Repair
Drum Roller Kit
For transfering drums on and off a supply unit.
Model 255627
Important Safety Instructions
Read all warnings and instructions in 312371 manual. Save these instructions.
See page 4 for model information and approvals.
312492B
Graco Inc. P.O. Box 1441 Minneapolis, MN 55440-1441
Copyright 2007, Graco Inc. is registered to I.S. EN ISO 9001
ti10951a
Maintenance
Maintenance
Read all warnings and instructions in 312371 manual.
Caution
The maximum weight capacity of the drum roller kit is
6,500 lbs. (2948.35 kg).
Assemble
1. Lay two side frames (2) on the ground. See parts
illustration on page 3.
2. Install two cross frames (3), roller (1), and roller
frame stop (4) on top of the two side frames (2).
3. Tigten screws (5) on the roller frame stop (4).
Install
1. Remove the drum from the supply unit and put the
ram in down position.
2. Relieve pressure.
platen
lift rod
FIG. 1
strapping
ti10925a
Operation
1. Follow instructions Starting and Adjusting Ram in
manual 312371.
2. Position full drum of material with bottom edge of
drum on roller using drum dolly, fork lift, etc.
3. Roll drum into position on ram base.
3. Disconnect air hoses.
4. Turn OFF power.
5. Put the ram director valve in the neutral position.
6. Wrap strapping outside of the platen lift rods and lift
the supply unit with a secure hoist.
7. Postion the roller kit at desired location. See Parts
illustration on page 3 for bolt hole location.
8. Slowly lower the supply unit on the drum roller kit.
Line up the holes of the drum roller kit and the supply unit base.
9. Install 1/2 in. (13 mm) anchors (not supplied)
through the ram base and drum roller kit to secure
the supply unit to the ground.
2 312492B