Grandio ELITE, Elite Series, Elite GRA-ELI-8XA, Elite GRA-ELI-4X, Elite GRA-ELI-8A User Manual

...
GREENHOU S E S
GRANDIO
GREENHOUSE USER MANUAL
© 2013 Grandio Greenhouses, Backyard Living Source Inc. All rights reserved
2015 Manual Edition Extendable Greenhouses
Grandio Elite 8x8 Shown In Image
2015 GRANDIO ELITE 8x8 KIT MANUAL
INCLUDES INSTRUCTIONS FOR BACK DOOR TRANSFORMATION
GREENHOU S E S
GRANDIO
Before you begin take time to complete this check list.
Take inventory of all parts using the parts list at the back of this manual. Instruction for the Back Door Transformation kit are noted in this manual.
Be cautious where you place the polycarbonate panels as they will burn grass
or plants if left on top of them in direct sunlight. Note that clear film side of panels should always face the sun and opal film side faces inside greenhouse.
Panels may scratch easily so be very carful what you clean them with.
Plan out when and where you are going to place the greenhouse, we recom­mend that you place it in an area that will receive direct sunlight and will be protected from the wind as much as possible
It will take at least (2) people to put the greenhouse together.
Before your build, make sure you are allowed to build it! Consult all building codes, as well as City or Municipality ordinances and HOA’s, as you may need a permit or documentation before you build.
Contact your insurance company to make sure your Grandio Greenhouse will be covered on your policy.
Call your local utilities companies before digging.
Do not attempt to begin construction on a windy day.
Your greenhouse should be built on a flat level surface allowing for drainage.
Read this entire manual to get familiar with all pieces and parts prior to beginning assembly. Follow the steps outlined in the order presented!
Save this owner’s manual for future
reference and if you need our help.
CONTACT OUR CUSTOMER SERVICE
DEPARTMENT at:
1-866-448-8231
Hours: 8:30a.m.-5:00p.m. Monday through
Friday (Mountain Standard Time)
Backyard Living Source
9543 W. Emerald St., Suite 101
Boise, ID 83704
www.grandiogreenhouses.com
IMPORTANT! PLEASE READ BEFORE BEGINNING ASSEMBLY
Dear Valued Customer, We would like to congratulate you on your new
Grandio Greenhouse purchase. We are confident
that you have made the right decision in choos­ing Grandio. Our greenhouses are made with high quality aluminium and polycarbonate and will last for many garden seasons to come.
Please take the time to carefully read this instruction manual for an easier and more enjoyable assembly experience.
Cheers!
Grandio Greenhouses
1
IMPORTANT! SAFETY INSTRUCTIONS
FAILURE TO FOLLOW THESE WARNINGS MAY RESULT IN SERIOUS INJURY OR
PROPERTY DAMAGE AND WILL VOID WARRANTY.
To ensure safety, do not attempt to assemble this product without following the instructions carefully. Check entire box and inside all packing material for parts and/or additional instruction materials. Before beginning assembly, read the instruc-
tions and identify all parts using the hardware identifier and parts list on pages 67-76. Complete assembly and proper usage are essential to reduce the risk of accident or injury when using your Grandio Greenhouse.
CAUTION: Do not leave polycarbonate panels laying on grass or leave in the sun or extreme heat, keep in a cool
dry place until they are to be installed!! (May cause burning to plants or grass if left directly on top of them, also may damage panels due to the protective lm adhering to panels.) Panels may scratch easily. Do Not use solvent cleaners.
Each of the polycarbonate panels have a clear lm side that should always face the sun, and a white lm side which faces inside. The clear side has a UV coating and we recommend marking a small “x” on a corner of each panel to determine which side has the UV Coating as you cannot visually determine with your eye in the case of future disassembly.
• Due to shipping, the grooves of some of the aluminum proles may be too small to insert into the polycarbonate sheet, you may
carefully use a screwdriver to pry the framework open so the polycarbonate sheet can be inserted smoothly.
