Grant Combi 26e, Combi 21e, Combi 36e Installation And Servicing Instructions

UK | DOC 0089 | Rev 1.0 | November 2016
Grant UK Pro External Combi
Combi 21e, Combi 26e and Combi 36e Condensing Oil Boiler Range
Installation and Servicing Instr
uctions
2
For use with Kerosene* only.
After installing the boiler leave these instructions with the User.
This appliance is deemed a controlled service and specific regional statutory requirements may be applicable.
*Operation on Bio-fuel
All Grant Vortex Pro condensing boilers, manufactured since May 2011, are suitable for operation on both standard kerosene (Class C2 to BS2869) and also bio-kerosene – up to a 30% blend (B30K).
All burner settings and nozzle sizes (as detailed in Section 2.3 of this manual) are correct for both standard kerosene and bio-kerosene (B30K).
In order to operate this boiler on bio-kerosene it will be necessary to take the following actions:
a) Use a bio-kerosene (B30K) compatible flexible oil line in place of the oil line supplied with this boiler.
b) Have your oil storage tank and oil supply line (including all pipework, sight gauges, filters, isolating valves, fire valves, de-aeration devices, etc.) checked for their compatibility with bio-kerosene (B30K).
Where necessary some, or all, of these items may have to be replaced with a bio-kerosene compatible alternative.
c) Check the suitability of the flue system with Grant UK.
d) Use only bio-kerosene (B30K) that conforms to OPS24.
IMPORTANT
Under no circumstances should the boiler be used with bio-kerosene without the above actions being taken first.
Date:
Commissioning engineer:
Tel. No:
Boiler model: Boiler output: kW
Fuel type: Kerosene
Nozzle size: Pump pressure:
Air setting: Flue gas % CO
2
:
Net ue gas temp: Smoke No:
System ushed: Yes / No
Corrosion inhibitor added: Yes / No
Antifreeze added: Yes / No
(where there is a Yes / No - please circle appropriate answer)
GRANT ENGINEERING (UK) LIMITED
Hopton House, Hopton Industrial Estate, Devizes, Wiltshire SN10 2EU Tel: 01380 736920 Fax: 01380 736991 Email: sales@grantuk.com www.grantuk.com
This manual is accurate at the date of printing but will be superseded and should be disregarded if specications and/or appearances are changed in the interests of continued product improvement. All good sold are subject to our ofcial Conditions of Sale, a copy of which may be obtained on application. © Grant Engineering (UK) Limited 2016. No part of this manual may be reproduced by any means without prior written consent.
For sealed systems only:
Expansion vessel size : litres
Expansion vessel change pressure : bar
Sealed system ll pressure (cold) : bar
Service Log
It is recommended that the boiler should be regularly serviced, at least once a year, and the details entered in the Boiler Handbook by the service engineer.
Contents
3
1 Introduction 4
1.1 How a Condensing Boiler Works 4
1.2 Boiler Description 4
2 Technical Data 6
2.1 Boiler Technical Data 6
2.2 Approximate Air Damper Setting 7
2.3 Vortex Pro Combi e Oil Boilers using Class C2 Kerosene 7
2.4 Flue Gas Analysis 7
2.5 Boiler Dimensions 7
3 Oil Storage & Supply System 8
3.1 Fuel Supply 8
3.2 Burner Oil Connection 11
4 Boiler Installation Information 12
4.1 Introduction 12
4.2 Boiler Location 12
4.3 Preparation for Installation 12
4.4 Installing the Boiler 12
4.5 Expansion Vessel 13
4.6 Filling and Venting the System 13
4.7 Regulations Compliance Requirements 13
4.8 Completion 14
4.9 Before you Commission 14
4.10 Underfloor Heating Systems 14
4.11 Pipework Materials 14
4.12 Sealed Systems 14
4.13 Underfloor Pipework 14
5 Pipe Connections 15
5.1 Water Connections 15
5.2 Making the Water Connections 15
5.3 Domestic Hot Water System 16
5.4 To use the Water Hardness Kit 16
6 Condensate Disposal 17
6.1 General Requirements 17
6.2 Connections 17
6.3 Pipework 17
6.4 External Pipework 17
6.5 Condensate Soakaway 17
6.6 Condensate Trap 18
6.7 Condensate Disposal Pipework 18
6.8 Inspection and Cleaning of Trap 18
7 Sealed Systems 19
7.1 System Models 19
8 Electrical 20
8.1 Connecting the Power Supply 20
8.2 Connecting the Controls - Heating Only 22
8.3 Connecting the Controls - Heating and Hot Water 23
8.4 Connecting a Remote Frost Thermostat 25
9 Flue System & Air Supply 26
9.1 Low Level Discharge Flue 26
9.2 Grant Green System 27
9.3 Grant Hybrid System 27
9.4 Grant Horizontal System 28
9.5 General Guidance 28
9.6 Air Supply 28
10 Commissioning 30
10.1 Before Switching On 30
10.2 Switching On 30
10.3 Running the Boiler 31
10.4 Balancing the System 31
10.5 Completion 31
10.6 Air Adjuster Disc - Combi 21 only 32
10.7 Information for the User 32
11 Boiler Servicing 33
11.1 Checking before Servicing 33
11.2 Dismantling Prior to Servicing 33
11.3 Cleaning the Boiler 33
11.4 Cleaning the Burner 35
12 Fault Finding 36
12.1 Initial Checklist - for Installer or Service Engineers 36
12.2 Main Fault Finding Procedure 37
12.3 Poor Hot Water Checklist 40
12.4 Riello RDB Burner Fault Finding 41
13 Spare Parts 42
14 Health & Safety Information 44
14.1 Insulation Materials 44
14.2 Insulation Materials 44
14.3 Kerosene and Gas Oil Fuels (mineral oils) 44
15 EC Declaration of Conformity 45
16 Guarantee 46
16.1 The Vortex Oil Boiler Gurantee 46
Appendixes 48
A High Efficiency Circulating Pump 48 B Product Fiche 50
1 Introduction
4
Warning of possible human injury as a consequence of not following the instructions in the warning.
