4
3.Pl ease me asure t he secu rity di stanc e betwe en hang ing bra ckets ( figur e 4), and f ix the ha nging b racke ts on the
cei ling us ing exp ansio n screw s (figu re 5).
4, Pl ease fo llow th e below s teps to i nstal l the pow er cord w hich re cessi ng in cas ing, an d plug in t he exte rnal in frare d recei ver
(be cause o f the rec essed m ount, t he exte rnal in frare d recei ver mus t be read y for con trol) .
1)Take o ut the po wer cor d (figu re 6).
2)Lo ose the s crews o f power b ox and ta ke out th e power b ox (not e: the po wer box m ust be bu ttone d on the ha nger of b racke t
acc ordin g to figu re 11, plea se put up a nd move b ack the p ower bo x to take o ut), be cause t he powe r cord ha s a limit , pleas e do
not d raw it st rongl y.
3)Lo ose and t ake out t wo rubb er scre ws, the n remov e the end c ap (fig ure 8-9 ).
4)Re move th e line co ver of en d cap, th en fill i n the pow er line . Aft erwar d, stuc k the lin e cover b ack to en d cap, th en inst all the
pow er line o utsid e the cas ing.
5)In stall t he end ca p again ( figur e 10)
6)In sert th e exter nal inf rared r eceiv er to EXT IR h ole (fi gure 10 ) (note : pleas e put the c omple ted ext ernal i nfrar ed rece iver in to
ins ide fra me of scr een to av oid the p ressi ng from s creen ). Then in stall t he powe r box bac k to brac ket (no te: ens ure the p ower
box i s butto ned on th e hange r of brac ket) (f igure 11) .
figur e 4
figur e 5
TRIG( )Trigger
EXT IR()External
Infrared Receiver
EXT CT RL(
)
Dry
Con tact/ RS232
Figur e 10
Sig nal Out put
Swi tch
M4 Sc rew
Not e: the po wer box m ust be
but toned o n the han ger of br acket .
Bra cket
Pow er Box
End C ap Boar d
Figur e 11
Four Hangi ng
Boar ds are i n middl e.
100
H
L 94minus
H 100minus
180
100
Figur e6
Pow er Line
Figur e7 Figur e8 Figur e9
11
Pro duct Inst ruction
11. Ins talla tion Co mplet ed (fig ure 27) .
Not e: the up ward in struc tions a re only s uitab le for th e dista nce H whi ch betw een 200 -600m m; if the d istan ce is
gre ater th an 600m m, plea se foll ow the st eps as be low:
1)In stall t he hang ing bra cket at a r equir ed posi tion be fore ce iling f itmen t (M12 ba r is not pr ovide d) (fig ure 28) .
2)Sa w an oblo ng groo ve at a com plete d ceili ng (not e: plea se ensu re the ha nging b racke t must be i nstal led in th e
mid dle of th is groo ve) (fi gure 29 ). The re st of ste ps can fo llow th e instr uctio ns as bef ore!
Fig ure27
Fig ure29
Fig ure28
Two Ha nging
Boa rds are i n middl e.
L( ) 26m mTota l lengt h of scre en min us
Not c omple ted cei ling
H 100min us
100
L 94min us
158
79
Pow er Box
Scr ew
Rubbe r Scr ew
End C ap Boar d
Pow er Line
Line Cover
100
Button F unction and Op eration Inst ruction :
1.Pres s UP button to lift t he screen
2.Pres s STOP button to st op the screen
3.Pres s DOWN button to l ower the scree n
4.Pres s MICRO-UP butt on to retract th e screen in smal l
increm ents(150ms f or each moveme nt)
5.Pres s MICRO-DOWN b utton to lower t he screen in sma ll
increm ents (150ms fo r each movemen t)
Cautio ns:
1.The mi nimum distan ce between Con troller and Re ceiver: 50cm
2.Worka ble within 8m in h orizontal di rectionfro m the Receiver t o the
Contro ller
3.Do not c over the Contr oller’s lau nching port wh ile operatio n
4.Stri ctly banoper ation in wet or hi gh temperatu re environme nt.
5.Repl acing batter ies when the sig nal is faint or no s ignal.
6.Batt eries for the Co ntroller: 2 un its CR2032 but ton cells.
LED
UP
STOP
DOWN
Micro -up
Micro -down
Model :AC127