• Do not use or store hot objects such as grills, blow torches, welding equipment, etc. in or near your greenhouse.
• Do not allow children or pets to play in greenhouse or in the set up area until assembly is complete.
• If using a ladder during assembly, use extreme caution.
• A clean level surface is essential to maintaining the solid integrity of the structure, Install the base correctly as described in
manual. Please anchor the greenhouse down to a rm and level base.
TOOLS YOU WILL NEED FOR ASSEMBLY
• Tape Measure • 2 Step Ladders • Safety Glasses
• Level • Work Gloves • Drill
• Carpenter Square • Permanent Marker • Knee Pads
• At Least 2 Adults • Masking Tape • Folding Utility Table
GRANDIO
TIP
When you see this icon
pay special attention to
the helpful tips we have provided that will
make installation more ecient.
2
PREPARE A FOUNDATION FOR YOUR
GRANDIO GREENHOUSE
3
8X8 GRANDIO ELITE BARN STYLE
GREENHOUSE DIMENSIONS
ROOF PEAK HEIGHT
1
3
/
4
GUTTERS
61”
EAVE HEIGHT
DOOR HEIGHT
97 3/8”
44”
8X8
LEFT SIDE
97 3/8”
74”
95 5/16”
BASE
3
1
/
4
Before assembling your new greenhouse, a proper foundation must be prepared. A number of anchor­ing options are acceptable, based on wind and ground conditions in your area.
Pre-read pages 6-9 for base kit assembly information.
Go to www.grandiogreenhouses.com for founda­tion ideas and tour our online learning center for tips, tricks and videos for putting your greenhouse together.
Transparent Film
Opal White Film
Polycarbonate Panels
Sun
The UV-Protected side is covered with transparent lm and must face toward the sun. The side covered in white lm will always face the interior of the greenhouse. We suggest you peel all lm o completely prior to assem­bly and use a permanent marker to place a small “X” on the lower right corner of each panel on the transparent side that faces the sun, each panel has a sticker labeling the panel number and this side always faces the sun or outward as well. DO NOT REMOVE LABELS UNTIL YOU INSTALL PANELS. The “X” is suggested in case you dis-assemble your greenhouse in the future so you may identify which side has the UV coating. Always use gloves when handling the polycarbonate panels as the edges can be very sharp.
IMPORTANT: POLYCARBONATE PANELS
BACK
FRONT
620
LEFT SIDE RIGHT SIDE
4
603C
L08D
603D
601B
601B
620
604-R
601A-FL
601A-FR
601B
601B
619
L08D
603C
603E
602C
602D 602D
601B
601B 601B
601B
L08B-X
601A-B
L08B
603C603C
601A-B
L08B-X
622
622
604-L
602A
602A
602A
602A
602A
602A
602B
602B
602B
602B
602B
602B
609
609
609
609
607
L21
610610
630
630
610
610
630
630
601A-B
601A-B
601A-FL
601A-FR
L08A-X
L08A-X
L08C-X
L08C-X
609 609
610
630
609
609
610
630
L08A
622-L
622-R
603C 603C
L08C-X
603C/616
618
603C/616
618
L08C-X
623B
623B
623B
623B
606-WS
606-WS
Y7
Y7
Y7
Y7
Y7
Y7
Y7
Y7
Y8
Y8
Y8
Y11
Y9 Y10
Y10 Y9
Y8
Y8
Y8
Y11
Y11
Y11
Y11
Y11
Y11
Y11
Y3-1 Y3-2
Y2-2Y2-1
Y6 Y6
Y6 Y6Y1 Y1
Y1 Y1Y1 Y1
Y4-1Y4-2
Y5-1Y5-2
Outside View
DIAGRAM SHOWS THE ASSEMBLED
(8’x8’ BASIC CONFIGURATION)
(GRA-ELI-8A & GRA-ELI-8P & GRA-BA-8)
8x8 ELITE KIT INCLUDES, FRONT,
BACK, BASE AND SIDES.