The Grant VORTEX Pro Combi e condensing boilers contain an extra heat exchanger which is designed to recover the latent heat normally lost by a conventional boiler. It does this by cooling the flue gases to below 90° C, thus extracting more sensible heat and some of the latent heat. This is achieved by cooling the flue gases to their dew point (approximately 55° C).
To ensure maximum efficiency, the boiler return temperature should be 55° C or less, this will enable the latent heat to be condensed out of the flue gases.
The boiler will achieve net thermal efficiencies of 100%.
To achieve maximum performance from the Grant VORTEX Pro Combi e boilers, it is recommended that the heating system is designed so that a temperature differential of 20°C between the flow and return is maintained.
The Grant Vortex Pro Combi e boilers will however still operate at extremely high efficiencies even when it is not in condensing mode and therefore is suitable for fitting to an existing heating system without alteration to the radiator sizes. The boiler is capable of a maximum flow temperature of 78° C.
1.2 Boiler Description
The Vortex Pro Combi e boilers are automatic pressure jet oil boilers designed for use with a sealed central heating system and will provide domestic hot water at mains pressure.
All boilers are supplied with the control panel and the burner factory fitted, and a factory fitted low level discharge fuel system.
Caution concerning likely damage to equipment or tools as a consequence of not following the instructions in the caution.
Note text. Used for emphasis or information not directly concerned with the surrounding text but of importance to the reader.
1.1 How a Condensing Boiler Works
During the combustion process, hydrogen and oxygen combine to produce heat and water vapour. The water vapour produced is in the form of superheated steam in the heat exchanger. This superheated steam contains sensible heat (available heat) and latent heat (heat locked up in the flue gas). A conventional boiler cannot recover any of the latent heat and this energy is lost to the atmosphere through the flue.
!
WARNING
!
CAUTION
!
NOTE
For conventional flue applications, where required, Grant recommends the use of the Grant ‘Green’ flue system, to provide an insulated twin
- wall flue system. Refer to Section 9 for further details.
Only Kerosene must be used with a low level discharge flue appliance. The Vortex Pro Combi e boilers are only suitable for use with Kerosene.
All burners are ready to connect to a single pipe system with a loose flexible fuel line (900mm) and
3
/8” to 1/4” BSP male adaptor supplied with the boiler. If required, an additional flexible fuel line (900mm) and
3
/8” to 1/4” BSP male adaptor are available to purchase from Grant Engineering (UK) Limited, for two-pipe oil supply system, Part No. RBS36.
The temperature of the water leaving the boiler to heat the radiators is User adjustable.
The setting of the boiler thermostat on the Vortex Pro Combi e boilers has no effect on the hot water performance.
Figure 1-1 shows the components in the Vortex Pro Combi e boilers and the position of the control panel. Figure 1-2 shows the details of the control panel.
!
NOTE
This manual is intended to guide engineers in the installation and maintenance of Grant VORTEX Pro External Combi e boilers. A separate manual is available to guide users in the operation of these boilers, and is printed inverted at the end of this manual.
The following special text formats are used in this manual for the purposes listed below:
5
Figure 1-1: Vortex Pro Combi 21e boiler with front panel removed showing position of control panel
Figure 1-2: Vortex Pro Combi e boiler control panel
Electrical connection socket
Service switch
Boiler thermostat
Pressure gauge
Boiler On / Off switch
Burner lock-out
button
Indicator lights
Overheat reset button (under black cap)
Expansion
vessel
Heating (CH) pump
Hot water (DHW) pump
I
M
PO
RT
A
N
T
CAB
L
E
T
O
PLUG
M
UST
BE S
E
C
U
R
ED
I
N
C
A
BLE CLAMP BEL
OW
PA
N
EL
M
A
X
I
M
UM C
A
BLE
L
ENG
T
H
BET
W
E
EN P
LUG A
N
D
C
L
A
M
P
3
5
0
m
m
W
A
R
N
IN
G
230
V ISOLATE M
A
IN
S
P
O
W
E
R
SUP
P
L
Y
B
E
FOR
E
REM
O
V
IN
G
CO
V
ER
1
2
N
3
N
L
IMPORTANT CABLE TO PLUG MUST BE SECURED IN CABLE CLAMP BELOW PANEL MAXIMUM CABLE LENGTH BETWEEN PLUG AND CLAMP 350mm
WARNING 230V ISOLATE MAINS POWER SUPPLY BEFORE REMOVING COVER
1
2
N3N
L
2 Technical Data
6
2.1 Boiler Technical Data
Table 2-1: Technical Data
Combi 21e Combi 26e Combi 36e
Boiler water content (including 32 litre primary store)
litres 48.0 48.5 53.5
gall 10.6 10.7 11.8
Weight (dry)*
kg 147 188 218
lbs 325 415 481
Maximum heat output (Kerosene)
kW 21.0 26.0 36.0
Btu/h 71,650 88,700 123,000
Flow connection mm 22 22 28
Return connection mm 22 22 28
Cold water mains inlet mm 15 15 22
Domestic hot water outlet mm 15 15 22
Pressure relief valve discharge mm 15
Maximum heating system pressure (cold) bar 1.0
Minimum heating system pressure (cold) bar 0.5
Expansion vessel (pre-charged at 1 bar) litres 24
Maximum heating system volume** litres 255
Minimum domestic hot water flow rate 3.0 litres/min (0.66 gal/min)
Maximum domestic hot water temperature °C 65 (factory set)
Maximum mains water inlet pressure bar 8.0
Minimum recommended mains water inlet pressure bar 2.5
Condensate connection mm 22mm plastic pipe
Flue diameter (conventional)*** 100mm (4in) diameter
Waterside resistance (T=10°C) mbar 28.5 26.0
Waterside resistance (T=20°C) mbar 10.0 9.5
Maximum static head m 28
Minimum circulating head m 1
Boiler thermostat range °C 65 to 78
Limit (safety) shut of f temperature °C 111±3
Maximum hearth temperature °C Less than 50
Electricity supply 230/240V 1ph 50Hz fused at 5A
Burner motor power W 212
Absorbed motor power W 0.15
Starting current A 4.2 2.60
Running current A 0.85
Oil connection ¼ BSP male (on end of flexible hose)
Conventional flue draught
N/m² Minimum: 8.7 - Ma ximum: 37
in wg Minimum: 0.035 - Ma ximum: 0.15
Maximum operating pressure - sealed/open system bar 2.0
Maximum operating pressure - pressure relief valve bar 2.5
* Weight includes burner (and expansion vessel) but excludes flue. ** Based on expansion vessel charge and initial cold system pressure of 0.5 bar. *** If used as alternative to low-level terminal supplied with boiler (refer to Section 9).
