Greenfire Scan-Line Green 100 Operating Manual

Operating Guide
Gr
ee
nfir
e
Danish Design • Danish Quality • Danish Production
www.heta.d k
dk
UK
2
Dear customer,
Congratulations on the purchase of your new pellet stove. We are confident that your investment will provide you with excellent value and plenty of enjoyment, particularly if you follow the advice and guidelines laid out in these instructions.
The Greenfire pellet stove is approved under EN 14785; NS 3058/3059; Austria’s 15a; DIN plus
These approvals are your guarantee as a consumer that the pellet stove meets a number of specifications and requirements which confirm that the stove is made of high-quality materials, that it is economical to use, and it is not harmful to the environment.
Please read these instructions for use carefully prior to installation and operation to avoid personal injury or damage to building parts or the product itself.
HETA A/S Copyright © 2014. HETA Jupitervej 22, 7620 Lemvig, Denmark
Tel. +45 96 63 06 00
E-mail: heta@heta.dk
We accept no liability for printing errors and reserve the right to change the contents without notice.
Heta and Greenfire are registered trademarks belonging to Heta A/S.
Printed in Denmark. First edition, 2014.
Revision 1.01 UK
CONTENTS: Page:
1. Introduction 4
2. Safety information 4
3. General information 5
3.1. Liability 5
3.2. Spare parts 5
4. Installation and ignition 6
4.1. Dimensions 6
4.2. Installing the control panel 7
4.3. Placement 8
4.4. Minimum distance from combustible materials 8
4.5. Proximity to combustible materials 9
4.6. Flue gas system 9
4.7. Chimney draught 9
4.8. External air supply 9
4.9. Failure to ignite 9
4.10. Before the first ignition 10
5. Safety systems
10
5.1. Temporary power failure 11
6.
Filling wood pellets
12
7. Cleaning, Maintenance and Service Interval 12
8. Operation and Timer, etc. 13
8.1. Control panel 13
8.1.1. Remote control 13
8.1.2. Menu structure 14
8.2. Menu navigation 15
8.2.1. Active touch buttons 15
8.2.2. Set the clock 15
8.2.3. Manual pellet advancement 15
8.2.4. Set the room temperature 16
8.2.5. Select the heat level 16
8.2.6. Select the convection level 16
8.2.7. Select the pellet quality 16
8.3. Sub-menus 17
8.3.1. Set-up menu 17
8.3.2. Menu item: Time 17
8.4. Timer 18
8.4.1. Setting programmes 18
8.4.2. Setting days 19
8.5. Explanation overview 20
8.5.1. Start-up Sequence 20
8.5.2. Room Temperature Control 20
8.6. Troubleshooting and error reports for the Greenfire pellet stove 21
8.6.1. Troubleshooting 21
8.6.2. Test run of stove 22
8.6.3. Is the stove not burning cleanly? 22
8.6.4. Service technician / Description of problem 23
8.6.5. Overview of errors and alarms 24
9.
Warranty
25
10. EU declaration of conformity 26
11. Nameplate 27
4
Accompanying your pellet stove you will find:
A. Operating guide / Cleaning manual
B. Cleaning brush
C. Heta glove D. Power cable E. Remote control
F. Nameplate
1. Introduction
NB !!!
We advise you to read these instructions carefully, as they describe what you need to do to ensure your Greenfire pellet stove functions to its full potential.
Warning
The regulations relating to installation and function described in these instructions may differ from the applicable regulations in the destination country. If this is the case, the regulations applicable in the destination must be observed. Drawings in these instructions are approximate and not to scale.
Information
The packaging used provides good protection against damage that might arise during transportation of the stove. Please check the stove immediately upon delivery. If you notice any visible signs of damage, contact your dealer without delay.
Description of the stove
The aim of these instructions for use and servicing from Heta is to give the user all the necessary safety information, in order to prevent any personal injury or damage to stove components or other items. Please read these instructions carefully before using or performing maintenance on the appliance.
2. Safety information
Your Greenfire pellet stove must be installed by a technician who has been trained by HETA A/S. Please read these instructions regarding use and maintenance carefully before installing and lighting the stove! If you need further information, please contact the dealer from whom you purchased the stove.
NOTE The stove has extra protection in line with power regulations, and must have an earthed electrical connection.