BA-S2
BA-S2
BA-S1
BA-S1
606-WS
606-WS
606-WS
606-WS
606-WS
606-WS
606-WS 606-WS
606-WS
606-WS
606-WS 606-WS
5
ASSEMBLY INSTRUCTION STEPS
PREPARE FOR ASSEMBLY
STEP ONE: BASE ASSEMBLY
STEP TWO: FRONT ASSEMBLY
STEP THREE: BACK ASSEMBLY
STEP FOUR: MIDDLE ASSEMBLY
STEP FIVE: DOOR ASSEMBLY
STEP SIX: INTERIOR ROOF SUPPORTS
GREENHOU S E S
GRANDIO
©
Introduction............................................................1
Safety Instructions...............................................2
Prepare For Assembly..........................................3
Diagram of Assembled Grandio Elite 8x8......4
Base Kit Assembly Information........................6
Base Kit Parts Lists...............................................7
Base Kit Assembly and Installation.............8-9
Front Wall Assembly.....................................10-15
Back Wall Assembly......................................16-21
Middle Assembly............................................22-37
Door Assembly................................................38-43
Interior Roof Supports.......................................44
GRA-ELI-8A Parts List...................................45-47
GRA-ELI-8P Parts List.........................................48
GRA-ELI-BD Parts List........................................49
Warranty.................................................................50
BASE KIT ASSEMBLY INSTRUCTIONS
6
STEP ONE
Pre-Plan The Placement Of Your Structure
Allow enough room to get a wheel barrow in and around your structure.
Be sure the orientation will allow for proper drainage in and around your greenhouse.
It is recommended that you place your greenhouse in an area of your property that receives the most sunlight but is also somewhat protected by trees, fencing or your home for wind protection and also to keep the temperature up during early spring and late fall.
The best placement depends on the features of your property, it is suggested in most scenarios to have your greenhouse face South on its broadest side and to have the door face East or West depending on typical wind directions in your area. Do not worry if your orientation will not allow for the placement to be as suggested, as a greenhouse that is facing North is better than no greenhouse at all.
Avoid building your greenhouse at the base of a slope as these are often frost pockets where cold air collects, this will not be good for your greenhouse in keeping the temperature up inside.
Extreme Wind Conditions: If you live in a windy location there is no way to build a 100% storm safe greenhouse, but there are a number
of things you can do to minimize the chance of damage. Ensure that the base is level and square, be sure all panels are tightly in place and that
all aluminum extrusions are tight. The main problem is usually that wind gets into the greenhouse and the pressure pushes a panel out and then the force of the wind on the interior causes more damage. It is best if you are expecting an extreme weather event that you disable any auto roof vents and make sure all doors and windows are closed and locked shut. Also you may need to build a wind break for extreme condi­tion areas where wind is constant and extreme.
It is ideal for your greenhouse to have water, electricity and even gas plumbed into place before construction. This will make watering plants and keeping the temperature and air circulation to the max eciency.
For Cement Base Installation: We suggest you use wedge style concrete anchoring bolts to secure your structure.
For Deck Base Installation: We recommend you use a set of anchoring bolts to secure your structure.
For Earth Installation: We recommend you use the anchoring system provided and bury corner posts into the ground and seal into place
with quickrete.
BASE KIT PARTS LIST FOR 8’X8’
BA-S1
BA-S2
BA-C3
97 3/8 in / 2474 mm
94 1/4 in / 2394 mm
5 7/16 in 138 mm
GRAPHIC PART NAME SIZE/LOCATION QUANTITY
2
2
4
BA-S1
BA-S2
BA-S1
BA-S2
BA-C3
BA-C3
BA-C3
BA-C3
1.1 Layout all base kit pieces to prepare for assembly. Note that
one BA-S1 will be at the front and one BA-S1 will be at the back and the BA-S2’s will be on the sides. See diagram .