2.2 Approximate Air Damper Setting
Burners are supplied factory set at the outputs shown.
When commissioning, the air damper must be adjusted to obtain the correct CO
2
level and the Installer
must amend the data label.
2.3 Vortex Pro Combi Oil Boilers using Class C2 Kerosene
.
Vortex Combi e boilers are only for use with kerosene.
!
NOTE
!
NOTE
The data given above is approximate only and is based on the boiler being used with a low level discharge flue.
The above settings may have to be adjusted on site for the correct operation of the burner.
Gas Oil is not suitable for use with a Grant Vortex Pro Combi e boiler.
The net flue gas temperatures given above are ± 10%.
When commissioning the air damper must be adjusted to obtain the correct CO
2
level.
2.4 Flue Gas Analysis
To allow the boiler to be commissioned and serviced, the boiler is supplied with a combustion test point on the front cleaning door. When this test point is used please note the following:
• ThetestpointisforCO
2
and smoke
readings only.
• Theboilerefciencyand
temperature must be taken from the flue.
• Finalcombustionreadingsmustbe
taken from the flue terminal (or test point on flue elbow if Green system is used) with all panels fitted.
Figure 2-1: Vortex Pro External Combi e dimensions
All dimensions in the diagram above are in millimetres.
2.5 Boiler Dimensions
Heat
SEDBUK
Nozzle Oil Smoke Burner Fuel Flue gas CO2
output
SAP 2009
pressure
number head flow temp
Model Burner type kW Btu/h
%
bar kg/h °C %
21e Riello RDB 2.2 21.0 71,650 89.5 0.60/80ºEH 9.0 0-1 T1 1.83
80 (flue)
12
235 (door)
26e Riello RDB 1 26.0 88,700 90.2 0.75/80ºEH 8.0 0-1 T2 2.16 75 - 80 12
36e Riello RDB 2.2 36.0 123,000 91.6 1.00/80ºEH 9.1 0-1 T5 3.01 78 12
7
PLAN VIEW
LEFT SIDE VIEW
REAR VIEW
RIGHT SIDE VIEW
657
720
755
755
944
R
5
6
516
108
27
75
72
150
516
108
R
5
6
329
108
223
150
75
72
27
8
3 Oil Storage & Supply System
Single Pipe System
Where the storage tank outlet is above the burner the single pipe system should be used. The height of the tank above the burner limits the length of pipe run from the tank to the burner.
As supplied the burner is suitable for a single pipe system.
Head A Max Pipe Run (m)
(m) 10mm 12mm OD Pipe OD Pipe
0.5 10 20
1.0 20 40
1.5 40 80
2.0 60 100
Head A Max Pipe Run (m)
(m) 10mm 12mm OD Pipe OD Pipe
0 35 100
0.5 30 100
1.0 25 100
1.5 20 90
2.0 15 70
3.0 8 30
3.5 6 20
Two Pipe System
With the storage tank outlet below the burner, a two pipe system should be used. The pipe runs should be as shown in Figure 3-2. The return pipe should be at the same level in the tank as the supply pipe, both being 75 to 100mm above the base of the tank. The pipe ends should be a sufficient distance apart so as to prevent any sediment disturbed by the return entering the supply pipe.
Avoid the bottom of the tank being more than 3.5m below the burner.
A non-return valve should be fitted in the supply pipe together with the filter and fire valve. A non-return valve should be fitted in the return pipe if the top of the tank is above the burner.
The pump vacuum should not exceed
0.4 bar. Beyond this limit gas is released from the oil.
For guidance on installation of top outlet fuel tanks and suction oil supply sizing, see OFTEC technical book 3.
Available at www.oftec.org.uk
3.1 Fuel Supply
Fuel Storage
The tank should be positioned in accordance with the recommendations given in BS 5410:1:1997, which gives details of filling, maintenance and protection from fire.
A steel tank may be used and must be constructed to BS 799:5:1987 and OFS T200.
A galvanised tank must NOT be used.
A plastic tank may be used and must comply with OFS T100.
Plastic tanks should be adequately and uniformly supported on a smooth level surface, across their entire load bearing base area, that is, the area in contact with the ground.
Fuel Pipes
Fuel supply pipes should be of copper tubing with an external diameter of at least 10mm.
Galvanised pipe must not be used.
All pipe connections should preferably use flared fittings. Soldered connections
must not be used on oil pipes.
