Installation Guide
Package Contents
Preparation: Identify and inspect all parts
before beginning the installation.
Missing or damaged parts? Contact your
original place of purchase.
PARTS BAG
LightSourceToolsRequired
BULB BASE TYPE
Medium (E26)
4BULBSREQUIRED
BULBSNOTINCLUDED
100W
MAX
BULB SHAPE
TYPE A
Small Loop
F
x2
12”L Rod with Nipple
H
x2
FixtureHeightAdjustable
17.25”to53.25”
Warnings and Cautions
Turn off the electricity at the circuit breaker
before installation. Consult a licensed
electrician if in doubt about installation.
Turn off power to the fixture and allow the
bulbs to cool before replacing.
6”L Rod
G
x4
12”L Rod
I
x2
J
Shade
x4
Crossbar Assembly
A
x1
Quick Link
B
x2
Ceiling Canopy
C
x1
Outlet Box Screw
D
x2
Wire Connector
E
x3
K
Table of
Contents
Crossbar
Rods&Small Loop
STEP 1 STEP 2 STEP 3 STEP 6
Assembly
Quick Link
Lanyard
STEP 4
Wiring
STEP 5
Fixture Body
x1
Ceiling Canopy
Bulb&Shade
STEP 7
1of4

STEP 1
Optional Rods
8’ ceiling:
(2) 6”L + (2) 12”L rods
9’ ceiling:
(2) 6”L + (4) 12”L rods
10’ ceiling:
(4) 6”L + (4) 12”L rods
STEP 2
1 2
Step 1
Install crossbar assembly
1 2
L
N
Test fitting ceiling canopy to nipple
Step2-3
3
STEP 3
2of4

STEP 4
1
Feed the fixture wires
Step 1
through the ceiling canopy
2
Step 2
Install Lanyard
STEP 5
White wire (neutral)
from outlet box
Black or Red wire (hot)
from outlet box
Bare or Green ground wire
from outlet box
*Green Ground Screw
on crossbar optional
Supply wire from fixture
Ribbed side or identified
with the Label “N”
supply wire from fixture
Smooth side or identified
with the label “L”
Ground wire
from Fixture
3of4