BA-S03
BA-M03
W05
BA-A1
M6*14
NUT
CLIP
9 13/16 in / 250 mm
GRAPHIC PART NAME SIZE/LOCATION QUANTITY
28
28
9
4
7
STEP ONE
panels should always face the sun and opal film side faces inside greenhouse.
Panels may scratch easily so be very carful what you clean them with.
Plan out when and where you are going to place the greenhouse, we recom- mend that you place it in an area that will receive direct sunlight and will be protected from the wind as much as possible
It will take at least (2) people to put the greenhouse together.
Before your build, make sure you are allowed to build it! Consult all building codes, as well as City or Municipality ordinances and HOA’s, as you may need a permit or documentation before you build.
Contact your insurance company to make sure your Grandio Greenhouse will be covered on your policy.
Call your local utilities companies before digging.
Do not attempt to begin construction on a windy day.
Your greenhouse should be built on a flat level surface allowing for drainage.
Read this entire manual to get familiar with all pieces and parts prior to beginning assembly. Follow the steps outlined in the order presented!
Save this owner’s manual for future
reference and if you need our help.
CONTACT OUR CUSTOMER SERVICE
DEPARTMENT at:
1-866-448-8231
Hours: 8:30a.m.-5:00p.m. Monday through
Friday (Mountain Standard Time)
Backyard Living Source
9543 W. Emerald St., Suite 101
Boise, ID 83704
www.grandiogreenhouses.com
1.2 Slide the BA-C3 into the BA-S1, slide the BA-S2 into the BA-C3, align the holes and push together to an even and tight
position and use the BA-S03 bolt and BA-M03 collard nut combo, tighten the collard nut on the inside of the base kit using the 10mm wrench. Repeat this process on all corners. See and . Note: Placement of BA-S1 will be at front and the back, while the BA-S2’ s will be the sides of your greenhouse base.
1.3 For ground installation only insert the (4) BA-A1’s and (4) BA-S03/ML01 combos to the four corners as shown in .
When all of the BA-A1’s are installed you can adjust the bolts to level the base. If you are installing on a at mount surface see page 9.
BASE KIT ASSEMBLY INSTRUCTIONS
8
STEP ONE
BA-S1
BA-S2
FRONT
SIDE
BA-C3
BA-A1
BA-S03 ML01
BA-C3
BA-S1
BA-S2
BA-S03
BA-M03 Collared Nut
BA-S03
BA-M03 Collared Nut
BA-A1
BA-S03
Outdoor
Ground
Assembly
BA-A1 must be buried in ground.
Dig holes to bury the BA-A1’s, you determine size and depth for your location.
BASE KIT ASSEMBLY INSTRUCTIONS
BA-S2
BA-A1
BA-S1
BA-S03
Base
Deck or
Patio
Assembly
BA-A1 * Must be inserted into the ground, and secured with concrete.
GRANDIO
TIP
Make sure base is squared
and level before setting anchor into concrete. Use a measuring tape to ensure all corners are the same. Use level on all four sides.
**BASE MUST BE LEVEL & SQUARE, FOUNDATION MUST BE PROPERLY ANCHORED PRIOR TO GREENHOUSE ASSEMBLY
B
Holes are present in base kit for anchoring bolts
You determine and aquire proper fastener prior to installation.
Discard the BA-A1 for deck installations.
OR
Use: Quikrete fast setting concrete to anchor base. Pour in Quikrete and water no mixing required. (Not Included).
DECK OR PATIO
INSTALLATION
BA-S1
BA-C3
BA-S2
B
9
STEP ONE
If surface is uneven you may want to purchase large washers that will fit under the base and allow fasteners to go through to use as a shim for leveling the base kit.
Use an appropriate fastener to attach to your surface through these access holes.
10
STEP TWO
FRONT FRAME ASSEMBLY INSTRUCTIONS
ALWAYS ASSEMBLE FRONT HORIZONTAL
GRANDIO
TIP
Lay at on ground to
assemble the front frame of your greenhouse. If possible try to nd a shady area protected from the wind. Panels can burn grass and plants if in direct light.