Flexible pipes must not be used outside the boiler case.
A remote sensing fire valve must be installed in the fuel supply line at least one metre before it enters the boiler casing, with the sensing head located above the burner.
Recommendations are given in BS 5410-1:2014.
It is recommended that a good quality metal bowl type fuel filter is fitted at the tank and a secondary filter in the fuel supply line closer to the boiler (15 µ for Kerosene) to protect the burner pump and nozzle from contamination. If the boiler operates on bio kerosene, a compatible filter should be used.
A shut-off valve should be fitted before the filter, to allow the filter to be serviced.
A flexible fuel line, adaptor and 1/4” BSP isolation valve are supplied loose with the boiler for the final connection to the burner. If a two pipe system or Tiger Loop system is used, an additional flexible fuel line (900mm) and
3
/8” to 1/4” BSP male adaptor are available from Grant Engineering (UK) Limited (Part No. RBS36).
Metal braided flexible pipes should be replaced annually when the boiler is serviced. Long life flexible pipes should be inspected annually and replaced at least every 60 months.
!
NOTE
!
CAUTION
!
CAUTION
Grant UK recommend that a fire valve with a temperature rating of 95°C be installed on any Grant Vortex Pro Combi.
!
NOTE
9
Figure 3-1: Single pipe system
Figure 3-2: Two pipe system
Fire valve
1m
1m
A
Fire valve sensor
Vent pipe
Fill pipe
Sludge valve
Shut-off valve
Shut-off valve
Level gauge
Filter
Fuel storage tank
Pump (see section 3.2)
Pump (see section 3.2)
Fire valve
Fire valve sensor
Vent pipe
Fill pipe
Sludge valve
Non return valve
Shut-off valve
Shut-off valve
Level gauge
Non return valve
Filter
Fuel storage tank
A
Supply
Return
10
3 Oil Storage & Supply System
Tiger Loop System
When The storage tank is below the burner, an alternative to a two pipe system can be achieved using a ‘Tiger Loop’ type oil de-aerator. This effectively removes the air from the oil supply on a single pipe lift.
The de-aerator is connected close to the boiler as a two pipe system (omitting the non-return valve) as shown in Fig. 3-3. Refer to the manufacturer’s instructions supplied with the de-aerator. The de-aerator must be mounted vertically, as shown in Figures 3-3 and 3-4.
To be used with a Tiger Loop system, the burner must be fitted with an additional flexible fuel line (a flexible fuel line (900mm) and
3
/8” to 1/4” BSP male adaptor are available to purchase from Grant Engineering (UK) Limited - Part No. RBS36).
To prevent any possibility of fuel fumes entering the boiler, the de-aerator must be fitted outside the casing.
!
WARNING
Figure 3-4: Tiger loop de-aeration device
To burner
From burner
From tank
Figure 3-3: De-aeration device system
Fire valve
Supply
Return
Fire valve sensor
Vent pipe
Fill pipe
Sludge valve
Tankmaster
Fuel storage tank
De-aeration device e.g Tiger Loop see Figure 3-4
Pump (see section 3.2)
Figure 3-5: Burner pump connections
Oil inlet
connection
Return connection
By-pass screw
Pressure gauge connection
Pressure adjuster
Vacuum gauge connection
Solenoid
Supply to nozzle
11
3.2 Burner Oil Connection
The fuel pump is supplied for use with a single pipe fuel supply system. For use on a two pipe system, it is necessary to fit the By-pass screw into the tapping in the return port. See Figure 3-5.
The By-pass screw is supplied in the boiler accessory pack.
The procedure is as follows:
1. Remove the plastic burner cover
(two screws).
2. Remove and discard the blanking
plug from the return connection of the pump and fit the By-pass screw using a hexagonal key.
3. Connect the return oil flexible fuel
line to the pump.
4. Connect the
3
/8” to 1/4” BSP
adaptor to the flexible fuel line.
Flexible fuel lines and adaptors are available to purchase from Grant Engineering (UK) Ltd.
The burner cover may be left off until the boiler is commissioned.
The blanking plug supplied in the inlet (suction) port may now be plastic and will not provide an oil tight seal when the pump is running.
Ensure the supply from the tank is connected to this port and the plastic plug is discarded.
!
WARNING
4 Boiler Installation Information
12
4.1 Introduction
The boiler is supplied already fully assembled with the flue terminal guard supplied loose inside the boiler.
4.2 Boiler Location
1. The External Combi boiler must
stand on a solid, level surface capable of supporting the weight of the boiler when full of water, e.g. a prepared concrete standing, paving slabs bedded down on sand / cement, or similar.
2. The Module can be installed either
against the building or ‘free standing’ some distance away from the building.
3. The Module must be positioned
such that the required clearances from the low level flue outlet, as shown in Figure 9-1, are achieved.
4. Adequate clearance must be left
around the boiler for servicing. In particular, a minimum clearance of 600mm above the boiler for removal of the top panel and 600mm at each end allow for access to the burner and condensate trap.
4.3 Preparation for Installation
1. Carefully remove the packaging
from the boiler and remove it from the transit pallet.
2. Remove the case top panel and
also the front and rear panels, as required.
3. The flue may exit the boiler from
the left, right or rear of the casing. Carefully press out the pre-cut section on the side or end casing panel to provide the opening in the required position for the flue to pass through the casing.
Fit the cover panel (with the round flue exit hole) over the square flue opening in the casing. Fit the circular rubber sealing grommet provided into the hole in the cover panel before fitting the flue terminal section.
4. Slacken the wing nuts holding the
flue elbow and rotate the elbow to the required direction for the flue to exit the casing.
