Great Plains 3S-4000 User Manual

Great Plains Mfg., Inc.
Installation Instructions
3S-4000 Folding Min-Till Drill
Acre Counter Update
Used with:
• 3S-4000
When you see this symbol, the subsequent instructions and warnings areserious- follow without exception. Your life and
!
!
the lives of others depend on it!
These instructions explain how to install the bat­tery operated Acre Counter. The Acre Counter is used to calculate and display the field acres and total acres accumulated on the implement it is mounted on and calibrated for.
These instructions apply to:
194-210A Electronic Acre Meter Kit
Manual Update
Refer to the 3S-4000 operator’smanual for de­tailed information on safely operating, adjusting, troubleshooting and maintaining the Acre Counter. Refer to the parts manual for part identification.
195-242M-A Operator’sManual 195-242P Parts Manual
Before You Start
Page 6 has a detailed listing of parts included in the Acre Counter package. Use this list to inven­tory parts received.
Tools Required
• Electric drill
• Basic hand tools
Definitions
Right hand and left hand as used in this manual are determined by facing the direction thedrillwill travelwhile in use.
© Copyright 2003 Printed
10/27/2003
194-209M
Acre Counter Update
2
Assembly Instructions
Refer to Figure 1
1. Select a ground drivenshaft with easy ac­cess. Install the two halves of the magnet ac­tuator around the shaftand slide theactuator together.Positionthe magnet actuator next to the bearing mount.
Note: Take care when sliding the actuator togeth­er so not to break one of the tabs.
2. Remove the two nuts and lock washersfrom the carriage bolts which hold the bearing to the mount.
3. Place the bracketwhich holds the pickup sen­sor over the bolts and replace the nuts and lock washers. Tighten nuts.
4. Attach the pickupsensor to the sensor brack­et. Secure the ground wire to one of the mounting screws. Slide the sensor so it is no more than 1/8" from the magnet actuator. Do not allow the sensor to touch the magnet ac­tuator. Tighten screwsto hold in place.
Great Plains Mfg., Inc.
21821
Figure 1
Magnet Actuator
Refer to Figure 2
5. Mount the acre counter console to the drill frame. Select a location close to the pickup sensor which allows easy access for reading or adjustments. Pick a location which allows the console to be mounted in a vertical posi­tion.
6. Hold the console in place and mark where to drill the holes forthe mounting screws.
7. Drill 11/64" holes where marked and secure the acre counter console in place with two 3/4" x 10-16 self taping screws.
8. Connect the cable from sensor pickupto the acre counter console. Windup and tie out of the way any extra cable.
21822
Figure 2
Acre Counter Console
194-209M 8/22/2006
Loading...
+ 4 hidden pages