GRANDIO
TIP
We recommend watching
our how to assembly videos with tricks and tips for easier assembly and installation of your Grandio Greenhouse at:
www.grandiogreenhouses.com
603C
L08D
603D
601B
601B
604-L
601A-FR 601A-FL
601B
601B
619
L08D
603C
603E
604-R
Y3-1
Y3-2
Y1 Y1
Y2-2 Y2-1
L08A-X
L08A-X
GRANDIO
TIP
BOLT INSTALLATION TIP:
Locate all nuts and bolts, pre
thread and place in the groove of the extrusion to make installation easier. Move up or down for exact placement.
606-WS
606-WS
Inside View
This picture shows the inside view of front section fully assembled.
All parts for front assembly will be found in box GRA-ELI-8A and GRA-ELI-8P.
We recommend that you assemble the front on a tarp.
* If you purchased the Back Door Transformation kit you will repeat this section for your
back wall using parts found in the GRA-ELI-BD box.
If you want to purchase the Back Door Transformation kit call 1-866-448-8231.
11
STEP TWO
2.1 Prethread all S05 screws into the WG01
and WG02’s for ease of installation, see only turn S05 a few turns.
2.2 Use WG01 bracket to attach the (2)
601B’s together with the 603E, secure parts with the S05 screws provided see . The WG01 will slide into the groove of the 601B’s, and also slide into the groove of the 603E, screw head will remain outside chan- nel.
2.3 Install WG02’s into (2) 601B’s then
tighten S05 screws when extrusions are completely tight see . Note: the fat end of the WG02 will always be on the bottom side see .
GRANDIO
TIP
PRETHREAD SCREWS TIP:
Locate all WG01, WG02, and S05 screws, pre thread these to make installation easier. Note that the fat end on the WG02 will always face downward.
Inside View
601B
601B
601B
601B
603E
WG01
WG02
WG02
WG01
601B
601B
S05
WG02
601B
603E
WG02 WG02
WG01
FAT END
FAT END
IMPORTANT: Use only S05 Screws, other screws may damage frame.
FRONT FRAME ASSEMBLY CONTINUED
ALWAYS ASSEMBLE FRONT HORIZONTAL
12
STEP TWO
2.4 Insert polycarbonate panels Y3-2 and
Y3-1 into place as shown in .
2.5 Attach 603E and 603D with W04
and S04/ML01 fasteners as shown in .
2.6 Attach the 603D to the 601B’s
using the W04-1’s with the S04/ML01 fasteners on both sides as shown in .
Y3-1
Y3-2
601B
601B 601B
601B
603E
WG01
WG02
WG02
603D
W04
W04-1 W04-1
S04 ML01
W04
603E
603D
W04-1
603D
601B
GRANDIO
TIP
BOLT INSTALLATION TIP:
Locate ML01/S04 nuts and
screws, loosely pre thread into the W04 and W04-1’s and place in the groove of the extrusion to make installation easier.
W04
W04-1
Inside View
Transparent Film
Opal White Film
Polycarbonate Panels
Sun
The UV-Protected side is covered with transparent lm and must face toward the sun. The side covered in white lm will always face the interior of the greenhouse. We suggest you peel all lm o completely prior to assem­bly and use a permanent marker to place a small “X” on the lower right corner of each panel on the transparent side that faces the sun, each panel has a sticker labeling the panel number and this side always faces the sun or outward as well. DO NOT REMOVE LABELS UNTIL YOU INSTALL PANELS. The “X” is suggested in case you dis-assemble your greenhouse in the future so you may identify which side has the UV coating. Always use gloves when handling the polycarbonate panels as the edges can be very sharp.
IMPORTANT: POLYCARBONATE PANELS
FRONT FRAME ASSEMBLY CONTINUED
ALWAYS ASSEMBLE FRONT HORIZONTAL
13
STEP TWO
2.7 View diagrams and attach the (2) 604’s and (2)
601A’s to the 619. Note the orientation of the 604’s,
there are 4 dierent 601A’s (2) for the front and (2) for the back with dierent hole placements. See diagram on this page. The 601-FR and the 601-FL will have a hole at the top side and will face forward.
shows where the corner pieces attach to 619.
shows where the door frame attaches to the 619.