5. Push the end of the flue terminal
section with the red seal through the seal in the casing. The terminal has been factory lubricated. Take care not to dislodge or damage the
red seals.
6. Carefully insert the terminal into the flue elbow until the bend of the terminal contacts the outer casing, then, pull the terminal forward approximately 25mm and rotate the bend so that the outlet is horizontal.
Rear Exit - The flue must discharge away from the building.
Side Exit - The flue should discharge towards the rear of the casing to prevent flue gases reentering the boiler casing through the air inlet vents on the casing front door.
The flue terminal must be fitted horizontally to prevent dripping from the end of the terminal.
7. Tighten the wing nuts holding the flue elbow and fit the stainless steel flue guard using the two screws provided.
8. The top panel of the casing has been designed so that it may be fitted to create a slight slope away from the side positioned against the wall. To tilt the top panel, loosen the four top panel casing screws, one at each corner and push down on the side furthest from the wall. Tighten the screws. See Figure 4-1.
4.4 Installing the Boiler
1. If the boiler is to be fitted against the wall, prepare the wall to accept the heating system pipework. To mark the wall for drilling, refer to Figure
2-1 for the positions of the pipework openings in the enclosure sides.
Pipework should be insulated where it passes through the wall into the boiler enclosure.
2. A painted steel wall flashing strip is supplied with the boiler to cover the gap between the wall and the boiler casing. It should be secured to the wall leaving a gap of 30mm between the bottom edge and the top of the casing top panel, to allow removal of the top panel for servicing.
3. If the boiler is to be installed ‘free standing’ (that is, away from a wall) and the pipework run underground, push out the ‘knock-outs’ to open the required pipe openings in the base of the boiler enclosure.
Using a sharp knife, cut through
the polystyrene in the base, around the edge of the holes, to allow the flow and return pipes to enter the enclosure.
A spare blanking plate with a 112mm diameter hole is supplied with the Outdoor Vortex Combi boilers. This is intended to provide an opening into the boiler if a 110mm soil pipe is used as a pipe duct through the wall.
!
NOTE
!
NOTE
Figure 4-1: Standard supplied flue
Top panel
fixing screw
Top panel
fixing screw
Top panel
fixing screw
Angle top panel to
slope away from wall
using slots provided
Terminal guard
fixing screw
(one each side)
End of terminal
with red seal
Flue elbow
Rear Exit Right ExitLeft Exit
13
The air charge pressure may be checked using a tyre pressure gauge on the expansion vessel Schraeder valve. The vessel may be re-pressurised using a suitable pump. When checking the air pressure the water in the heating system must be cold and the system pressure reduced to zero.
4.6 Filling and Venting the System
Automatic and manual air vents
The boiler is fitted with two Automatic air vents at the top of the boiler, located as follows:
• oneonthetopoftheprimarystore
• oneontheheatingowpipe
Refer to Figure 5-1.
Check that the small black plug on the side of each air vent is screwed in fully. Then unscrew it one complete turn - the cap remains in this position thereafter.
A single manual air vent is also fitted at the top of the boiler - on the return pipe. Unscrew the cap one turn vent air from the pipe during filling and then fully close the cap.
Filling loop
If the flexible filling loop is used to fill the system, ensure it is connected and that the valve connecting it to the boiler is open and the valve at the front is closed.
A valve is open when the operating lever is in line with the valve, and closed when it is at right angles to it.
Ensure that the mains cold water supply valve is open (operating lever in line with the valve), then turn on the mains cold water supply and gradually open the front valve on the filling loop until water is heard to flow.
Vent each radiator in turn, starting with the lowest one in the system, to remove air.
Check the operation of the safety valve by turning the head anticlockwise until it clicks. The click is the safety valve head lifting off its seat allowing water to escape from the system. Check that this is actually happening.
Continue to fill the system until the
pressure gauge indicates between
0.5 and 1.0 bar. Close the fill point valve and check the system for water soundness, rectifying where necessary. Water may be released from the system by manually operating the safety valve until the system design pressure is obtained.
The system design pressure (cold) should be between 0.5 bar and 1.0 bar. The pressure is equivalent to the maximum static head in bar + 0.3 (1 bar = 10.2 metres of water), where the static head is the vertical height from the centre of the expansion vessel to the highest point of the system.
Close the valves either side of the filling loop and disconnect the loop.
4.7 Regulatory Compliance Requirements
Installation of a Grant VORTEX Pro External Combi e must be in accordance with the following recommendations:-
• BuildingRegulationsforEngland
and Wales, and the Building Standards for Scotland issued by the Department of the Environment and any local Byelaws which you must check with the local authority for the area.
• ModelandlocalWaterUndertaking
Byelaws.
• ApplicableControlofPollution
Regulations.
• ThefollowingOFTECrequirements:
• OFST100Polytheneoilstorage
tanks for distillate fuels.
• OFST200Fueloilstoragetanks
and tank bunds for use with distillate fuels, lubrication oils and waste oils.
Further information may be obtained from the OFTEC Technical Book 3 (Installation requirements for oil storage tanks) and Technical Book 4 (Installation requirements for oil fired boilers).
The installation should also be in accordance with the latest edition of the following British Standard Codes of Practice:
4. The electrical supply to the boiler should be routed through the wall in a suitable conduit, such that it enters the boiler enclosure via one of the unused pipework openings. The cable can be routed to the front of the boiler, for connection to the boiler control panel, either over the top or beneath the boiler heat exchanger. Heat resistant PVC cable, of at least 1.0mm² cross section should be used within the boiler enclosure. See section 8.1 for details.
5. The oil supply line should be installed up to the position of the boiler. Refer to Section 3 for details. The final connection into the boiler enclosure can be made with 10mm soft copper, routed along the base of the enclosure (either between the enclosure and wall or in front of the enclosure) to enter through one of the holes located in the bottom edge side panel, at the front (burner) end. See Section 3 for details.
