
1
1
1
1
1
1
1
1
4
1
4
2/2
1/1
Descri pt io n
SPH inve rt er
User Man ua l
Paper bo ard(in st allation guide)
Wat er proo f cover
AC Grid co nn ec tor
EPS outp ut c on nector (red connector )
Commun ic at ion cable
Lead-a ci d ba ttery tempera tu re sen so r
RJ45 con ne ct or
M6 setsc rew
Ground termina l
M4 setsc rew
Mc4 conn ec to r(black conne ct or )
Mc4 conn ec to r (blue connect or )
5.1 Basic installation requirements
A. The ins ta ll ation locatio n mu st b e suitable for SP H' s we ight for a long per io d ti me.
B. The ins ta ll ation locatio n mu st c onforms with di me ns ion of SPH.
C. Do not in st al l the unit on struc tu res co ns tructed of flamma bl e or thermo labile
materi al s.
D. The Ing ress Protect io n ra te is IP65 and the po ll ut ion degree is PD2. Please refer to th e
below:
Chart 5. 1
E. Batte ry i ns tallation opt io n is n ot far away from the positi on o f SPH, the length
betwee n SP H an d battery shoul d no t be m ore th an 5m.
F. The ambient tempe ra ture s ho uld be -25℃~60℃.
G. SPH can b e in st alled in vertic al o r le an back on plane, P le as e re fe r to the below:
Chart 5. 2
10
H. Insta ll at ion position sh al l no t prev ent access to the dis co nnection means.
I. In order to ensure mach in e ca n run normally an d ea sy t o operate, plea se p ay a ttention
to provide adequ at e space for SPH, Plea se ref er t o be low:
Chart 5. 3
J. Do not in st al l the machine nea r te le vision antenn a or a ny o ther antennas a nd a nt enna
cables .
K. Don't i ns ta ll the machine in t he l iv ing area.
L. Be sure that the ma ch ine is out of the child ren' s reach.
M. Taking th e ba tt ery fixing spac e in to a ccount, about t he d im ensions pleas e reference
user man ua l.
N. The Inf la mm able and explos iv e da ngerous goods must not be p la ced arou nd battery in
case of ca us e se rious danger.
No.
1
2
3
4
5
6
7
LAN line R J4 5 se quence as follo w:
Descri pt io n
Press the RJ45 ter mi nal
Press battery te rm inal connector
Discon ne ct P V terminal
Unscrew nut
Unscrew screw
Knock ex pa ns ion screw
Drill ho le s on t he wall
Chart 5. 5
5.2 Installation requires tools and RJ 45 terminal sequence of the
LAN line.
When ins ta ll ing,we need to use to ol s as f ollow,prepare the follow tools be fo re
instal li ng:
Chart 5. 4
11
LAN line 1 -8 c ol ors as below:
PIN
Color
1
White
orange
2
Orange
3
White
green
Chart 5. 6
4
Blue
5
White
blue
6
green
7
White
brown
8
brown
12
5.3 Installation Instructions
5.3.1 At te nt ion Layout(leng th o f se nsors conside r)
Growatt SPH4 00 0-10000TL3 BH o nl y use meter a s it s sensor, bef ore in stalling your
system y ou s ho uld know someth in g as b elow:
1.The ca bl e of m eter is suggest ed n ot l onger than 15m. B ec au se of this, you sho ul d
consid er t he c able length bet we en S PH and combiner b ox .
2.The me te r mu st installed in t he L l in e.
3.The in st al lation layout o f en er gy storage syst em a t ho me shows as follo wi ng :
Hyb rid Inv erter
4.Dril l fo ur Ф 8 holes at the mark p oi nt , the depth is not le ss t ha n 55mm.
5.Knoc k fo ur e xplosion bolt i nt o Ф8 h oles (As the char t 5. 8b b elow).
6.Hang t he e ne rgy storage mac hi ne o n the four setscrews (As th e ch art 5.8c below).
7.Lock t he n ut o f setscrew (As the chart 5. 8d b elow).
8.The wh ol e in stallation ha s fi ni shed.
PV Arr ay
Ele ctric al Grid
1
2
L1
L2
L3
N
Ele ctic me ter
L1
L2
L3
N
Ele ctic me ter
DC
Bre aker
AC
Bre aker
Bat tery
5m
5m
Rai lLog
Chart 5. 7
Sen sor
Hybrid
Bre aker
10m
EPSGri d
a)b)
ATS-T
AC
Bre aker
Loa d
Hybrid
EPS
Loa d
c)
d)
Chart 5. 8
5.4 SPH System Connection Mode
5.4.1 Co nn ec tion of PV termin al
PV+
5.3.2 In st al lation of SPH
1.Firs t es ti mate the size of th e in ve rter on the wall;
2.Dete rm in e the location of t he d ri ll hole through the cardboard (instal la ti on guide), put
the cardboard on the wal l an d ma ke sure the top edge of the cardboard is hori zo nt al.
3.Mark f ou r po ints at the wall vi a th e ho le of the paper boa rd, then remov e th e
cardboard.
13
PV-
The In verte rSide
Chart 5. 9
14
Loading...
+ 22 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.