A PowerNode that has been previously used with a different Z-Wave network must have its association (homeID)
with the other network removed before you can connect it to your GreenWave Reality energy management
system. This process is called “exclusion” and requires two steps: one that must be performed with the Gateway
and then one that is performed with the PowerNode.
You can start the exclusion process through your Gateway user interface or by pressing and holding the
Gateway network button for five seconds until the “exclusion mode” pattern appears on the Gateway activity
indicator. When this is completed, the Gateway is ready to perform the exclusion of the PowerNode.
To complete the process you must perform the following steps:
1. Plug the PowerNode into an electrical outlet.
2. Locate the network button on the PowerNode. It is a small round button on the side of the device,
marked with the sync symbol.
3. Press and hold the network button for one second until the PowerNode activity indicator begins to
display a clockwise-rotating pattern, which shows that the PowerNode is attempting exclusion.
4. After a few seconds, the rotating pattern should stop and all bars turn green for five seconds to indicate
successful exclusion. Your PowerNode is now free of its former association, and you can perform an
inclusion process to include it in your GreenWave Reality energy management system (refer to the
“Network Inclusion Process” section above).
If the rotating pattern has stopped but the bars rapidly flash green for five seconds, then the PowerNode
exclusion process has failed, and you must start over.