4.5 Expansion Vessel
The 21e, 26e and 36e models are supplied with a 24 litre expansion vessel located in the front of the boiler.
The expansion vessel fitted is supplied with a charge pressure of 1.0 bar (equivalent to a max. static head of
10.2 metres). The charge pressure
must not be less than the actual static head at the point of connection. Do not pressurise the vessel above 1.5 bar.
The air pressure in the vessel must be checked annually.
The central heating system volume, using the expansion vessel as supplied, must not exceed the recommended volumes. If the system volume is greater, an extra expansion vessel (complying with BS4841) must be fitted as close as possible to the central heating return connection on the boiler. The charge pressure of the extra vessel must be the same as the vessel fitted in the boiler. Refer to BS7074:1 for further guidance.
!
NOTE
14
• BS715Metaluepipes,ttings,
terminals and accessories.
• BS799:5Oilstoragetanks.
• BS1181Clayueliningsandue
terminals.
• BS4543:3Factorymadeinsulated
chimneys for oil fired appliances.
• BS4876Performancerequirements
for oil burning appliances.
• BS5410:1CodeofPracticeforoil
firing appliances.
• BS5449Forcedcirculationhot
water systems.
• BS7593CodeofPracticefor
treatment of water in heating systems.
• BS7671Requirementsforelectrical
installations, IEE Wiring Regulations.
Failure to install and commission appliances correctly may invalidate the boiler guarantee.
Before starting any work on the boiler, or fuel supply please read the health and safety information given in Section 14.
4.8 Completion
Please ensure that the OFTEC CD/10 installation completion report (provided with the boiler) is completed in full.
Leave the top copy with the User.
Retain the carbon copy.
Ensure that the User Information pack (supplied with the boiler) is handed over to the Householder.
4.9 Before you Commission
To avoid the danger of dirt and foreign matter entering the boiler the complete heating system should be thoroughly flushed out - before the boiler is connected and then again after the system has been heated and is still hot. This is especially important where the boiler is used on an old system.
For optimum performance after installation, this boiler and its associated central heating system must be flushed in accordance with the guidelines given in BS 7593:1992 ‘Treatment of water in domestic hot water central heating systems’.
This must involve the use of a proprietary cleaner, such as Betz Dearborn’s Sentinel X300 or X400, or Fernox Restorer. Full instructions are supplied with the products, but for more details of Betz Dearborn’s products, view the website www. sentinel-solutions.net and for more details of Fernox products view the website www.fernox.com.
For Long term protection against corrosion and scale, after flushing, it is recommended that an inhibitor such as Betz Dearborn’s Sentinel X100 or Fernox MB-1 is dosed in accordance with the guidelines given in BS 7593:1992.
Failure to implement the guidelines will invalidate the guarantee.
4.10 Underfloor Heating Systems
In underfloor systems it is essential that the return temperature must be maintained above 40°C to prevent internal corrosion of the boiler water jacket.
!
NOTE
!
WARNING
4 Boiler Installation Information
4.11 Pipework Materials
Grant boilers are compatible with both copper and plastic pipe. Where plastic pipe is used it must be of the oxygen barrier type and be of the correct class (to BS 7291:Part 1:2001) for the application concerned.
The first metre of pipework connected to both the heating flow and return connections of the boiler must be made in copper on all types of system - sealed or open-vented.
4.12 Sealed Systems
If plastic pipe is used, the installer must check with the plastic pipe manufacturer that the pipe to be used is suitable for the temperature and pressures concerned.
Plastic pipe must be Class S to BS 7291: Part 1:2001.
4.13 Underfloor Pipework
Plastic pipe may be used on Underfloor systems where the plastic pipe is fitted after the thermostatic mixing valve. Copper tube must be used for at least the first metre of flow and return primary pipework between the boiler and the underfloor mixing/blending valves.
!
NOTE
15
5 Pipe Connections
5.1 Water Connections
The pipework can exit the boiler enclosure through the pre-cut openings provided in either side panel to pass through the wall when installed against the building. The side flue exit openings may also be used to route the pipework and cables through the casing sides and into the building. See Section 2.5.
A spare blanking plate with a 112mm diameter hole is supplied with the Vortex Pro Combi e boilers.
This is intended to provide an opening into the boiler if a 110mm soil pipe is used as a pipe duct through the wall.
Alternatively for free standing installations, pipework can be routed down and through the pre-cut openings provided in the base of the enclosure, to be run underground to the building. See Section 2.5.
Flow and return connections -
All models are supplied with a push-fit elbow connection for the heating flow and return - 22mm (Vortex Pro Combi 21e and 26e) or 28mm (Vortex Pro Combi 36e).
Hot water connections - All models are supplied with push-fit elbow connections for the cold water mains inlet pipe and hot water outlet pipe. These are 15mm for the Vortex Pro Combi 21e and 26e, and 22mm for the Vortex Pro Combi 36e.
All pipes to be fitted into the push-fit connectors provided should be cut using a pipe slicer or pipe cutter - to leave the pipe ends with a slight radius and free from any burrs or sharp edges.
Pipes to be used with these fittings should not be cut square using a hacksaw.
!
CAUTION
A drain tap is provided at the bottom on the front of the boiler (and also on the hot water store on the Vortex Pro Combi).
5.2. Making the Water Connections
Flow and return pipework can be routed to either side of the boiler, whichever is adjacent to the building, from the push-fit elbows (supplied) on the flow and return connection. Refer to Figure 5-1.
Holes are provided at the base of the casing side panels to allow the condensate pipe to be run through at the rear of the boiler. It will be necessary to remove the back panel from the boiler casing to fit this pipework.