Only quality pellets with a diameter of 6-8 mm should be used as fuel. Before connecting power to the stove, make sure that the connection between the stove pipe and chimney is in place. Never remove the protective grate above the pellet tank. The stove must be installed in a room with adequate air replacement. Never open the stove door while the stove is operating. When the stove is lit, the surfaces, glass, handle and stove pipe will be very hot. While the stove is operating, these components may only be touched if wearing appropriate protection.
3. General information
The Greenfire pellet stove must only be installed in residential environments. The stove has fully automatic control, ensuring controlled combustion. The control system manages the ignition process, five heat levels and shutdown, ensuring that the stove functions correctly.
The design of the bowl used for combustion ensures that most of the ash from the pellets falls into an ash drawer. However, you should check the burn pot each day, as not all pellets are of equal quality.
Air flow is used to help keep the glass clean, however it is impossible to avoid the glass becoming sullied after some usage (see the cleaning manual for cleaning instructions).
Only pellets 6-8 mm in diameter should be used as fuel in the Greenfire pellet stove.
3.1 Liability
By providing these instructions, Heta A/S disclaims all liability, both personal and statutory, for any accidents that may arise due to failure – either fully or in part – to observe the instructions enclosed herein.
Heta A/S disclaims all liability in relation to incorrect use of the stove, abnormal usage by the customer, unauthorised replacement and/or repair, or the use of non-original spare parts for this model
The manufacturer disclaims all liability, both personal and statutory, direct and indirect, attributable to:
Inadequate maintenance
Failure to observe the instructions in this manual
Failure to observe safety directions
Irregular installation with failure to observe applicable standards in the destination country
Installation carried out by unqualified or untrained personnel
Replacement or repair not authorised by the manufacturer
Use of non-original spare parts
Extraordinary events
3.2 Spare parts
Use only original spare parts
If you have any questions concerning your pellet stove, Heta strongly recommends that you contact your dealer immediately.
6
4. Installation and ignition
4.1 Dimensions
531
914 Air Intake Flue Outlet
Reset button 307
179
479 125 113
4.2. Installing the control panel.
a) Remove the four screws labelled A.
b) Install the control panel labelled # on the backplate using the four screws labelled A.
c)
d) Install the communication cable labelled 1 in the communication port labelled 2
8
7,5
cm 5
cm 5
cm
4.3. Placement.
The position of the stove within the home will have a major impact on heat distribution. Before deciding where to place the stove, it is important to consider the following:
a) The air supply for combustion must come from a ventilated room or an open
outdoor area.
b) Installation in a bedroom is not advised. c) The stove must be installed in a spacious and central location in the house to ensure the
best heat distribution.
The electrical connection must be with Protective Earth (if the cable included is not long enough to connect to the closest power outlet, use an extension cord with a Protective Earth connection)
4.4. Minimum distance between the stove and combustible materials.
If positioned as shown, a minimum distance of 7.5 cm must be maintained from the wall, with a gap of 4 cm behind the stove.
4
cm
If positioned as shown, a minimum distance of 5 cm must be maintained from the walls.
4.5. Proximity to combustible materials.
Stove sides 7.5 cm
Stove rear 4 cm
Furniture in front of the stove 60 cm
Above the top plate 20 cm
Vertical flue pipe 22.5 cm
Horizontal flue pipe 15 cm
The following directions may vary, depending on regional or national directives. Applicable legislation in the country in which the stove is being installed must always be respected. If in doubt, contact your authorised Heta dealer.
4.6. The stove’s flue gas system
The flue gas system is dependent on a slight underpressure in th e combustion chamber, and it is very important that the chimney exhausts to outside air and not to an enclosed or semi-enclosed room such as a garage, corridor, attic or anywhere else where the flue gases could become concentrated.
The chimney must always be installed in accordance with national and regional regulations
4.7. Chimney draught.
Operation of the Greenfire pellet stove is partly independent of the chimney draught, as the flue gas vacuum pump assists in removing smoke from the combustion chamber. However, if there is a strong chimney draught, we recommend a draught stabiliser be installed. Otherwise the chimney will overrun the flue vacuum pump, resulting in too much combustion. The stove operates best with a chimney draught of 11 pascals (used for testing/approval) in a chimney with a diameter of 80 mm
4.8. External air supply.
In hermetically closed environments with little air replacement it can be difficult to supply enough air for the combustion and it may be necessary to supply extra air to the room.
4.9. No ignition in the burn pot.
During the ignition phase, it may be the case that the stove fails to develop a flame. If the stove fails to ignite, the control system will shut down the stove and report an error (no pellets)
(See section 8.6.5.)
Loading...
+ 18 hidden pages