Greenheck Jumpover Jackshaft Coupler User Manual

Document number 465053
2 15/16 in.
(75mm)
1/2 in. (13mm) SPLIT COLLAR
1 in.
(25mm)
1/2 in. (13mm) ID diameter
two piece coupler
2 3/8 in. (60mm)
3 15/16 in.
(100mm)
C/L
COUPLER ASSEMBLY
JACKSHAFT BRACKETS
CRANKARM LINKAGE
®
INSTALLATION INSTRUCTION SUPPLEMENT
Jump-over Jackshaft Coupler
Refer to: ‘Installation Instructions for FSD-XXX, DFD­XXX, CFSD-XXX, SSFSD-XXX Series Fire and Combination Fire Smoke Dampers (Part #461336)
Application
The jump-over jackshaft coupler is designed to couple together two independent jackshafts.
Notes
1. Remove the set-screws and seperate the two halves of both two piece couplers.
2. Position the jump-over bracket such that it straddles the two center jackshaft brackets and the crankarm nearest the center jackshaft brackets.
3. Replace the bottom half of both two piece couplers and the four set-screws using 80 in. lb. of torque.
FSD series
Combination Fire Smoke Dampers
FSD-XXX series dampers are “UL CLASSIFIED (see complete marking on product)” “UL CLASSIFIED to Canadian safety standards (see complete marking on product)” Standard 555 (Lisiting # R13317)
Standard 555S (Listing # R13447)
Copyright © 2013 Greenheck Fan Corporation
465053 Jumpover Jackshaft Coupler Supplement
Rev. 2 January 2013
Loading...