*If assemblling the back door you will need to drill 1/4 inch holes in 601-B’s to match the front wall, these holes should face the ground during assembly.
S04
ML01
604-R
619
INSIDE DOOR FRAME
TIP: If necessary you may use a screwdriver to wedge behind the
bolt head. This prevents bolt from falling into the track.
S04
601A-FR
ML01
619
INSIDE
Inside View
GRANDIO
TIP
Note the larger holes on 601A-FR and 601A-FL front pieces need to face the
top front of the greenhouse.
GRANDIO
TIP
BOLT INSTALLATION TIP:
Locate all nuts and bolts, pre thread and place in the groove of the extrusion to make installation easier. Move up or down for exact placement.
601A-FL
601A-FR
604-R 604-L
619
INSIDE
OUTSIDE
INSIDE
OUTSIDE
INSIDE
OUTSIDE
OUTSIDE
INSIDE
Inside View
FRONT FRAME ASSEMBLY CONTINUED
ALWAYS ASSEMBLE FRONT HORIZONTAL
14
STEP TWO
Polycarbonate panel
606-WS
619
GRANDIO
TIP
Transparent Film
Outside Greenhouse
Opal White Film
Inside Greenhouse
Polycarbonate
Panel
Sun
Inside View
Y1
Y1
604-L604-R
619
606-WS
606-WS
601A-FL
601A-FR
OUTSIDE
2.8 Attach 606-WS to 619, this will hold the
polycarbonate panels in place. If it seems too tight slide ngers or nut driver along edges, gently stretching the 606-WS to allow room for panels to t .
2.9 Insert Y1 polycarbonate panels into
place, make sure Y1’s slide completely into 606-WS as shown in .
2.10 Set (2) 603C’s atop the Y1 panels, then
attach (2) L08D’s to the 603C’s, 601A’s and 604’s using S04/ML01 fasteners, make sure it
is snug with the tops of the Y1 panels, then tighten fasteners. See .
2.11 Insert the Y2-2 and Y2-1 polycarbonate
panels as shown in .
S04/
ML01
603C
L08D
601A
604
603C
L08D
604-L
601A-FL
601A-FR
L08D
603C
604-R
Y1 Y1
Y2-2 Y2-1
601A-FR
604-R
603C
L08D
FRONT FRAME ASSEMBLY CONTINUED
ALWAYS ASSEMBLE FRONT HORIZONTAL
2.12 Move roof and front section together
and align the WG02’s into the 601A’s, and the W04-2’s into the 604’s. Insure a snug t
between the WG02’s, 601B’s and 601A’s and then tighten the S05 screw as shown in . Tighten the W04-2’s with the S04 /ML01 nut and bolt as shown in .
2.13 Attach the L08A-X’s to L08D’S and
604’s to square front section loosen S04/ML01 attached to the bottom of the (2) 604’s, square the frame with carpenter square
or use a measuring tape to make sure corner measurements are the same, also check distance across from the top of 601A’s, and also to the bottom of the 601A’s across, make sure distance is the same. Tighten L08A-X’s to hold squareness as shown in .
15
STEP TWO
603C
L08D
604-L
601A-FL
601A-FR
619
L08D
603C
604-R
Y1
Y1
Y2-2 Y2-1
Y3-1
Y3-2
601B
601B
Inside View
W04-2
W04-2
WG02
WG02
S05
L08A-X
L08A-X
W04-2
604
603D
S04 ML01
WG02
Fat End
UP
Profile View
L08A-X
601A-FL
S04 ML01
603D
603C
L08D
WG02
601B
S05
601A-FR
S05
FRONT FRAME ASSEMBLY CONTINUED
ALWAYS ASSEMBLE FRONT HORIZONTAL
Loading...
+ 36 hidden pages