Great Plains 40P User Manual

Great Plains Mfg., Inc.
Installation Instructions
No-Till Precision Seeding System
Baffle Package Option
Used with:
• 15P
• 20P
• 30P
• 40P
When you see this symbol, the subsequent instructions and warnings areserious- follow without exception. Your life and
!
!
the lives of others depend on it!
These instructions explain how to install the Baffle Pack­age Option. The baffle package stops the flow of grain to a set number of seed tubes by covering those tubes.
These instructions apply to:
118-825A 15P TwinRow 118-826A 20P TwinRow 118-827A 30P TwinRow 118-855A 40P TwinRow
Manual Update
Refer to the 3-Point Precision Seeding System opera­tor’smanual fordetailed information on safely operating, adjusting, troubleshooting and maintaining the Baffle Options Package. Refer to the parts manual for part identification.
118-732M Operator’sManual 118-732P Parts Manual 118-740M Operator’sManual
118 740P Parts Manual 196-248M Operator’sManual 196-248P Parts Manual 196-286M Operator’sManual 196-286P Parts Manual
Before You Start
Pages 8 and 9 are a detailed listing of parts included in the Baffle Package Option. Use this list to inventory parts received.
Tools Required
• Basic hand tools
Definitions
Right hand and left hand as used in this manual are de­termined by facing the direction the drill will travelwhile in use.
Assembly Instructions for 118-825A Baffle Package
Refer to Figure 1
1. Loosen fasteners on left inside of left box (1) as shown in figure 1. Place outer end box clip (2) over bolts and retighten fasteners. Loosen fasteners on right inside of left box and place inner box end clip over bolts and retighten. Be sure clips are pushed down on bolts. Assemble the clips in the same man­ner for all boxes.
End Box Clip (2)
Fasteners (1)
© Copyright 2002 Printed
1/9/2003
Figure 1
Box Ends
19249
118-811M
Baffle Package Option
2
Assembly Instructions for 118-825A Baffle Package
Refer to Figure 2
2. Line meter covers with foam seal all the way around the edges.
3. Place meter coverovertube outletsnot being used. Place Seedtube corksin tubes at each end of the box. See page 6 for placement. Make sure there is a good seal to rear box panel.
Great Plains Mfg., Inc.
Refer to Figure 3
4. Use tarp strap to hold meter covers in place by fastening one end to the box end clip pull­ing it over the meter cover and hooking it to the center divider.
19253
Figure 2
Foam Seal
Figure 3
Box Divider
19246
118-811M 1/9/03
Great Plains Mfg., Inc.
Assembly Instructions for 118-826A Baffle Package
Refer to Figure 7
1. Using predrilled holes, remove bolt (1) from feedercuptrayand replace with eye hook (2), flat washers (3), lock washer (4) and hex nut (5) supplied in kit. Assemble the eyebolts in the same manner for all boxes.There are two eyebolts per feedercup tray, one at each end of tray. Note: If there are no holes, drill 1/4” hole (6) on edge of outlets.
Feedercup Tray
Installation Instructions
Figure 7
3
19251
Refer to Figure 8
2. Line meter covers with foam seal all the way aroundtheedges.Thetwooutside meter cov­ers require an additional 4" strip to be added to both ends of the cover.
3. Place meter covers over tube outlets not be­ing used. Place Seedtube corks in tubes at each end of the box. See page 6 for place­ment. Make sure there is a good seal to rear box panel.
Refer to Figure 9
4. Use tarp strap to hold meter covers in place byfasteningone end to the eyehook pulling it overthe meter coverand hooking it tothebox divider
19253
19254
Figure 8
Foam Seal
1/9/03
Figure 9
Eye Hook to Box Divider
19252
118-811M
Loading...
+ 6 hidden pages