Grange Fencing DOMED Assembly Instructions Manual

Page 1
DOMED
PERGOLA
ASSEMBLY INSTRUCTIONS
TOP ELEVATION
SIDE ELEV
ATION
3.28m
2.89m
1.35m
STEP 9
F
it the 2nd Metal Plate onto
t
he opposite side of the
C
urved Beams at the centre.
S
TEP 10
T
hread one of the Ropes (
5)
through the Posts and Curved Beams. The two e
nds should be brought
t
ogether in one of the holes and retained by screws. Evenly space the Rope between the Posts.
STEP 11
Fit the 2nd Rope in the s
ame manner through the C
urved Beam holes.
STEP 12
Ensure the structure is vertical and the Posts are all at the same height. Fill the holes with the chosen method.
STEP 13
Lay the Fan Deck Tiles (3) and centre Round Tile (
4).
OPTION:
If your Pergola has a Golden Globe (
6) to fit on the top,
this may now be fitted.
1
1
x
2
4
5
5
2
y
y
3
SECURE THE ROPE E
NDS WITHIN THE HOLES OF ONE OF THE POSTS USING S
CREWS (Y) AS INDICATED
THE GLOBE IS FIXED I
NTO THE CENTRE OF THE METAL SUPPOR
T
PLATE
6
yy
PLAN
THE DOMED PERGOLA (JFDPG)
JULY 2011 - ISSUE 2
GRANGE FENCING LIMITED
Halesfield 21, Telford TF7 4PA
Tel: 01952 588088 Fax: 01952 581522
Email: [email protected] Web: www.grangefen.co.uk
OUT OF HOURS MESSAGE SERVICE: 01952 588088
ALL PRODUCTS ARE MEASURED TO THE HIGHEST AND WIDEST POINT AND ALL SIZES ARE APPROXIMATE
To ensure longevity of your structure it is recommended that it is treated with a wood preservative on a yearly basis.
AFTERCARE
Grange Code: JFDPG
Dome Pergola Inst 8/7/11 10:01 Page 1
Page 2
Thank you for choosing this garden structure from Grange Fencing Ltd. In order to gain the most b
enefit from it please read the following instructions carefully.
TOOLS REQUIRED (Not Supplied)
P
OWER DRILL (+ crosshead screwdriver bit)
S
PIRIT LEVEL
T
APE MEASURE
S
TEPLADDER
P
ARTS LIST
T
IMBER POSTS 6
C
URVED BEAMS 6
ELITE FAN DECKING TILE 4
ELITE ROUND DECK TILE 1
SISAL ROPES 2
GOLD GLOBE 1
HARDWARE PACK
METAL SUPPORT PLATES 2
SCREWS (No.8 x 50) 28
ASSEMBLY INSTRUCTIONS
STEP 1
Using the layout shown (above) mark out the area where the structure is to be sited. The ground should be flat and level for the Fan Tiles.
STEP 2
Prepare the holes for the Posts (1). Each hole should be 300mm deep. Make sure the depths are the same to ensure the pergola is level when all the posts are sited. Allow adequate room for the preferred method of fixing (ie. MetCrete).
We would recommend that you use
MetCrete,
fast set post fixing concrete to fix your posts. Easy to use, it sets in just 10 minutes.
STEP 3
Take one of the Metal Plates (x) for the centre of the roof. Fasten one of the Curved Beams (
2)
to it using screws (
y).
STEP 4
Fasten two of the other Curved Beams to the Metal Plate missing one spur out each time.
STEP 5
Place three Posts in the holes corresponding with the Curved Beam assembly.
STEP 6
Raise the Cur
ved Beam assembly and locate
into the top of the Posts.
STEP 7
Fix another Curved Beam to the Metal Centre Plate. Site another Post in the corresponding hole and locate the Cur
ved Beam in the slot.
STEP 8
Repeat step 7 for the r
emaining two Cur
ved
Beams and Posts.
(continued overleaf)
BEFORE YOU START
• Please ensure that you check all the component parts for quantity and quality before you
commence building the product. Report any missing parts immediately. The manufacturer will not accept any responsibility for damaged items once any part of the product has been fitted or altered in any way.
• Timber is a natural material and will react to varying levels of moisture content - ie. will swell or
shrink. All of the T
imber components ar
e pr
essur
e treated green. However, should extra protection be required, they should be treated using a wood preservative treatment, following the manufacturers instructions.
HEALTH AND SAFETY
Do not lean or stand on the r
oof assembly at any time - the str
uctur
e is not of a load bearing design.
Do not overstr
etch when working fr
om the step ladder
.
In order to reduce the risk of suffocation please keep all plastic bags and small parts away from children.
• When you ar
e r
eady to star
t, make sur
e you have the right tools to hand, plenty of space and a
clean, dry area for assembly. It is advisable for two people to carry out the work.
1
2
3
4
5
6
x
y
x
y
DOMED PERGOLA P
OST PLAN
Note: ensure correct orientation of posts a
round the ‘hexagon’.
AB
CD
1
6
2
yy
y
x
STEP 2
1
2
3
4
5
6
ESTABLISH THE STRUCTURE WITH THREE POSTS AND CUR
VED BEAMS LINKED WITH THE METAL CENTRE PLATE.
2x 5mm CLEARANCE HOLES WILL NEED TO BE DRILLED IN THE METAL PLATE TO ALLOW THE GLOBE BRACKET (6) TO BE FITTED.
2
x
Dome Pergola Inst 8/7/11 10:01 Page 2
Loading...