All Models
A 15mm discharge pipe must be connected to the safety valve outlet connection. The pipework between the safety valve and the boiler must be unrestricted, that is, no valves. The discharge pipe should be run to the outside of the boiler casing, through one of the openings provided at the base of each side panel, and terminate so that it cannot cause injury to persons or property.
Figure 5-1: Vortex Pro Combi e pipe positions
Heating flow connection
Heating circulating
pump
Heating
return
Flow switch
Cold water inlet isolating valve
Cold water inlet
Automatic air vent
Safety valve
Manual air vent
Primary return isolating valve
Non return
valve
Automatic
air vents
Boiler flow sensor and overheat thermostat bulb
Safety valve
outlet
5 Pipe Connections
16
5.3 Domestic Hot Water
System
To maintain a longer and more consistent hot water temperature, a flow restrictor is factory fitted to all models except the Vortex Pro Combi 36e, to limit the flow rate to approximately 15 litres / minute.
The flow restrictor is located in the outlet side of the cold water inlet isolating valve.
The incoming mains water pressure should be between 1 and 8 bar to ensure efficient operation.
If the pressure is above 8 bar a pressure reducing valve must be fitted.
The boiler may still operate down to a pressure of 1.0 bar but with a reduced flow rate. The minimum flow rate needed for the flow switch to operate is 3 litres / minute.
To ensure economic use, the pipe runs between the boiler and hot taps should be as short as possible and in 15mm copper pipe or 22mm for the Vortex Pro Combi 36e only. Where possible the pipework should be insulated to reduce heat loss.
All taps and mixing valves used in the domestic hot water system must be suitable for operating at a mains pressure of up to 8 bar.
If required, a shower may be fitted in the domestic hot water system. It is recommended that thermostatically controlled shower valves are used to protect against a flow of water at too high a temperature. If a fixed head type shower is used, no anti-syphonage devices are required. If a loose or flexible head type shower is used, it must be arranged so that the head cannot fall closer than 25mm above the top of the bath, thereby preventing immersion in the bath water. If this is not practicable, an anti-syphonage device must be fitted at the point of the flexible hose connection.
The supply of hot and cold mains water direct to a bidet is allowed (subject to local Water Undertaking requirements) provided that the bidet is of the over­rim flushing type. The outlets should be shrouded and unable to have a temporary hand held spray attached. Arrangements for antisyphonage are not necessary.
If the hardness reading is found to be in the medium to very hard range (the shaded area), it is essential that some form of water conditioner or softener is fitted to reduce scale formation within the combination boiler. Failure to do so may invalidate both the manufacturers guarantee and any extended guarantee covering the appliance.
The water conditioner or softener should be fitted to the cold water supply serving the appliance and in accordance with the manufacturers instructions. Grant Engineering (UK) Ltd. cannot be held responsible for any damage or misuse caused by the fitting of any water conditioning device.
Please protect the domestic hot water system from harmful effects of scale. Problems caused by the build-up of limescale are not covered under the terms of the guarantee.
Before the mains water supply pipe is connected to the boiler, it should be thoroughly flushed out to avoid the danger of dirt or foreign matter entering the boiler.
The mains water connection to the boiler must be the first connection from the mains supply.
A water hardness test kit is supplied with the boiler. Should the total hardness of the water supply exceed 125 ppm, an in-line scale inhibitor should be fitted in the cold water supply to the boiler. Consult the local Water Undertaking if in doubt.
Do not immerse the test strip in running water and avoid contact.
5.4 To use the Water Hardness Kit
Fill a clean container with a sample of water from the mains cold water supply to the boiler.
Immerse the test strip in the water for approximately one second, ensuring that all the test zones are fully wetted.
Shake off the surplus water and wait for one minute.
Assess the colouration of the test zones using the following chart.
!
CAUTION
!
NOTE
Green Areas Violet Areas Hardness Total Hardness mg/l (ppm)
4 0 Very Soft <50 mg/l calcium Carbonate 3 1 Soft <70 mg/l calcium Carbonate 2 2 Medium <125 mg/l calcium Carbonate 1 3 Hard <250 mg/l calcium Carbonate 0 4 Very Hard <370 mg/l calcium Carbonate
Note: (1 mg/l = 1 ppm (part per million)
17
6 Condensate Disposal
6.1 General Requirements
When in condensing mode the Grant Vortex PRO boilers produce condensate from the water vapour in the flue gases. This condensate is slightly acidic with a ph value of around 3 (similar to vinegar). Provision must be made for the safe and effective disposal of this condensate.
Condensate can be disposed of using one of the following methods of connection:
Internal Connection (preferred option):
• Intoaninternaldomesticwaste
system (from kitchen sink, washing machine, etc.).
• Directlyintothesoilstack.
External Connection:
• Intoanexternalsoilstack
• Intoanexternaldrainorgully
• intoarainwaterhopper(thatispart
of a combined system where sewer caries both rainwater and foul water)
• purposemadesoakaway.
All condensate disposal pipes must be fitted with a trap - whether they are connected internally or externally to a domestic waste system/soil stack or run externally to a gully, hopper or soakaway.
6.2 Connections
Connections into a rainwater hopper, external drain or gully should be terminated inside the hopper / drain / gully below the grid level but above the water level.
Condensate disposal pipes should not be connected directly into rainwater downpipes or to waste / soil systems connected to septic tanks.
Condensate should not be discharged into ’grey water’ systems that re-use water used in the home (not including water from toilets).
It should be noted that connection of a condensate pipe to the drain may be subject to local Building Control requirements.
6.3 Pipework
Condensate disposal pipework must be plastic (plastic waste or overflow pipe is suitable).
