
Assembly Instruction Sheet
P
lease go to the Care + Maintenance selection.
Tools Required: Flathead screwdriver, Phillips screwdriver, pliers, wire cutters, wire strippers, electrical tape, safety glasses.
Light Source:
Estimated Assembly Time:
Preparation:
present. If any parts are missing or damaged, do not attempt to assemble, install, or operate the fixture. Contact customer service for replacement
parts.
Warnings and Cautions
Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.
These instructions are provided for your safety. It is very important you read them completely before installing the fixture. We strongly
recommend that a licensed, professional electrician perform the installation.
Disconnect fixture from power source before replacing bulbs. Make sure bulbs are given sufficient time to cool before removal.
(3)A19 Medium Base Bulbs 100W Maximum
30-45 minutes
Identify and inspect all parts before beginning installation. Check package content list and diagrams below to be sure all parts are
Package Contents
Diffuser
C
x1
Crossbar Assembly
A
x1
Fixture Body
B
x1
STEP 1 Install Crossbar Assembly-
A. Pass the supply wires through the Crossbar Assembly (A). Attach
the Crossbar Assembly (A) to the Outlet Box with the head of the
Green Ground Screw facing you. Secure it with Outlet Box Screws
(not included). Tighten until snug.
Figure 1
D
Center
Stem
x1
Hex
Nut
G
x1
Outlet Box
E
F
H
Rubber
Washer
x1
Flat
Washer
x1
Finial
x1
(Step 2 Continued)
Assembly (A) by unscrewing the preassembled hex nut and lock
washer and then screwing the mounting screws in or out of the
crossbar until the correct length is achieved. Once the ceiling
canopy and Fixture Body (B) is secure, remove the mounting ball
and Fixture Body (B)) and proceed to Step 3.
Ceiling
Canopy
STEP 3 - Wire Connections
A. Wrap bare or green ground wire around green ground screw on the
crossbar, no less than 2 inches from the end of the wire. Tighten the
green ground screw.
B. Use standard wire connectors (not included) to make all wire
connections. Twist connectors until wires are tightly joined together.
Wrap each connection with approved electrical tape and carefully
stuff all the connected wires into the Outlet Box.
A
Figure 2
Hex Nut and
Lock Washer
Mounting
Screw
Mounting
Ball
A
Outlet Box Screws
(not included)
STEP 2 - Test Fit the Ceiling Canopy to the Crossbar Assembly
A. Remove the mounting balls from the Crossbar Assembly (A). Place
the ceiling canopy and Fixture Body (B) onto the Crossbar Assembly
(A) and secure with mounting balls. Note: The ceiling canopy should
be snug against the ceiling and held tight with the mounting balls. If it
is not, adjust the length of the mounting screws on the Crossbar
Supply Wires with
Ground Wire
1of2
White wire
from outlet box
Black wire from
outlet box (or Red)
Bare, or Green
Ground wire
from outlet box
Green Ground Screw
on the Crossbar
White wire
from fixture
Black wire
from fixture
Ground wire
from Fixture
Figure 3
RevisedDate:2017-11-03

STEP 4 Install Fixture Body-
A. Carefully tuck all wires into the outlet box and position the Ceiling
Canopy over the outlet box. Align the holes in the Ceiling Canopy
with the mounting screws, then attach the Ceiling Canopy using the
previously removed mounting balls. Hand tighten until snug.
FINISH:
MOTTLED COCOA
Ceiling
Canopy
A
Mounting
Screw
Mounting
Ball
Figure 4
STEP 5 - Install Bulbs and Diffuser
A. Thread the beaded end of Center Stem (D) onto the hex coupling
underside of socket clusters and hand tighten until snug.
B. Insert bulbs onto sockets and screw snugly into place.
C. Place Diffuser (C), Rubber Washer (E) and Flat Washer (F) over the
end of the Center Stem (D). Secure them with Hex Nut (G)and
tighten until sung.
D. Thread the Finial (H) onto end of the Nipple and hand tighten until
sung.
Your fixture is now assembled and ready to use. Enjoy!
14”Dia.
12”Dia.
9.75”Dia.
13.5”Dia.
14”Dia.
16”Dia.
NOTE: ALL DIMENSIONS ARE ROUNDED UP
TO THE NEAREST 1/4"
7”
7.25”
9”
Bulb (not
supplied)
Socket
Hex
Coupling
D
C
E
F
G
H
Figure 5
2of2
RevisedDate:2017-11-03