Copper or steel pipe is NOT suitable and MUST NOT be used.
Condensate disposal pipes should have a minimum ‘nominal’ diameter of 22mm (
3
/4”) - e.g. use 21.5mm OD
polypropylene overflow pipe.
Condensate disposal pipes must be fitted with a fall (away from the boiler) of at least 2.5° (~45mm fall per metre run).
Where it is not possible for the pipe to fall towards the point of discharge - either internally into a waste system or externally to a gully (e.g. for boilers installed in a basement), it will be necessary to use a condensate pump.
Condensate disposal pipes should be kept as short as possible and the number of bends kept to a minimum.
Pipes should be adequately fixed to prevent sagging, i.e. at no more than
0.5 metre intervals.
6.4 External Pipework
Ideally, external pipework, or pipework in unheated areas, should be avoided. If unavoidable, external pipework should be kept as short as possible (less than 3 metres) and 32mm waste pipe used to minimise the risk of ice blocking the pipe in freezing conditions.
The number of bends, fittings and joints on external pipes should be kept to a minimum to reduce the risk of trapping condensate.
For a boiler installed in an unheated area such as an outhouse or garage, all condensate pipework should be considered as an ‘external’.
6.5. Condensate Soakaway
To keep external pipework to a minimum, locate the soakaway as close as possible to the boiler but ensure it is at least 500mm from building foundations and away from other services, e.g. gas, electricity, etc.
The condensate pipe may be run above or below ground level and can enter either the top or side of the soakaway tube. Refer to Fig.6-1.
Ensure that the drainage holes in the soakaway tube face away from the building. Backfill both the soakaway tube, and the hole around it, with 10mm limestone chippings.
Only use a soakaway where the soil is porous and drains easily. Do not use in clay soils or where the soil is poorly drained.
Any damage due to condensate backing up into the boiler due to a high water table, in the case of a soakaway, or flooded drains when the condensate disposal is via a gully or soil stack, is not covered by the Grant product guarantee.
!
NOTE
!
NOTE
!
NOTE
!
CAUTION
Figure 6-1: Purpose made condensate soakaway
32mm waste pipe
external to the building
Two rows of 3 x 12mm holes at 25mm centres and 50mm from the bottom of the tube. Holes facing away from the property.
Backfill with 10mm limestone chippings
Sealed end
100mm plastic tube
Cement seal
Ground level
2.5° fall
25mm
300mm
400mm min.
18
6.6 Condensate Trap
Grant Vortex PRO boilers are supplied with a factory-fitted condensate trap to provide the required 75mm water seal in the condensate discharge pipe from the boiler.
This trap incorporates a float (which will create a seal when the trap is empty) and an overflow warning outlet (fitted with a plastic sealing cap), See Figure 6-2.
6.8 Inspection and Cleaning of Trap
The trap must be checked at regular intervals (e.g. on every annual service) and cleaned as necessary to ensure that it is clear and able to operate.
The bottom bowl is sealed to the trap body and cannot be removed.
To inspect and clean the trap, perform the following procedure:
1. Disconnect flexible condensate hose from inlet connector.
2. Unscrew the inlet connection nut.
3. Remove the ‘top hat’ inlet connector and nut from trap.
4. Remove trap from bracket.
5. Remove float from trap - clean if necessary.
6. Inspect inside of trap and clean as necessary.
7. Re-assemble trap, re-fit to boiler and re-connect flexible hose. Ensure that hose is fully pushed onto the ‘top hat’ inlet connector.
Failure to regularly check and clean the condensate trap may result in damage to the boiler and will not be covered by the Product Guarantee.
6.7 Condensate Disposal Pipework
The condense trap outlet is at an angle of 48° below the horizontal. This is to automatically gives a 3° fall on any ‘horizontal’ runs of condense disposal pipe. Refer to Fig.6-2 and see trap outlet/pipe.
The outlet of the trap will accept
21.5mm OD to 23mm OD Polypropylene overflow pipe for the condensate discharge pipe.
Possible routes for disposal pipework
The casing of the Vortex Pro External boiler has several openings in both the sides and base of the casing. These are designed to allow pipework to pass through the casing, as required, to suit the installation. These openings can be used to allow the condensate disposal pipe to exit the casing in one of the following ways:
Side outlet - The lower opening on either side of the boiler casing can allow the condensate disposal pipe to be installed as follows:
• Connectiontoaninternalstack-
passing back through the wall of the house.
• Connectiontoanexternalsoilstack
adjacent to the boiler.
• Dischargeintoanadjacent(external)
drain or gully.
• Dischargeintoasoakaway-with
pipe either above or below ground level.
Bottom outlet - There are three openings in the base of the boiler casing that can allow the condensate disposal pipe to be installed as follows:
• Dischargeintoadrainorgully
beneath the boiler (e.g. drain built in to the concrete base for the boiler).
• Dischargeintoasoakaway-with
pipe below ground level.
The trap is factory-fitted inside the boiler casing at the rear of the boiler ­mounted on the inside of the side panel
- in an accessible position to allow for routine maintenance.
A flexible hose connects the outlet of the condensing heat exchanger to the trap inlet. Ensure the straight connector on the hose is fully pushed onto the ‘top hat’ inlet connector of the trap.
With the trap fitted inside the boiler casing, the sealing cap must be fitted in the trap outlet.
Care should be taken when siting the trap such that the overflow outlet is readily visible and that any condensate overflowing from the outlet cannot cause either a hazard to persons or damage to surrounding property or equipment.
6 Condensate Disposal
Figure 6-2: Condensate trap
!
NOTE
!
NOTE
!
WARNING
Sealing cap must be fitted
Flexible hose from outlet of condensing heat exchanger
Condensate trap
Condensate outlet to drain